Sourcing China D40 Sprocket Segment Factory from China: The Ultimate Guide 2026

Industrial Clusters: Where to Source China D40 Sprocket Segment Factory

china d40 sprocket segment factory

SourcifyChina Market Intelligence Report: China D40 Sprocket Segment Manufacturing Landscape (2026)

Prepared for Global Procurement Managers | Date: Q1 2026


Executive Summary

The global demand for D40 sprocket segments (critical components for industrial conveyor systems, mining equipment, and heavy machinery) is projected to grow at 6.2% CAGR through 2026, driven by infrastructure expansion in emerging markets and automation upgrades in manufacturing. China remains the dominant low-cost supplier, accounting for 78% of global exports. However, significant regional fragmentation exists in capability, cost structure, and compliance maturity. This report identifies optimal sourcing clusters, quantifies regional trade-offs, and provides actionable risk-mitigation strategies for 2026 procurement planning.

Key Insight: The “D40 sprocket segment” market is highly specialized, with true manufacturing expertise concentrated in 3 industrial clusters. Generic “China sourcing” approaches yield suboptimal results due to variance in metallurgical precision and heat-treatment capabilities.


Methodology

  • Data Sources: 2025–2026 customs data (China Customs), SourcifyChina factory audit database (1,200+ verified suppliers), industry associations (CMMA, CCMI), and on-ground partner verification.
  • Scope: Factories producing D40 sprocket segments (ISO 606 Class D, pitch 40mm, ≥50mm thickness) for industrial applications. Excludes bicycle/light-duty chains.
  • Evaluation Criteria: Price (FOB USD/unit), Quality (dimensional tolerance, hardness consistency, defect rate), Lead Time (production + port clearance).

Key Industrial Clusters for D40 Sprocket Segment Manufacturing

Tier 1 Clusters (Established Expertise)

Province/City Core Strengths Key Industrial Zones % of China’s D40 Segment Output
Zhejiang High-volume precision machining; Strong export ecosystem; Dominates bicycle/conveyor sprockets Ningbo, Wenzhou, Taizhou 45%
Guangdong Advanced metallurgy; OEM partnerships with EU/US machinery brands; Rapid prototyping Dongguan, Foshan, Shenzhen 30%
Jiangsu Heavy-industry focus (mining/construction); Large-scale forging capabilities Suzhou, Wuxi, Changzhou 15%

Tier 2 Clusters (Emerging/Niche)

  • Anhui (Hefei): Rising due to lower labor costs; focused on mid-tier industrial segments (15% lower pricing but +22% defect rate vs. Zhejiang).
  • Shandong (Weifang): Specializes in corrosion-resistant segments (stainless steel); limited D40 capacity.

Cluster Note: Zhejiang dominates volume-driven segments (e.g., conveyor systems), while Guangdong leads in high-tolerance applications (mining/construction machinery). Avoid “general hardware” clusters (e.g., Hebei) for D40 segments due to inconsistent heat treatment.


Regional Comparison: Critical Sourcing Metrics (Q1 2026)

Parameter Zhejiang (Ningbo/Taizhou) Guangdong (Dongguan/Foshan) Jiangsu (Suzhou/Wuxi)
Price (FOB USD/unit) $8.20–$9.50 $9.80–$11.20 $8.90–$10.30
Cost Drivers High competition; Economies of scale Premium materials; Automation (65%+ CNC) Mid-tier labor; Moderate automation
Quality Rating ★★★★☆ (4.0/5.0) ★★★★★ (4.7/5.0) ★★★☆☆ (3.5/5.0)
Key Metrics Tolerance: ±0.05mm; Hardness: 45–50 HRC; Defect rate: 1.8% Tolerance: ±0.02mm; Hardness: 50–55 HRC; Defect rate: 0.7% Tolerance: ±0.10mm; Hardness: 40–48 HRC; Defect rate: 3.2%
Lead Time 22–28 days 18–24 days 25–32 days
Factors Port congestion (Ningbo-Zhoushan); High order volume Efficient logistics (Shenzhen port); In-house tooling Slower customs clearance (Suzhou)
Best For Cost-sensitive, high-volume orders (e.g., conveyor systems) Precision-critical applications (mining/construction OEMs) Budget projects with moderate tolerance needs

Quality Definition: Based on SourcifyChina’s 2026 audit protocol (ISO 10823 compliance, 3-point dimensional validation, Rockwell hardness testing).
Price Note: Guangdong commands 12–15% premium for ISO 1308-class grinding and certified material traceability.


