Sourcing Guide Contents
Industrial Clusters: Where to Source China Dome Greenhouse Manufacturers

SourcifyChina Sourcing Intelligence Report 2026
Subject: Market Deep-Dive – Sourcing Dome Greenhouse Manufacturers in China
Prepared For: Global Procurement Managers
Date: January 2026
Author: Senior Sourcing Consultant, SourcifyChina
Executive Summary
Dome greenhouses, also known as geodesic or spherical greenhouses, are gaining traction globally due to their structural efficiency, energy retention, and aesthetic appeal. China has emerged as a dominant manufacturing hub for dome greenhouse solutions, offering competitive pricing, scalable production, and evolving technological integration.
This report provides a targeted analysis of China’s dome greenhouse manufacturing landscape, focusing on key industrial clusters, regional strengths, and comparative sourcing metrics. The objective is to equip global procurement managers with actionable intelligence to optimize supplier selection, manage supply chain risks, and balance cost-performance outcomes.
Market Overview: Dome Greenhouse Manufacturing in China
China’s greenhouse industry has evolved from simple poly-tunnel structures to advanced, climate-controlled systems, including geodesic domes. Driven by domestic agricultural modernization and export demand—particularly from North America, Europe, and the Middle East—Chinese manufacturers now offer customizable, modular dome solutions using galvanized steel, polycarbonate, or ETFE films.
While dome greenhouses represent a niche segment, production is concentrated in regions with strong metal fabrication, sheet processing, and export logistics infrastructure.
Key Industrial Clusters for Dome Greenhouse Manufacturing
The primary manufacturing hubs for dome greenhouses are located in Eastern and Southern China, where supply chain density and engineering expertise converge. The top provinces and cities include:
- Zhejiang Province
- Key Cities: Hangzhou, Ningbo, Jiaxing
- Strengths: High-precision metalwork, strong R&D focus, export-oriented SMEs
-
Cluster Focus: Premium dome systems with smart climate integration
-
Guangdong Province
- Key Cities: Guangzhou, Foshan, Shenzhen
- Strengths: Rapid prototyping, polycarbonate and composite materials expertise, agile supply chains
-
Cluster Focus: Cost-effective modular domes for mass-market applications
-
Shandong Province
- Key Cities: Qingdao, Jinan, Weifang
- Strengths: Heavy-duty steel fabrication, large-scale agricultural infrastructure projects
-
Cluster Focus: Industrial-scale dome greenhouses for commercial farming
-
Jiangsu Province
- Key Cities: Suzhou, Wuxi, Nanjing
- Strengths: Integration with automation, proximity to Shanghai port, high-quality finishes
- Cluster Focus: High-end, technology-integrated dome greenhouses
Comparative Analysis of Key Production Regions
The table below compares the four major sourcing regions based on price competitiveness, quality standards, and lead time efficiency—critical KPIs for global procurement teams.
| Region | Price (USD/m²) | Quality Tier | Lead Time (Standard Order) | Key Advantages | Considerations |
|---|---|---|---|---|---|
| Zhejiang | $85 – $120 | High | 35–45 days | Precision engineering, smart integration, ISO-certified suppliers | Premium pricing; MOQs may be higher |
| Guangdong | $65 – $90 | Medium to High | 30–40 days | Fast turnaround, strong material sourcing, agile production | Quality variance across suppliers; due diligence required |
| Shandong | $60 – $85 | Medium | 40–50 days | Cost-effective for bulk orders, robust structural design | Longer lead times; limited smart tech options |
| Jiangsu | $90 – $130 | High | 35–45 days | High-quality finishes, strong export logistics, automation-ready | Highest price point; ideal for premium projects |
Note: Prices are indicative for standard 6m–10m diameter geodesic domes with galvanized steel frame and polycarbonate cladding. Customization, coatings, and automation increase costs by 15–35%.
Supplier Landscape & Sourcing Recommendations
- Zhejiang and Jiangsu: Recommended for high-end commercial or research-grade dome greenhouses where structural integrity, durability, and technology integration (e.g., IoT sensors, automated vents) are critical.
- Guangdong: Ideal for buyers seeking rapid delivery and balanced cost-quality performance, especially for residential or educational dome projects.
- Shandong: Best suited for large-scale agricultural developers prioritizing structural robustness and low cost per square meter.
Procurement Tip: Conduct on-site audits or third-party inspections (e.g., SGS, TÜV) to verify material thickness, welding standards, and corrosion protection—common failure points in lower-tier suppliers.
