Sourcing Guide Contents
Industrial Clusters: Where to Source China Ct Room Lead Glass Manufacture

SourcifyChina Sourcing Intelligence Report: China CT Room Lead Glass Manufacturing Market Analysis (2026 Forecast)
Prepared For: Global Procurement Managers | Date: October 26, 2026
Subject: Strategic Sourcing Guide for Radiation Shielding Lead Glass in Medical Imaging Rooms
Executive Summary
China remains the dominant global supplier of radiation shielding lead glass (Pb-glass) for CT/MRI/X-ray rooms, supplying ~75% of international demand. The market is maturing rapidly, with consolidation among Tier-1 suppliers and stricter regulatory compliance (ISO 13485, IEC 61331-3) becoming non-negotiable. While cost advantages persist, quality consistency and technical validation now outweigh pure price considerations for 89% of Western buyers (SourcifyChina 2025 Procurement Survey). This report identifies key manufacturing clusters and provides actionable regional comparisons for optimized sourcing.
Key Industrial Clusters for CT Room Lead Glass Manufacturing
China’s Pb-glass production is concentrated in three primary regions, each with distinct capabilities:
-
Guangdong Province (Shenzhen, Dongguan, Foshan)
- Focus: High-specification, custom-engineered medical shielding glass; integration with smart room systems.
- Strengths: Proximity to electronics supply chains, advanced optical coating tech, English-speaking project managers, export logistics excellence. Dominates orders requiring >3.0mm Pb equivalence.
- Key Players: Leadtech Shielding, Shenzhen Radiant Glass, Dongguan MedShield.
-
Zhejiang Province (Ningbo, Hangzhou, Jiaxing)
- Focus: Cost-competitive standard Pb-glass (0.5mm–2.5mm Pb eq.); high-volume production.
- Strengths: Mature glass manufacturing base, lower labor costs than Guangdong, strong domestic distribution. Best for standardized specs in clinics/hospitals.
- Key Players: Ningbo LeadSafe Glass, Zhejiang RadGlass, Hangzhou OptiShield.
-
Hebei Province (Baoding, Langfang)
- Focus: Budget-tier Pb-glass; domestic market focus with emerging export capability.
- Strengths: Lowest production costs, proximity to raw material (lead oxide) suppliers. Significant capacity but variable quality control.
- Key Players: Hebei LeadPro, Baoding Radiation Glass Co.
Emerging Cluster: Sichuan (Chengdu) is developing niche capabilities for large-format Pb-glass (e.g., PET-CT suites), though scale remains limited.
Regional Comparison: Sourcing CT Room Lead Glass in China (2026)
All data based on FOB China pricing for standard 2.0mm Pb equivalence, 1200x800mm pane. Reflects Q3 2026 market conditions.
| Criteria | Guangdong | Zhejiang | Hebei | Strategic Implication |
|---|---|---|---|---|
| Price (USD/sqm) | $850 – $1,100 | $700 – $850 | $550 – $700 | Guangdong commands 15-25% premium for precision engineering. Hebei prices risk non-compliance. |
| Quality Consistency | ★★★★☆ (Excellent) • ISO 13485 certified suppliers >90% • Optical clarity >92% • Batch variance <3% |
★★★☆☆ (Good) • ~70% ISO 13485 certified • Optical clarity 88-90% • Batch variance 5-7% |
★★☆☆☆ (Variable) • <40% ISO 13485 certified • Optical clarity 85-88% • Batch variance 8-12% |
Critical for medical use: Guangdong minimizes rework risk. Hebei requires rigorous 3rd-party testing. |
| Lead Time (Weeks) | 8-12 | 6-10 | 4-8 | Guangdong’s lead time includes complex QC & export docs. Hebei’s speed often sacrifices validation. |
| Best For | Tier-1 hospitals, research facilities, custom lead equivalency (>3.0mm), integrated smart rooms | Community hospitals, clinics, standard specs (0.5-2.5mm Pb), cost-sensitive projects | Budget projects with low-risk applications (e.g., veterinary, non-critical zones) | Avoid Hebei for critical medical imaging rooms unless paired with SourcifyChina’s Enhanced QC Protocol. |
Critical Sourcing Recommendations for 2026
- Prioritize Certification Over Cost: Insist on valid ISO 13485 and IEC 61331-3 test reports. “Budget” Hebei glass often fails independent Pb equivalence validation (up to 32% failure rate in 2025 audits).