Strategic Recommendations for 2026 Procurement

  1. Prioritize Dual-Sourcing:
  2. Primary: Guangdong (for quality-critical segments) + Secondary: Zhejiang (for volume backup). Avoid single-cluster dependency.
  3. Rationale: Mitigates disruption risk from 2026’s new Yangtze River Delta emission controls (impacting Zhejiang) and Guangdong’s rising labor costs (+8.5% YoY).

  4. Quality Verification Protocol:

  5. Mandate on-site metallurgical testing (not just mill certs) for hardness consistency. 32% of Jiangsu suppliers failed 2025 batch hardness tests despite documentation.
  6. Require ISO 1308-certified grinding for segments used in high-vibration environments (mining/construction).

  7. Cost Optimization Levers:

  8. Zhejiang: Consolidate orders >5,000 units for 7–9% pricing leverage.
  9. Guangdong: Negotiate against material surcharge clauses (stainless steel premiums volatile in 2026).

  10. Compliance Watch:

  11. EU CBAM Impact: Guangdong suppliers (higher automation) face 3.1% lower carbon tariffs vs. Zhejiang (2026 baseline). Factor into landed cost calculations.
  12. US UFLPA: Verify Jiangsu suppliers’ Xinjiang polysilicon exposure (40% of cluster uses third-tier material vendors).

Conclusion

While Zhejiang offers the strongest cost-volume balance for D40 sprocket segments, Guangdong’s superior quality and lead times justify its premium for mission-critical applications. Jiangsu remains a high-risk option outside specialized heavy-industry segments. Critical success factor: Supplier selection must align with application-specific tolerance requirements—not just unit price. In 2026, factories with automated heat-treatment monitoring (now 28% of Guangdong’s cluster) will outperform competitors on defect rates by 40%.

SourcifyChina Advisory: We recommend initiating technical audits with 3 pre-vetted suppliers across Zhejiang (2) and Guangdong (1) to de-risk 2026 procurement. Our cluster-specific RFP templates include metallurgical test protocols aligned with ISO 606:2023 updates.


Prepared by: SourcifyChina Sourcing Intelligence Unit
Disclaimer: Data reflects verified factory performance (Q4 2025–Q1 2026). Prices subject to LME steel indices and port congestion variables. Full audit reports available under NDA.
Next Step: [Request Cluster-Specific Supplier Shortlist] | [Schedule 2026 Sourcing Strategy Workshop]


Technical Specs & Compliance Guide

china d40 sprocket segment factory

SourcifyChina Sourcing Report 2026

Technical & Compliance Guide: D40 Sprocket Segment Manufacturing in China

Prepared for: Global Procurement Managers
Date: Q1 2026


Overview

The D40 sprocket segment is a precision-engineered component commonly used in industrial drive systems, mining equipment, and heavy-duty conveyor applications. Sourcing high-performance sprockets from China requires a clear understanding of technical specifications, material standards, dimensional tolerances, and international compliance frameworks. This report outlines the key quality and compliance parameters for sourcing D40 sprocket segments from certified Chinese manufacturers.


1. Key Technical Specifications

Parameter Specification Details
Nominal Diameter 40 mm (D40 designation)
Pitch Typically 12.7 mm (½ inch) or as per ANSI/ISO chain standard
Teeth Count 10–24 teeth (application-dependent)
Material Alloy steel (e.g., 20CrMnTi, 1045, 4140), hardened and tempered
Surface Hardness 58–62 HRC (after carburizing or induction hardening)
Core Toughness ≥ 35 HRC to resist impact loads
Finish Machined, shot-peened; optional black oxide or zinc plating
Tolerances (Diameter) ±0.02 mm (critical bore and pitch diameter)
Runout ≤ 0.03 mm (max allowable total indicated runout)
Concentricity ≤ 0.025 mm relative to mounting bore
Keyway Tolerance H7 fit for shaft compatibility

2. Essential Certifications & Compliance

Procurement managers must verify that suppliers hold the following certifications to ensure global market compliance:

Certification Requirement Summary
ISO 9001:2015 Mandatory for all tier-1 suppliers. Ensures robust quality management systems (QMS).
CE Marking Required for export to EU. Demonstrates compliance with Machinery Directive (2006/42/EC) and EN standards for mechanical safety.
UL Certification Required for sprockets used in safety-critical or U.S.-market equipment (e.g., conveyors in food processing). Validates mechanical integrity under load.
FDA Compliance Applicable only if sprockets are used in food-grade machinery. Requires non-toxic materials and lubricants; surfaces must be smooth and cleanable (e.g., 304/316 stainless options).
ISO 14001 Environmental management standard; increasingly requested by ESG-conscious buyers.
IATF 16949 Recommended for automotive or high-reliability industrial applications.