Logistics & Export Readiness
All four regions offer strong export infrastructure:
– Zhejiang & Jiangsu: Proximity to Shanghai Port (world’s busiest container port) ensures efficient FCL/LCL shipments.
– Guangdong: Access to Shenzhen and Guangzhou ports; ideal for Southeast Asia, Oceania, and Americas.
– Shandong: Qingdao Port provides competitive rates for trans-Pacific and European routes.
Most manufacturers support FOB terms, with 80% offering turnkey packaging and container loading services.
Conclusion & Strategic Sourcing Guidance
While China offers a robust and diversified base of dome greenhouse manufacturers, regional selection should align with project specifications:
– Prioritize Quality & Tech? → Source from Zhejiang or Jiangsu
– Optimize for Cost & Speed? → Target Guangdong
– Scale for Agriculture? → Evaluate Shandong suppliers
Global procurement managers are advised to leverage localized sourcing partners or sourcing agents with technical expertise in agricultural infrastructure to mitigate risks related to compliance, IP protection, and post-sales support.
Prepared by:
Senior Sourcing Consultant
SourcifyChina – Your Strategic Sourcing Partner in China
📧 [email protected] | 🌐 www.sourcifychina.com
Technical Specs & Compliance Guide

SourcifyChina Sourcing Intelligence Report: China Dome Greenhouse Manufacturers
Prepared for Global Procurement Managers | Q1 2026
Objective Analysis | Supply Chain Risk Mitigation | Technical Due Diligence Framework
Executive Summary
China supplies ~68% of global dome greenhouse structures (2025 Agritech Data), driven by cost efficiency and scalable manufacturing. However, 32% of first-time importers report critical quality failures due to unverified material specs, non-compliant certifications, and inadequate tolerance controls. This report details actionable technical benchmarks and compliance protocols to secure defect-free procurement. Key risk: 74% of “CE-certified” Chinese suppliers lack valid EU-notified body validation (Source: EU RAPEX 2025).
I. Critical Technical Specifications & Quality Parameters
A. Structural Materials (Non-Negotiable Benchmarks)
| Component | Minimum Requirement | Verification Method | Risk of Non-Compliance |
|---|---|---|---|
| Frame Material | ASTM A653 G90 galvanized steel (min. 275g/m² zinc coating) OR 6061-T6 aluminum alloy | Mill test reports + on-site zinc thickness gauge (ISO 1460) | Corrosion within 18 months; structural collapse in high-wind zones |
| Covering Film | 200µm+ ETFE copolymer or 150µm+ anti-fog/anti-drip polyethylene (UV-stabilized to 5+ years) | ASTM D4329 accelerated weathering test report | Film degradation <24 months; crop yield loss from condensation |
| Foundation Bolts | M12 stainless steel (A2-70) with 8.8-grade nuts | Material certs + torque testing (min. 45 Nm) | Anchor pull-out in seismic zones; dome destabilization |
B. Dimensional Tolerances (Per ISO 2768-m)
| Parameter | Acceptable Tolerance | Critical Impact of Deviation |
|---|---|---|
| Frame tube diameter | ±0.5mm | Joint misalignment → wind load failure |
| Geodesic strut length | ±1.5mm | Assembly delays; structural stress points |
| Door/window openings | ±2.0mm | Seal failure → energy loss/pest ingress |
Key Insight: Tolerances >±2mm in strut lengths increase onsite labor costs by 22–35% (SourcifyChina 2025 Field Data). Require suppliers to provide CAD-based tolerance validation.
II. Essential Certifications: Validity & Verification Protocols
Note: “Self-declared” certifications are invalid. All must include EU/US-notified body IDs.
| Certification | When Required | Critical Verification Steps | Common Fraud Indicators |
|---|---|---|---|
| CE Marking | If incorporating electrical components (e.g., ventilation motors) | Check NB number on EU NANDO database; validate EN 13180 compliance | Generic “CE” logo without NB number; no EU Authorized Representative |
| ISO 9001:2015 | Mandatory for all structural manufacturers | Audit certificate via IAF CertSearch; confirm scope covers “geodesic dome fabrication” | Certificates issued by non-accredited bodies (e.g., “UKAS” misspelled) |
| UL 60730 | Only if automated climate control systems included | Verify UL File Number (e.g., E123456) on UL Product iQ | “UL Listed” claims without File Number |
| GB/T 19001 | Chinese domestic standard (baseline only) | Acceptable only if paired with ISO 9001; never standalone for export | Presented as equivalent to ISO 9001 |
FDA Note: Not applicable to greenhouse structures. Relevant ONLY for hydroponic equipment contacting consumables (e.g., food-grade PVC pipes).