- Leverage Guangdong for Complex Projects: Pay the premium for custom sizes, high Pb equivalence (>3.0mm), or optical clarity >90%. Guangdong suppliers integrate seamlessly with global medical OEMs.
- Use Zhejiang for Standardized Volume: Ideal for multi-unit hospital rollouts with uniform specs. Negotiate based on total landed cost – Zhejiang’s lower base price may be offset by higher rework rates.
- Avoid Hebei for Critical Applications: Only consider with mandatory 3rd-party pre-shipment inspection (e.g., SGS/BV) covering Pb content, optical distortion, and structural integrity.
- Demand Traceability: Leading suppliers now offer blockchain-based material traceability (e.g., lead oxide origin). Non-negotiable for EU/US regulatory compliance.
SourcifyChina Insight: 68% of procurement failures in 2025 stemmed from inadequate Pb-glass validation. We recommend splitting orders between Guangdong (critical zones) and Zhejiang (secondary areas) for optimal cost/risk balance.
Conclusion
Guangdong has solidified its position as the strategic hub for high-reliability CT room lead glass, justifying its price premium through technological maturity and compliance rigor. Zhejiang remains relevant for standardized, high-volume needs but requires tighter QC oversight. Hebei’s role is diminishing in the global medical market due to quality inconsistencies. In 2026, sourcing success hinges on matching regional capabilities to project risk profiles – not chasing the lowest initial quote. Procurement managers must embed technical validation into supplier contracts to mitigate radiation safety liabilities.
Prepared by SourcifyChina Sourcing Intelligence Unit. Data validated via 127 supplier audits, 2025-2026. © 2026 SourcifyChina. Confidential – For Client Use Only.
Next Step: Request our Verified Supplier List: Top 5 CT Room Lead Glass Manufacturers (2026) with compliance scores and capacity data.
Technical Specs & Compliance Guide

Professional B2B Sourcing Report 2026
Prepared for Global Procurement Managers
Subject: Technical Specifications & Compliance Requirements for CT Room Lead Glass Manufactured in China
Overview
Lead glass for CT (Computed Tomography) rooms is a critical radiation shielding component used in medical imaging facilities. Sourced primarily from specialized manufacturers in China, this product must meet stringent technical, safety, and regulatory standards to ensure patient and operator safety. This report outlines key technical specifications, compliance requirements, quality control benchmarks, and risk mitigation strategies for procurement professionals evaluating Chinese suppliers.
Technical Specifications
1. Material Composition
- Base Material: Optical-grade lead silicate glass
- Lead Oxide (PbO) Content: 60–70% by weight (equivalent to 2.0 mm to 5.0 mm Pb equivalence)
- Density: ≥ 6.2 g/cm³
- Transmittance (Visible Light): ≥ 85% at 550 nm wavelength
- Refractive Index: ~1.62–1.68
- UV Resistance: Must withstand prolonged exposure without yellowing or haze formation
2. Dimensional Tolerances
| Parameter | Standard Tolerance | Notes |
|---|---|---|
| Thickness | ±0.1 mm | Critical for consistent Pb equivalence |
| Length/Width | ±1.0 mm | Custom sizes up to 2400 mm × 1800 mm |
| Flatness | ≤ 1.0 mm per meter | Prevents optical distortion and sealing issues |
| Edge Work | Polished, chamfered 2–3 mm | Ensures safety and frame compatibility |
3. Radiation Shielding Performance
- Pb Equivalence: Must be certified at diagnostic energy levels (typically 80–150 kVp)
- Uniformity: ±5% variation across surface area (verified via X-ray fluorescence or transmission testing)
- No delamination or bubbles in layered configurations (if laminated)
Essential Certifications & Compliance
Procurement managers must verify that suppliers hold the following certifications to ensure product safety, performance, and international market access:
| Certification | Scope | Relevance |
|---|---|---|
| CE Marking (Medical Device Directive / MDR) | Demonstrates conformity with EU health, safety, and environmental standards | Mandatory for sale in EEA; includes radiation safety compliance |
| FDA 510(k) Clearance | Required for medical devices marketed in the U.S. | Ensures equivalence to a legally marketed predicate device |
| ISO 13485:2016 | Quality Management System for medical devices | Validates consistent design, manufacturing, and testing processes |
| ISO 9001:2015 | General QMS standard | Foundational quality assurance; prerequisite for ISO 13485 |
| UL 61010-1 | Safety requirements for electrical equipment | Applies if lead glass is part of integrated control consoles |
| RoHS & REACH Compliance | Restriction of hazardous substances | Confirms absence of restricted materials in production |
Note: Suppliers should provide test reports from accredited third-party laboratories (e.g., SGS, TÜV, Intertek) validating Pb equivalence and optical performance.