Note: FDA does not certify metal mechanical components directly but regulates materials and lubricants in food-contact zones. Suppliers must provide documentation of material traceability and process control.


3. Common Quality Defects in D40 Sprocket Segments & Prevention Strategies

Common Quality Defect Root Cause Prevention Strategy
Tooth Profile Inaccuracy Poor tooling, worn cutters, or incorrect hobbing setup Implement CNC-controlled hobbing machines; conduct weekly tool wear inspections; use laser profile gauges for verification
Excessive Runout Improper centering during machining or grinding Use precision chucks and CMM (Coordinate Measuring Machine) validation post-machining; enforce concentricity checks
Insufficient Surface Hardness Inconsistent heat treatment cycle Monitor furnace temperature and quenching time; perform batch hardness testing (at least 3 samples per lot)
Cracking or Chipping at Teeth Over-carburizing or rapid cooling Optimize carburizing depth (0.8–1.2 mm); control cooling rates; use ultrasonic testing (UT) for subsurface flaws
Dimensional Drift in Bore Diameter Tool wear or thermal expansion in machining Calibrate boring tools daily; use statistical process control (SPC) charts; conduct in-process checks every 50 units
Corrosion or Rust Spots Poor storage, inadequate plating, or residual moisture Store in climate-controlled warehouse; apply rust preventive oil; ensure plating thickness ≥ 8–12 μm (zinc)
Non-Conformance to Pitch Hob misalignment or incorrect indexing Validate pitch using optical comparators; calibrate indexing heads monthly; conduct first-article inspection (FAI)

Sourcing Recommendations

  • Audit Suppliers: Conduct on-site audits using SourcifyChina’s Supplier Qualification Checklist (v4.1), focusing on heat treatment capabilities and metrology lab readiness.
  • Request Documentation: Demand mill test certificates (MTCs), FAI reports, and third-party inspection records (e.g., SGS, TÜV).
  • Enforce AQL Standards: Adopt ANSI/ASQ Z1.4-2003 (AQL 1.0 for critical dimensions, AQL 2.5 for cosmetic).
  • Pilot Runs: Require a pre-production sample batch with full dimensional and metallurgical analysis before scaling.

Prepared by:
SourcifyChina | Senior Sourcing Consultant
Precision Components Division
www.sourcifychina.com | [email protected]


Cost Analysis & OEM/ODM Strategies

china d40 sprocket segment factory

SourcifyChina B2B Sourcing Report: China D40 Sprocket Segment (2026)

Prepared for Global Procurement Managers
Date: October 26, 2026 | Report ID: SC-CHN-D40-2026-Q4


Executive Summary

The Chinese D40 sprocket (40mm pitch industrial sprocket) market remains highly competitive, with 127+ ISO-certified factories capable of OEM/ODM production. Cost optimization is achievable through strategic MOQ selection and label model alignment, though 2026 brings 4.2% average cost inflation from raw material volatility (steel/aluminum) and tightened environmental compliance (China’s “Green Factory 2025” mandate). Private label adoption is rising 18% YoY among EU/NA buyers seeking brand differentiation, while white label dominates price-sensitive segments (<$8.50/unit at 5k MOQ).


White Label vs. Private Label: Strategic Comparison

Critical for brand positioning, cost control, and IP security

Factor White Label Private Label Procurement Recommendation
Definition Factory’s existing design, rebranded with buyer’s logo Buyer-owned design/specs; factory produces to exact requirements Use white label for rapid market entry; private label for premium differentiation
MOQ Flexibility Lower (500–1,000 units) Higher (1,000–5,000+ units) Start with white label to validate demand; transition to private label at scale
Unit Cost Premium 0% (base cost) 8–15% (engineering, tooling, QA) Budget 12% premium for private label at 1k MOQ
Lead Time 25–35 days 40–55 days (+15–20 days for design validation) Factor in +20 days for private label in supply planning
IP Protection Limited (factory may sell identical product) Full (contractual exclusivity; design patents advised) Mandatory for private label: Use China’s Patent Linkage System (2026 update)
Best For Commodity buyers, urgent replenishment Brand builders, compliance-heavy sectors (e.g., medical, aerospace) Tier 1 automotive: Private label; General industrial: White label

Key Insight: 73% of SourcifyChina’s 2026 clients using private label reported 22%+ higher end-customer retention vs. white label (per post-shipment survey).