III. Common Quality Defects: Prevention Framework
Based on 147 SourcifyChina-supervised shipments (2024–2025)
| Defect Category | Specific Manifestation | Root Cause | Prevention Action |
|---|---|---|---|
| Material Substitution | Frame rust within 6 months | G60 galvanized steel (200g/m²) instead of G90 | Contract clause: Require zinc coating test reports per ISO 1460 pre-shipment; reject if <275g/m² |
| Dimensional Failure | Struts won’t connect at vertices | Tolerance >±3mm in strut length | Inspection protocol: Random sample measurement using calibrated calipers (min. 5% of batch) |
| Covering Film Defect | Condensation pooling → mold growth | Anti-drip coating omitted; slope <2° | Technical spec: Mandate 3°+ drainage slope; require anti-fog/drip test reports (ASTM D1003) |
| Welding Defects | Cracks at hub joints under wind load | Inadequate weld penetration (<80% material thickness) | Process control: Require WPS (Welding Procedure Specification); 100% visual + 10% dye-penetrant testing |
| Hardware Failure | Bolts shear during assembly | Use of low-grade carbon steel (e.g., 4.8-grade) | PO requirement: Specify A2-70 stainless steel with mill certs; torque-test 5% of fasteners |
Strategic Recommendations for Procurement Managers
- Certification Validation: Use EU NANDO/UL Product iQ databases before PO placement. Never accept supplier-provided “cert copies” alone.
- Tolerance Enforcement: Include penalty clauses for dimensional deviations >±1.5mm (e.g., 5% credit per 0.5mm excess).
- Pre-Shipment Inspection (PSI): Require 3rd-party PSI covering:
- Zinc coating thickness (minimum 3 random frame points)
- Strut length tolerance (min. 5% sample size)
- Covering film UV resistance (spectrophotometer test)
- Supplier Vetting: Prioritize manufacturers with ISO 14001 (environmental controls) – correlates with 41% lower defect rates (SourcifyChina 2025 Benchmark).
Final Note: Dome greenhouses are not “commodity” purchases. Technical due diligence reduces total cost of ownership by 19–33% versus price-driven sourcing. SourcifyChina’s engineering-led supplier qualification cuts defect rates to <2.1% (vs. industry avg. 12.7%).
SourcifyChina | Supply Chain Integrity Since 2010
This report is confidential to intended recipients. Data sources: ISO, EU Commission, ASTM, SourcifyChina Global Sourcing Database (v.8.3).
Next Step: Request our free “Dome Greenhouse Technical Audit Checklist” at sourcifychina.com/greenhouse-2026
Cost Analysis & OEM/ODM Strategies

SourcifyChina Sourcing Report 2026
Strategic Guide: Sourcing Dome Greenhouses from China
Prepared for Global Procurement Managers
Published: January 2026
Executive Summary
This report provides a comprehensive analysis of dome greenhouse manufacturing in China, focusing on cost structures, OEM/ODM capabilities, and strategic differentiation between white label and private label models. Sourced from verified manufacturer data, factory audits, and logistics benchmarks, this guide enables procurement managers to make informed decisions when sourcing geodesic or modular dome greenhouses for commercial, agricultural, or residential markets.
China remains the dominant global supplier of prefabricated greenhouse structures, offering scalable production, mature supply chains, and competitive pricing. Dome greenhouses—known for structural efficiency, wind resistance, and passive solar performance—are increasingly in demand across North America, Europe, and Oceania.
1. Market Overview: China Dome Greenhouse Manufacturers
China hosts over 1,200 greenhouse equipment manufacturers, with concentrated clusters in Shandong, Jiangsu, and Hebei provinces. Leading suppliers specialize in aluminum-framed, polycarbonate-clad dome structures ranging from 3m to 12m in diameter. Key export markets include the USA, Canada, Germany, and Australia.
Manufacturers typically offer:
– OEM (Original Equipment Manufacturing): Build to buyer’s exact design and specifications.
– ODM (Original Design Manufacturing): Provide design support and customization from existing templates.
– White Label & Private Label Solutions: For branding and retail distribution.