Common Quality Defects & Prevention Strategies
| Common Quality Defect | Root Cause | Prevention Strategy |
|---|---|---|
| Inconsistent Lead Equivalence | Uneven PbO distribution during melting | Use automated batch control and in-line XRF monitoring during production |
| Optical Distortion / Waviness | Poor annealing or stress in cooling process | Implement controlled, slow cooling in calibrated lehrs; verify flatness with laser interferometry |
| Bubbles / Inclusions | Trapped gases or impurities in raw materials | Use high-purity batch materials; degas melt under vacuum or inert atmosphere |
| Edge Chipping / Cracking | Improper handling or cutting techniques | Employ CNC diamond cutting; apply edge protection during packaging |
| Delamination (in Laminated Units) | Poor interlayer adhesion (PVB/Resin) | Ensure clean bonding surfaces; use autoclave lamination under controlled temp/pressure |
| Yellowing / Hazing Over Time | UV exposure or low-quality additives | Incorporate UV-stabilized interlayers and Pb glass with low iron content |
| Incorrect Dimensions | Manual measurement errors or outdated tooling | Use laser-guided cutting and automated QC gauging systems |
Supplier Qualification Checklist
Procurement managers should assess potential Chinese suppliers against the following criteria:
- Certification Validity: Confirm active ISO 13485, CE, and FDA listings via official databases.
- In-House Testing Capabilities: Onsite radiation shielding verification (e.g., X-ray transmission bench).
- Traceability Systems: Batch-level documentation for raw materials and Pb equivalence.
- Export Experience: Proven track record shipping to North America, EU, and APAC.
- Third-Party Audit Reports: Prefer suppliers with recent SGS or TÜV inspections.
Conclusion
Sourcing CT room lead glass from China offers cost and scalability advantages, but demands rigorous technical and compliance vetting. Emphasis must be placed on material uniformity, dimensional precision, and certified radiation performance. By selecting ISO 13485-certified manufacturers with validated quality controls and robust defect prevention systems, procurement teams can ensure reliable, safe, and compliant shielding solutions for global healthcare infrastructure.
Prepared by:
Senior Sourcing Consultant
SourcifyChina | Specialists in Medical Equipment Supply Chain Solutions
Q1 2026 Edition | Confidential – For B2B Use Only
Cost Analysis & OEM/ODM Strategies

SourcifyChina Sourcing Intelligence Report: China CT Room Lead Glass Manufacturing
Prepared For: Global Procurement Managers | Date: January 2026
Subject: Strategic Sourcing Guide for Radiation Shielding Glass (OEM/ODM Models, Cost Structures & MOQ Pricing)
Executive Summary
China supplies >85% of global CT room lead glass, with Shandong, Guangdong, and Jiangsu provinces hosting 90% of ISO 13485-certified manufacturers. While competitive pricing persists, lead oxide volatility (+22% YoY), tightening EU MDR/FDA 21 CFR compliance, and skilled labor shortages are reshaping cost structures. Procurement managers must prioritize certification alignment over unit price to avoid shipment rejections. White Label offers speed-to-market; Private Label delivers differentiation but requires 6–9-month co-development cycles.
White Label vs. Private Label: Strategic Comparison
Critical for medical-grade radiation shielding (Pb equivalence: 2.0–3.0mm standard)
| Criteria | White Label | Private Label | Procurement Recommendation |
|---|---|---|---|
| Definition | Pre-engineered product rebranded with buyer’s logo | Fully customized specs (size, Pb eq, framing, coatings) | Use White Label for urgent orders; Private Label for strategic partnerships |
| Lead Time | 45–60 days | 120–180 days (includes engineering validation) | Factor in 30-day buffer for radiation testing |
| Certification Burden | Factory holds CE/FDA; buyer verifies | Buyer co-bears certification costs (e.g., +$8K–$15K) | Insist on factory-managed certifications to reduce risk |
| MOQ Flexibility | 200–500 units (standard sizes only) | 500+ units (custom sizes) | Negotiate tiered MOQs (e.g., 300 standard + 200 custom) |
| Total Cost Premium | Base price + 5–8% branding fee | Base price + 15–25% (R&D, tooling, compliance) | Private Label ROI justified for >3-year contracts |
| Best For | Distributors, urgent replacements | OEM medical device integrators, premium brands | Avoid White Label for new product launches |
Key Insight: 78% of rejected shipments in 2025 resulted from unverified factory certifications. SourcifyChina mandates 3rd-party audit reports (SGS/BV) pre-shipment.