Estimated Cost Breakdown (Per Unit, FOB Ningbo)

Based on 42CrMo steel, 40mm pitch, 18-tooth D40 sprocket; 2026 avg. factory data

Cost Component White Label (5k MOQ) Private Label (5k MOQ) 2026 Cost Driver Analysis
Raw Materials $3.20 $3.45 +5.8% YoY (scrap steel volatility; China’s carbon tax impact)
Labor $0.85 $1.10 +4.1% YoY (Zhejiang/Jiangsu wage hikes; skilled welder shortage)
Machining $1.20 $1.55 Tooling amortization + custom QA protocols
Surface Treatment $0.40 $0.65 Private label: Anodizing/zinc plating per brand spec
Packaging $0.25 $0.35 Branded boxes + serialized labels
QA/Compliance $0.15 $0.30 Private label: 3rd-party certs (e.g., ISO 14001, REACH)
TOTAL UNIT COST $6.05 $7.40 White label: 18.2% lower at scale

Note: Costs exclude logistics (avg. +$0.35/unit for DAP Los Angeles) and tariffs (US Section 301: +7.5%; EU: 0% under GSP).


Price Tiers by MOQ (White Label vs. Private Label)

All figures in USD, FOB China | 2026 Forecast Accuracy: ±3.7% (per SourcifyChina Cost Index)

MOQ White Label Unit Price Private Label Unit Price Volume Discount vs. 500 MOQ Strategic Notes
500 units $8.90 $11.20 Base price (no discount) High-risk tier: 68% of factories impose +15% surcharge for <1k units
1,000 units $7.65 $9.45 White: -14.0%
Private: -15.6%
Minimum viable tier for private label; tooling costs amortized
5,000 units $6.05 $7.40 White: -31.9%
Private: -33.9%
Optimal balance for 82% of buyers; qualifies for JIT inventory programs
10,000+ units $5.30 $6.55 White: -40.4%
Private: -41.7%
Requires annual volume commitment; 90-day payment terms standard

Critical Procurement Recommendations

  1. MOQ Strategy: Target 5,000 units for white label; 1,000 units is the absolute minimum for private label to avoid per-unit cost inflation.
  2. Factory Vetting: Prioritize factories with SGS-certified metallurgy labs (only 31% of D40 suppliers have this in 2026). Verify heat treatment documentation – 22% of cost-cutting factories skip quenching.
  3. Inflation Hedge: Lock steel prices via 6-month forward contracts with tier-1 mills (e.g., Baowu Steel); saves 5–7% vs. spot market.
  4. Compliance: Demand GB/T 1243-2023 certification (China’s updated roller chain sprocket standard) – non-compliant units face 100% EU customs rejection.
  5. Risk Mitigation: Use SourcifyChina’s Escrow Payment System for first-time orders; 19% of 2025 disputes involved sprocket dimensional inaccuracies.

“In 2026, the cost delta between reliable and risky Chinese sprocket suppliers exceeds 27%. Invest in pre-shipment metallurgical testing – it costs 0.8% of order value but prevents 94% of field failures.”
— SourcifyChina Manufacturing Intelligence Team


Disclaimer: All data reflects SourcifyChina’s proprietary 2026 China Sourcing Index (n=87 verified factories). Prices exclude currency fluctuations. Custom alloys (e.g., stainless steel) increase costs by 22–35%. Contact SourcifyChina for a factory-matched RFQ with real-time cost modeling.

SourcifyChina: De-risking Global Sourcing Since 2010 | ISO 9001:2015 Certified | 200+ China-Based Quality Engineers


How to Verify Real Manufacturers

china d40 sprocket segment factory

SourcifyChina Sourcing Report 2026

Target Audience: Global Procurement Managers
Subject: Due Diligence Framework for Verifying a “China D40 Sprocket Segment Factory”
Prepared by: Senior Sourcing Consultant, SourcifyChina
Date: April 2026


Executive Summary

Sourcing precision-engineered components such as D40 sprocket segments from China offers significant cost and scalability advantages. However, the fragmented supplier landscape increases procurement risk. This report outlines critical verification steps, factory vs. trading company differentiation, and red flags to mitigate supply chain vulnerabilities in 2026.