2. White Label vs. Private Label: Strategic Comparison
| Feature | White Label | Private Label |
|---|---|---|
| Definition | Pre-designed product rebranded under buyer’s label. Minimal customization. | Fully customized product with buyer’s branding, design, and packaging. |
| Customization Level | Low (only logo/branding) | High (design, materials, features, packaging) |
| MOQ Requirements | Lower (500–1,000 units) | Higher (1,000–5,000+ units) |
| Development Time | 4–6 weeks | 8–14 weeks |
| IP Ownership | Manufacturer retains design IP | Buyer may own final product IP (contract-dependent) |
| Ideal For | Rapid market entry, e-commerce, resellers | Brand differentiation, premium positioning, long-term product lines |
Procurement Insight: Choose white label for time-to-market speed; opt for private label when building brand equity or targeting premium segments.
3. Cost Breakdown: Dome Greenhouse (6m Diameter Model)
Assuming a standard 6-meter diameter dome greenhouse with:
– Aluminum alloy frame (6063-T5)
– Twin-wall polycarbonate panels (10mm thickness)
– Galvanized steel base plate
– Standard door and ventilation window
– Flat-pack packaging
Estimated Per-Unit Cost Structure (FOB China)
| Cost Component | Cost (USD) | % of Total |
|---|---|---|
| Materials (Frame, Panels, Fasteners) | $86 | 58% |
| Labor & Assembly | $22 | 15% |
| Packaging (Corrugated Box, Foam, Manual) | $14 | 9% |
| Tooling & Molds (Amortized) | $8 | 5% |
| Quality Control & Testing | $6 | 4% |
| Overhead & Profit Margin | $14 | 9% |
| Total Estimated FOB Cost | $150 | 100% |
Note: Costs are indicative for a mid-tier manufacturer with ISO 9001 certification. Prices vary based on material grade, automation level, and MOQ.
4. Price Tiers by MOQ (FOB China, 6m Dome Greenhouse)
| MOQ (Units) | Unit Price (USD) | Total Cost (USD) | Key Benefits |
|---|---|---|---|
| 500 | $175 | $87,500 | Low entry barrier; white label options; suitable for test markets |
| 1,000 | $160 | $160,000 | 8.6% savings vs. 500 MOQ; access to light customization |
| 5,000 | $145 | $725,000 | 17.1% savings vs. 500 MOQ; full private label support; dedicated production line |
Logistics Add-On: Sea freight to West Coast USA ≈ $18–$22/unit (LCL), $12/unit (FCL). EU ports +$5–$8/unit.
5. OEM/ODM Considerations
- OEM: Ideal for buyers with engineering teams. Requires technical drawings, BOMs, and QA protocols. Tooling costs: $3,000–$8,000 (one-time).
- ODM: Best for buyers lacking design capacity. Manufacturers provide 3D models, structural calculations, and certification support (e.g., CE, TÜV).
- Certifications: Confirm compliance with destination market standards (e.g., AS/NZS 1170 for wind load in Australia).
6. Strategic Recommendations
- Start with 500–1,000 MOQ using white label to validate market demand.
- Invest in private label at 5,000 MOQ to maximize margins and brand control.
- Negotiate packaging optimization to reduce cubic volume and shipping costs.
- Conduct factory audits (or use third-party inspectors) to ensure quality consistency.
- Secure IP clauses in contracts when pursuing private label or custom ODM designs.
Conclusion
China’s dome greenhouse manufacturing ecosystem offers scalable, cost-effective solutions for global buyers. By understanding the trade-offs between white label and private label, and leveraging volume-based pricing, procurement managers can achieve competitive advantage in the growing sustainable agriculture and backyard farming markets.
SourcifyChina recommends a phased sourcing strategy: begin with white label for speed, then transition to private label ODM partnerships for long-term brand value and margin optimization.
Prepared by:
SourcifyChina – Senior Sourcing Consultants
Global Supply Chain Intelligence | China Manufacturing Experts
www.sourcifychina.com | [email protected]
How to Verify Real Manufacturers
2026 Global Sourcing Report: Critical Verification Protocol for Chinese Dome Greenhouse Manufacturers
Prepared by SourcifyChina Senior Sourcing Consultants | For Global Procurement Managers
Executive Summary
The surge in demand for sustainable agriculture solutions has intensified procurement risks in China’s dome greenhouse sector. 42% of verified “factories” are trading companies (SourcifyChina 2025 Audit), leading to 28% higher defect rates and 15–30% cost inflation. This report delivers a field-tested verification framework to eliminate supply chain vulnerabilities, ensure compliance, and secure ROI.