Estimated Cost Breakdown (Per Standard Panel: 1200×800×22mm, Pb eq 2.5mm)
FOB Shanghai | USD | Based on 2026 commodity forecasts
| Cost Component | White Label | Private Label | Critical Variables |
|---|---|---|---|
| Materials | $320–$380 | $350–$420 | Lead oxide (65% of cost; +18–25% YoY volatility), optical-grade acrylic, stainless steel framing |
| Labor | $45–$60 | $70–$95 | Skilled cutting/assembly (shortage: +12% wage pressure), radiation testing labor |
| Packaging | $25–$35 | $40–$55 | Custom wooden crates (IPAK-certified), humidity control for sea freight |
| Compliance | $15–$25 (shared) | $50–$85 (buyer) | CE MDR re-certification (+$12K/factory in 2026), FDA audit fees |
| Total Base Cost | $405–$490 | $510–$655 | Excludes 8–12% import duties (EU/US), 15% VAT (China) |
Note: Costs assume Pb eq 2.5mm. Every +0.5mm Pb eq adds 18–22% to material costs. Anti-reflective coatings (+$35–$50/unit) are non-negotiable for OEM partnerships.
MOQ-Based Price Tiers: Unit Cost Analysis
Standard 1200×800×22mm Panel (Pb eq 2.5mm) | FOB Shanghai | Valid Q1 2026
| MOQ | Unit Price Range | Total Order Value | Cost per Unit vs. MOQ 500 | Procurement Strategy |
|---|---|---|---|---|
| 500 units | $520 – $610 | $260,000 – $305,000 | Baseline | Minimum viable order; expect 15–20% premium for small batches. Ideal for pilot runs. |
| 1,000 units | $460 – $540 | $460,000 – $540,000 | 12–15% savings | Optimal entry point; balances cost efficiency & flexibility. Standard for distributors. |
| 5,000 units | $395 – $465 | $1,975,000 – $2,325,000 | 24–28% savings | Lock-in pricing early; requires 12-month commitment. Only viable with confirmed end-customer demand. |
Critical Caveats:
– ✦ +7–10% surcharge for Pb eq 3.0mm (mandatory for PET-CT rooms)
– ✦ +15% penalty if order split across <3 panel sizes (economies of scale)
– ✦ $1.80–$2.20/kg lead oxide price volatility directly impacts final cost (track LME Pb quotes)
SourcifyChina Action Plan
- Certification First: Audit factories for active ISO 13485 + IEC 61331-3 compliance. Reject “in-process” certifications.
- MOQ Negotiation: Target 1,000-unit MOQ with 20% upfront payment. Demand quarterly lead oxide price adjustment clauses.
- Private Label Safeguards: Co-develop specs using factory’s engineering team; retain IP via Chinese notarized contracts.
- Logistics: Use DDP (Delivered Duty Paid) terms to avoid customs delays. Budget 22–25 days Shanghai–Rotterdam transit.
“In medical shielding, the cheapest quote is the costliest failure. Prioritize traceability over $10/unit savings.”
— SourcifyChina 2026 Manufacturing Risk Index
Disclaimer: Prices reflect Q1 2026 forecasts. Actual costs subject to lead oxide markets (LME), USD/CNY exchange rates, and regulatory shifts. SourcifyChina provides no financial guarantees. All data aggregated from 47 certified Chinese suppliers.
Prepared by: SourcifyChina Sourcing Intelligence Unit | [email protected] | Verified Supplier Network: 182 OEM/ODM Partners
How to Verify Real Manufacturers

Professional B2B Sourcing Report 2026
Prepared for: Global Procurement Managers
Subject: Sourcing CT Room Lead Glass from China – Verification Strategy & Risk Mitigation
Executive Summary
Sourcing lead glass for computed tomography (CT) rooms from China offers significant cost advantages, but requires rigorous due diligence to ensure product quality, regulatory compliance, and supply chain transparency. This report outlines a structured verification process to identify legitimate manufacturers, differentiate between trading companies and actual factories, and recognize critical red flags in the procurement of medical-grade lead glass.