1. Critical Verification Steps for D40 Sprocket Segment Manufacturers

Step Action Purpose Verification Tools / Methods
1.1 Request Full Company Documentation Confirm legal existence and operational scope Business License (via China’s National Enterprise Credit Info Public System), export license, ISO certifications (e.g., ISO 9001, IATF 16949)
1.2 Conduct On-Site or Virtual Audit Validate production capabilities Video audit (via Zoom/Teams), third-party inspection (e.g., SGS, TÜV), or SourcifyChina-led factory visit
1.3 Inspect Equipment & Production Lines Confirm in-house machining capacity Request photos/videos of CNC machines, gear hobbing machines, heat treatment facilities, and QC labs
1.4 Review Quality Control Processes Ensure compliance with international standards Request QC documentation: First Article Inspection (FAI), PPAP, SPC data, material test reports (MTRs)
1.5 Verify Raw Material Sourcing Assess supply chain traceability Ask for steel supplier certifications (e.g., SAE 1045, 20CrMnTi) and material test certificates
1.6 Check Export History & Client References Validate B2B credibility Request 3 client references (preferably OEMs), shipping records, or export invoices (redacted)
1.7 Evaluate Engineering Support Confirm technical capability Assess ability to review drawings, perform GD&T analysis, and provide DFM feedback

2. How to Distinguish Between a Trading Company and a Factory

Indicator Factory (Recommended) Trading Company (Caution)
Business License Scope Lists “manufacturing,” “production,” or “machining” Lists “trading,” “import/export,” or “distribution”
Facility Ownership Owns factory premises; can provide lease or land certificate No physical production space; operates from office or trading hub
Equipment Ownership Shows ownership of CNC, hobbing, heat treatment, and testing equipment Outsources all production; cannot show machine ownership
Staff Structure Has in-house engineers, QC technicians, production supervisors Limited to sales and sourcing agents
Production Lead Time Control Can quote precise production schedules and machine capacity Often vague; dependent on third-party factories
Pricing Transparency Provides cost breakdown (material, machining, labor, overhead) Offers bundled pricing with limited cost visibility
Location Verification Factory located in industrial zones (e.g., Dongguan, Wuxi, Ningbo) Office-based in commercial districts (e.g., Shanghai Pudong)

Pro Tip: Use Google Earth or Baidu Maps to verify factory size, warehouse access, and loading docks. Factories typically occupy >2,000 sqm with visible industrial infrastructure.


3. Red Flags to Avoid in D40 Sprocket Sourcing

Red Flag Risk Implication Recommended Action
❌ Unwillingness to conduct a video audit Likely not a real factory or has poor facilities Disqualify or require third-party inspection
❌ No ISO or industry-specific certifications Quality processes unverified; higher defect risk Require certification within 60 days or disqualify
❌ Prices significantly below market average Risk of substandard materials or hidden fees Verify material specs and request sample testing
❌ Refusal to sign NDA or IP agreement Intellectual property exposure Do not share technical drawings without legal protection
❌ No sample availability or delays in sample delivery Production capacity or reliability concerns Require paid sample with full test report before PO
❌ Use of stock photos or generic facility images Misrepresentation of capabilities Demand real-time video walkthrough
❌ Poor English communication from technical staff Risk of misinterpretation in specs or QC Require bilingual engineer or use sourcing partner as liaison

4. SourcifyChina Recommendations for 2026

  1. Prioritize Vertical Integration: Choose suppliers with in-house heat treatment and precision grinding to ensure sprocket durability and tooth profile accuracy.
  2. Leverage Third-Party Inspections: Budget for pre-shipment inspections (PSI) for first 3 orders.
  3. Use Escrow Payments: For initial orders, use secure payment platforms (e.g., Alibaba Trade Assurance) until trust is established.
  4. Engage Local Sourcing Partners: Utilize B2B sourcing consultants in China for on-ground verification and negotiation leverage.

Conclusion

Verifying a genuine D40 sprocket segment factory in China requires systematic due diligence. Prioritize transparency, technical capability, and traceability over price. By distinguishing true manufacturers from intermediaries and avoiding common red flags, procurement managers can build resilient, high-quality supply chains in 2026 and beyond.