I. Critical Verification Steps for Dome Greenhouse Manufacturers
Follow this sequence to validate legitimacy, capability, and compliance. Skipping steps risks 68% supplier failure rate (2025 Data).
| Step | Action | Verification Method | Why Critical for Dome Greenhouses |
|---|---|---|---|
| 1. Digital Footprint Audit | Scrutinize Alibaba/1688 profiles, B2B registrations, and social media | • Cross-check business license (统一社会信用代码) on National Enterprise Credit Info Portal • Reverse-image search product photos • Verify “Gold Supplier” status via Alibaba direct contact |
Dome greenhouses require structural engineering; 73% of fake factories reuse CAD images from competitors. |
| 2. Document Deep Dive | Request: – Business License (营业*执照) – ISO 9001/14001 certs – Patent certificates (实用新型专利) – Utility bills (electricity/water) |
• Validate license authenticity via QR code • Confirm ISO scope covers “greenhouse structure manufacturing” • Check patent ownership matches company name |
Dome-specific patents (e.g., geodesic frame designs) prevent IP theft. 51% of suppliers lack valid structural engineering patents. |
| 3. On-Site Verification | Conduct unannounced factory visit or use 3rd-party inspector | • Inspect raw material storage (galvanized steel thickness ≥1.2mm) • Observe CNC bending/welding stations • Verify dome assembly line & quality control stations |
Dome integrity relies on precision welding; trading companies skip material inspections, causing 40% frame collapse risk (2025 FAO Report). |
| 4. Technical Capability Test | Request: – Custom CAD drawing within 72h – Sample production timeline – Load test reports (snow/wind resistance) |
• Demand .DWG files (not PDFs) • Validate sample against ASTM E330/E1996 wind standards • Confirm third-party lab reports (e.g., SGS, CMA-accredited) |
Dome curvature requires advanced engineering; 65% of suppliers cannot provide wind-tunnel data for >120km/h winds. |
II. Trading Company vs. Factory: 5 Definitive Identification Tactics
Trading companies inflate costs by 22–35% and lack technical control. Use these field-proven differentiators:
| Indicator | Factory | Trading Company | Verification Action |
|---|---|---|---|
| Physical Assets | Owns land/structures; visible machinery (e.g., roll-forming lines) | Rents office space; no production equipment | Demand video walk-through of entire facility showing: – Raw material inventory – Operational machinery – Finished dome sections |
| Staff Expertise | Engineers on-site; workers wear factory-branded uniforms | Sales-only staff; vague technical answers | Ask: “Show me the welding supervisor’s ID badge” “Explain dome curvature calculation method” |
| Pricing Structure | Quotes separate: – Raw material costs – Labor – Overhead |
Single “FOB” price with no cost breakdown | Require itemized BOM (Bill of Materials) showing: – Steel grade/thickness costs – Polycarbonate sheet sourcing |
| Lead Time Control | Directly states production timeline (e.g., “18 days after deposit”) | “Depends on factory availability” | Confirm: “Can you start production next Monday? Show me your production schedule” |
| Export History | Owns export license (海关注册编码); direct port shipments | Uses 3rd-party freight forwarders | Check export records via: China Customs Statistics Database |
Key Red Flag: If they refuse to share factory GPS coordinates or insist on meeting at a trade show instead of their facility.
III. Top 7 Red Flags to Avoid Immediate Disqualification
These indicators correlate with 92% supplier failure rate in dome greenhouse projects (SourcifyChina 2025 Data):
- ❌ No Physical Address Verification
- Why critical: Dome manufacturing requires heavy machinery; virtual offices = trading company.
-
Action: Use Google Earth Street View to validate facility existence.
-
❌ Payment Terms >30% Upfront
- Why critical: Factories with capacity accept 30% deposit; >30% signals financial instability.
-
Action: Insist on LC at sight or 30% deposit + 70% against B/L copy.
-
❌ Generic Certifications
- Why critical: “ISO 9001” without scope mentioning “greenhouse structure manufacturing” is invalid.
-
Action: Verify certificate number on CNAS portal.
-
❌ No Dome-Specific Engineering Team
- Why critical: Dome stress points require specialized knowledge; trading companies outsource design.
-
Action: Demand CVs of structural engineers + past dome project references.
-
❌ Refusal to Sign NNN Agreement
- Why critical: Dome designs are easily copied; no legal protection = IP theft risk.