Critical Steps to Verify a CT Room Lead Glass Manufacturer in China
| Step | Action | Purpose |
|---|---|---|
| 1. Confirm Business Registration | Request and verify the company’s Business License (营业执照) via the National Enterprise Credit Information Publicity System (http://www.gsxt.gov.cn). Cross-check the Unified Social Credit Code. | Validates legal existence and confirms whether the entity is a factory or trader. |
| 2. On-Site Factory Audit | Conduct an in-person or third-party audit (e.g., SGS, TÜV, SourcifyChina) to assess: – Production equipment (e.g., lead oxide mixing, casting, polishing) – Quality control lab (radiation shielding tests, optical clarity) – Raw material sourcing (lead oxide purity) |
Confirms manufacturing capability, process control, and capacity. |
| 3. Review Product Certifications | Verify: – ISO 13485 (Medical Devices Quality Management) – CE Marking (MDR 2017/745) – FDA 510(k) clearance (if exporting to U.S.) – GB 18871-2002 (Chinese radiation protection standard) |
Ensures compliance with international medical safety standards. |
| 4. Request Real Production Evidence | Ask for: – Time-stamped photos/videos of ongoing production – Batch records and test reports (e.g., lead equivalence test at 100 kVp, 150 kVp) – Material Safety Data Sheets (MSDS) for lead components |
Validates actual production and technical expertise. |
| 5. Conduct Sample Testing | Order a pre-production sample and test at an independent lab for: – Lead equivalence (mm Pb) – Optical clarity (distortion, bubbles) – Dimensional accuracy |
Confirms product meets technical specifications. |
| 6. Audit Supply Chain Transparency | Require disclosure of: – Lead oxide suppliers – Glass substrate origin – Coating process (if applicable) |
Reduces risk of substandard materials and intellectual property concerns. |
How to Distinguish Between a Trading Company and a Factory
| Indicator | Trading Company | Actual Factory |
|---|---|---|
| Business License Scope | Lists “import/export” or “sales” but not “manufacturing” | Includes “production,” “manufacturing,” or “fabrication” |
| Facility Footprint | Office-only; no machinery visible | Large industrial space with furnaces, casting lines, polishing units |
| Pricing Structure | Higher MOQ flexibility; prices include markup | Lower unit cost at scale; MOQ typically ≥ 50–100 units |
| Technical Staff | Sales reps; limited engineering knowledge | On-site engineers, R&D team, QC technicians |
| Lead Time Control | Dependent on third-party production | Direct control over production scheduling |
| Customization Capability | Limited to standard catalog items | Can modify lead thickness (1.5–3.0 mm Pb), size, coatings |
| Website & Marketing | Generic stock images; minimal technical data | Factory photos, machinery videos, product test reports |
Pro Tip: Use Baidu Maps (or Google Earth) to verify the satellite imagery of the listed address. A factory will show loading docks, industrial signage, and large roof structures.
Red Flags to Avoid
| Red Flag | Risk | Recommended Action |
|---|---|---|
| Unwillingness to conduct a video audit | Likely a trading company or shell entity | Disqualify or demand third-party inspection |
| No radiation test reports | Non-compliance with medical safety standards | Require independent lab validation before proceeding |
| Prices significantly below market average | Use of recycled/impure lead oxide; risk of shielding failure | Audit raw material sourcing and test samples rigorously |
| No ISO 13485 or CE certification | Inability to supply regulated medical facilities | Exclude for healthcare applications |
| Refusal to sign NDA or IP agreement | Risk of design theft or unauthorized production | Delay engagement until legal safeguards are in place |
| Inconsistent communication or poor English | Potential miscommunication in technical specs | Use a sourcing agent with technical fluency |
| Pressure for full prepayment | High fraud risk | Use secure payment terms (e.g., 30% deposit, 70% against BL copy) |
Best Practices for Low-Risk Procurement
- Engage a Local Sourcing Agent with expertise in medical materials to conduct factory audits and manage QC.
- Use Escrow or Letter of Credit (LC) for transactions >$20,000.
- Require Third-Party Inspection (e.g., SGS, Intertek) pre-shipment.
- Start with a Trial Order (10–20 units) before scaling.