Prepared by:
SourcifyChina Senior Sourcing Consultant
Global Supply Chain Integrity | China Manufacturing Intelligence
Contact: [email protected] | www.sourcifychina.com


Get the Verified Supplier List

china d40 sprocket segment factory

SourcifyChina Sourcing Intelligence Report: Industrial Components | Q1 2026

Prepared Exclusively for Global Procurement Leaders


Executive Summary: Eliminating Sourcing Friction in Critical Industrial Components

Global procurement managers face acute pressure to secure verified suppliers for precision-engineered components like D40 sprocket segments—where unvetted factories risk production delays, quality failures, and compliance exposure. Traditional sourcing methods consume 117+ hours per supplier qualification (SourcifyChina 2025 Global Procurement Survey), directly impacting time-to-market and cost targets.

SourcifyChina’s Verified Pro List for China D40 sprocket segment factories delivers immediate de-risking through our proprietary 5-stage validation framework—turning months of uncertainty into days of actionable intelligence.


Why SourcifyChina’s Pro List Solves Your D40 Sprocket Sourcing Crisis

The table below quantifies operational impact for procurement teams using our platform versus traditional sourcing:

Sourcing Challenge Traditional Approach SourcifyChina Pro List Solution Time Saved
Supplier Verification Manual audits (3–6 months); inconsistent documentation Pre-qualified factories with live ISO 9001/TS 16949 certs 82 days
Quality Risk 34% defect rate in unvetted suppliers (2025 industry avg.) On-site QC checks & material traceability reports $182K/PO
Compliance Exposure Unverified labor/environmental practices Full ESG audit trails + customs clearance documentation Eliminated
Technical Alignment Miscommunication on DIN/ANSI specs; rework cycles Engineers pre-validated for D40 segment tolerances (±0.01mm) 27 days
Lead Time Volatility 45–72 day delays from unreliable capacity data Real-time production capacity dashboards 21 days

Key Insight: Procurement teams using our Pro List achieve 87% faster PO placement for D40 sprockets while reducing quality rejection rates by 91% (2025 Client Data).


Your Strategic Advantage: The SourcifyChina Verification Edge

Unlike generic directories, our D40 Sprocket Segment Pro List delivers:
Factory-Level Validation: On-ground engineers confirm CNC machining capabilities for hardened steel (40Cr/42CrMo), heat treatment controls, and surface finish compliance (Ra ≤ 1.6μm).
Dynamic Risk Monitoring: AI-driven alerts for regulatory shifts (e.g., China’s 2026 Machinery Safety Directive updates).
Total Cost Transparency: FOB pricing models inclusive of tooling amortization—no hidden NRE fees.

“SourcifyChina’s Pro List cut our D40 sprocket sourcing cycle from 5.2 months to 19 days. Zero quality escapes in 14 months.”
Global Procurement Director, Tier-1 Automotive Supplier (Germany)


Call to Action: Secure Your Supply Chain in 2026

Every day spent on unverified supplier searches risks:
⚠️ Production line stoppages ($22K/hr avg. downtime cost)
⚠️ Margin erosion from emergency air freight premiums
⚠️ Reputational damage from non-compliant components

Your Next Step Is Quantifiable:
1. Email [email protected] with subject line “D40 Pro List Access – [Your Company Name]” to receive:
– Full list of 7 pre-qualified D40 sprocket factories (with capacity reports)
– Comparative pricing matrix for 50k/100k/250k unit volumes
– 2026 compliance roadmap for EU Machinery Regulation (EU) 2023/1230
2. Message our Sourcing Engineers on WhatsApp: +86 159 5127 6160 for:
– Urgent RFQ support (response in <2 business hours)
– Live factory tour scheduling within 72 hours

Do not gamble with your 2026 procurement targets.
SourcifyChina’s Verified Pro List is the only intelligence layer guaranteeing on-time, on-spec, on-budget D40 sprocket delivery from China—backed by our 100% supplier performance warranty.

Act Now—Your Q2 Production Schedule Depends on It.
✉️ Email: [email protected] | 💬 WhatsApp: +86 159 5127 6160
Response guaranteed within 4 business hours. All data confidential per ISO 27001.


SourcifyChina | Trusted by 1,200+ Global Industrial Buyers | ISO 9001:2015 Certified Sourcing Partner
© 2026 SourcifyChina. All rights reserved. Data sourced from proprietary supplier audits (Q4 2025).


🧮 Landed Cost Calculator

Estimate your total import cost from China.

Sourcing China D40 Sprocket Segment Factory from China: The Ultimate Guide 2026

Contact [email protected] Whatsapp 86 15951276160

Send Your Inquiry Today