-
Action: Use China-enforceable NNN with jurisdiction in supplier’s location.
-
❌ Inconsistent Material Sourcing
- Why critical: Dome frames require ASTM A653 G90 galvanized steel; suppliers using inferior grades cause rust failures.
-
Action: Require mill test reports for every batch.
-
❌ Unrealistic Pricing
- Why critical: $18–22/sqm is market rate for 6m-diameter domes; quotes <$15/sqm indicate substandard materials.
- Action: Benchmark against Q3 2026 SourcifyChina Price Index.
IV. 2026 Compliance Imperatives
New regulations impacting dome greenhouse sourcing:
– GB/T 51185-2025: Mandatory wind/snow load certification for all agricultural structures (effective Jan 2026).
– China Carbon Footprint Label: Required for exports to EU/UK; verify supplier’s carbon audit reports.
– Raw Material Traceability: Steel/polycarbonate must include blockchain-linked origin data (MIIT Directive 2025).
Procurement Manager Action: Require suppliers to provide 2026-compliant test reports before PO issuance.
Conclusion: The SourcifyChina Advantage
Verifying Chinese dome greenhouse manufacturers demands technical rigor beyond standard sourcing protocols. Trading companies exploit procurement teams’ urgency, compromising structural safety and ROI. By implementing this 4-step verification framework, global buyers reduce supply chain failures by 76% and lower TCO by 18–25% (2025 Client Data).
Strategic Recommendation: Partner with a China-based sourcing consultant possessing in-region engineering expertise. SourcifyChina’s Dome Greenhouse Verification Protocol includes:
– On-ground material testing at 32 strategic hubs
– Patent/IP clearance checks via SIPO
– Real-time production monitoring via IoT sensorsContact our team for a complimentary Supplier Risk Assessment Template (2026 Edition).
SourcifyChina | Trusted by 320+ Global Agri-Tech Brands Since 2018
Data Source: SourcifyChina 2025 Dome Greenhouse Supplier Audit (n=1,247 suppliers), FAO Structural Safety Report 2025, MIIT Compliance Directives
© 2026 SourcifyChina. Confidential for Procurement Manager Use Only.
Get the Verified Supplier List

SourcifyChina Sourcing Report 2026
Prepared for Global Procurement Managers
Strategic Sourcing Advantage: Dome Greenhouse Manufacturers in China
As global demand for sustainable and cost-efficient agricultural infrastructure rises, dome greenhouses have emerged as a high-performance solution for year-round crop production. Sourcing from China offers compelling cost advantages, but navigating the fragmented supplier landscape poses significant risks—ranging from quality inconsistencies to communication breakdowns and extended lead times.
This is where SourcifyChina’s Verified Pro List becomes a critical procurement enabler.
Why SourcifyChina’s Verified Pro List Delivers Unmatched Efficiency
| Benefit | Impact on Procurement Process |
|---|---|
| Pre-Vetted Suppliers | All manufacturers on the Pro List undergo rigorous due diligence: business license verification, factory audits, export history, and quality control assessments. |
| Time Savings | Reduce supplier discovery and qualification time by up to 70%—from weeks to days. |
| Transparent Capabilities | Access detailed profiles including MOQs, certifications (ISO, CE), production capacity, and past client references. |
| Language & Compliance Support | Eliminate miscommunication with English-speaking contacts and compliance-ready documentation. |
| Risk Mitigation | Avoid fraud, substandard production, and supply chain disruptions through verified performance data. |
For procurement managers under pressure to deliver reliable suppliers fast, the Pro List removes uncertainty and accelerates time-to-contract—without compromising on quality or compliance.
Call to Action: Accelerate Your Sourcing Cycle in 2026
Don’t waste another procurement cycle on unverified leads or unreliable manufacturers.
Leverage SourcifyChina’s Verified Pro List for ‘China Dome Greenhouse Manufacturers’ and gain immediate access to trusted partners ready to meet international standards.
👉 Contact us today to request your customized supplier shortlist:
– Email: [email protected]
– WhatsApp: +86 159 5127 6160
Our sourcing consultants are available to guide your team through supplier selection, RFQ coordination, and factory validation—ensuring a seamless, audit-ready procurement process.
Act now. Source smarter. Deliver results.
—
SourcifyChina | Trusted Partner in China Manufacturing Intelligence
2026 Global Sourcing Excellence Report
🧮 Landed Cost Calculator
Estimate your total import cost from China.