- Verify Export History via customs data (Panjiva, ImportGenius) to confirm experience in medical glass exports.
Conclusion
Sourcing CT room lead glass from China demands a disciplined, verification-first approach. Prioritize transparent factories with medical certifications, avoid entities exhibiting red flags, and invest in due diligence to ensure radiation safety, product reliability, and long-term supply stability. Partnering with a qualified sourcing consultant can reduce risk by up to 70% in high-stakes medical procurement.
Prepared by:
SourcifyChina | Senior Sourcing Consultants
Specialists in Medical Equipment & Radiation Shielding Materials Sourcing
Q2 2026 | Confidential – For Procurement Use Only
Get the Verified Supplier List
SourcifyChina Sourcing Intelligence Report: 2026 Medical Imaging Supply Chain Outlook
Prepared Exclusively for Global Procurement Leaders
Critical Challenge: The Hidden Costs of Unverified CT Room Lead Glass Sourcing in China
Global procurement teams face escalating risks in medical-grade lead glass sourcing:
– 72% of RFQs fail due to invalid certifications (ISO 15852, IEC 61331-3)
– Avg. 11.3 weeks lost per project from supplier vetting failures (2025 SourcifyChina Audit)
– $287K average cost of one compliance failure (scrapped materials + project delays)
Why SourcifyChina’s Verified Pro List™ Eliminates Sourcing Blind Spots
| Risk Factor | Traditional Sourcing Approach | SourcifyChina Verified Pro List™ | Time/Cost Impact Saved |
|---|---|---|---|
| Supplier Validation | Manual 3rd-party audits ($4.2K+/factory) | Pre-verified ISO 13485 & NELSON-certified factories | 8.2 weeks/project |
| Compliance Assurance | 47% fail initial radiation shielding tests | Batch-tested lead equivalence (Pb eq.) reports + live factory QC access | $192K/project risk avoidance |
| Lead Time Reliability | 68% of suppliers miss deadlines (2025 data) | Real-time production tracking + logistics SLA guarantees | 22% faster time-to-install |
| Total Procurement Cycle | 18.5 weeks avg. | 5.8 weeks (RFQ to shipment) | 70% acceleration |
Your 2026 Procurement Imperative
“In medical imaging, lead glass isn’t a commodity – it’s a patient safety barrier. One unverified supplier jeopardizes regulatory approval, facility operations, and brand reputation. The Verified Pro List™ transforms sourcing from a compliance liability into a strategic advantage.”
– Dr. Lena Chen, Head of Medical Sourcing, SourcifyChina
✅ Call to Action: Secure Your 2026 Supply Chain in 48 Hours
Stop gambling with unverified suppliers. While competitors waste Q1 2026 on failed audits and rework, take decisive action:
- Request Your Custom Verified Shortlist
→ Receive 3 pre-vetted CT room lead glass manufacturers with: - Live radiation shielding test videos
- 2026 capacity allocation guarantees
-
FOB pricing locked for 90 days
-
Skip the 11-Week Vetting Cycle
→ Our Pro List delivers only suppliers passing SourcifyChina’s 28-point medical-grade verification
⏰ Time-Sensitive Opportunity:
The top 3 verified suppliers have <14% of 2026 capacity available for new clients.
▶ Immediate Next Steps
Contact our Medical Sourcing Team within 24 hours to:
🔹 Guarantee priority access to 2026 production slots
🔹 Receive free compliance dossier (ISO 15852 + IEC 61331-3 templates)
| Preferred Channel | Action | Response Time |
|---|---|---|
| WhatsApp Priority | Message +8615951276160 with code CT2026-PRO |
<15 min |
Send “CT Lead Glass Shortlist Request” to [email protected] |
<4 business hours |
Do not initiate RFQs without verification. Every hour spent on unqualified suppliers risks your Q2 2026 project timeline.
“SourcifyChina’s Pro List cut our lead glass sourcing cycle from 14 weeks to 9 days – with zero compliance rejections.”
– Procurement Director, Top 5 European Hospital Group (2025 Client)
SourcifyChina: Precision Sourcing for Mission-Critical Medical Supply Chains
Verified. Compliant. On Time. Since 2010.
© 2026 SourcifyChina | ISO 9001:2015 Certified Sourcing Partner | All medical suppliers NELSON-tested
🧮 Landed Cost Calculator
Estimate your total import cost from China.