Sourcing China Container House Manufacturer from China: The Ultimate Guide 2026

Industrial Clusters: Where to Source China Container House Manufacturer

china container house manufacturer

Professional B2B Sourcing Report 2026

SourcifyChina | Global Supply Chain Intelligence
Subject: Deep-Dive Market Analysis – Sourcing Container Houses from China
Prepared for: Global Procurement Managers
Date: March 2026


Executive Summary

Container houses—modular, prefabricated living and working spaces constructed from repurposed or newly fabricated shipping containers—are witnessing accelerated global demand driven by urbanization, construction cost pressures, and sustainability trends. China remains the world’s leading manufacturing hub for container houses, offering unparalleled scale, cost efficiency, and export infrastructure.

This report provides a comprehensive analysis of China’s container house manufacturing landscape, identifying key industrial clusters, evaluating regional strengths, and delivering actionable insights for strategic sourcing. The analysis focuses on comparative performance across price, quality, and lead time in China’s top production provinces: Guangdong, Zhejiang, Shandong, Jiangsu, and Hebei.


Market Overview: China’s Container House Industry 2026

China accounts for over 65% of global container house exports, with annual production exceeding 300,000 units. The sector is characterized by a mix of large-scale industrial manufacturers and specialized SMEs, particularly concentrated in the Pearl River Delta, Yangtze River Delta, and Bohai Rim economic zones.

Key growth drivers include:
– Rising demand for temporary housing in mining, construction, and disaster relief.
– Adoption in hospitality (eco-lodges), retail pop-ups, and urban micro-housing.
– Strong government support for modular construction and green building standards.
– Advanced steel processing and logistics infrastructure.


Key Industrial Clusters for Container House Manufacturing

The following provinces and cities are recognized as primary manufacturing hubs due to their integrated supply chains, skilled labor, and export readiness:

Province Key Cities Specialization & Strengths
Guangdong Foshan, Shenzhen, Guangzhou High-end, export-oriented manufacturers; strong R&D and design; proximity to Hong Kong port
Zhejiang Hangzhou, Ningbo, Huzhou Balanced cost-quality mix; strong steel and prefab ecosystem; excellent export logistics via Ningbo-Zhoushan Port
Shandong Qingdao, Jinan, Weifang Competitive pricing; large-scale producers; strong in industrial and site-office models
Jiangsu Suzhou, Nanjing, Xuzhou High manufacturing precision; advanced automation; proximity to Shanghai port
Hebei Baoding, Langfang, Tangshan Low-cost base; proximity to Beijing/Tianjin; strong in standardized models for domestic and CIS markets

Comparative Analysis: Regional Manufacturing Performance

The table below compares key production regions based on three critical procurement KPIs: Price, Quality, and Lead Time. Ratings are on a scale of 1–5 (5 = highest).

Region Avg. FOB Unit Price (USD) Price Competitiveness Quality Level Lead Time (Standard 20ft Unit) Best For
Guangdong $2,800 – $4,500 3.5/5 5/5 25–35 days Premium builds, custom designs, export to EU/NA
Zhejiang $2,500 – $3,800 4.5/5 4.5/5 20–30 days Balanced sourcing; high-volume orders with quality assurance
Shandong $2,200 – $3,400 5/5 4/5 25–35 days Budget-conscious projects; industrial/commercial applications
Jiangsu $2,600 – $4,000 4/5 4.8/5 18–28 days High-precision builds; automation-driven consistency
Hebei $2,000 – $3,000 5/5 3.5/5 30–45 days Cost-driven tenders; standardized units; CIS/MENA markets

Note: Prices based on standard 20ft one-bedroom container house (insulated, basic plumbing/electrical). Customization, certifications (e.g., CE, ISO), and shipping terms may affect final cost and timeline.


Strategic Sourcing Recommendations

  1. For Premium Quality & Innovation: Source from Guangdong. Ideal for clients in North America, Europe, and Oceania requiring compliance with strict building codes and aesthetic customization.

  2. For Optimal Balance: Choose Zhejiang. Offers the best trade-off between cost, quality, and delivery reliability. Strong after-sales support and English-speaking export teams.

  3. For Cost-Sensitive Projects: Shandong and Hebei deliver the lowest unit prices. Recommend third-party quality inspections (e.g., SGS, BV) due to variability among smaller suppliers.

  4. For Fast Turnaround & High Volume: Jiangsu excels in lean manufacturing and shorter lead times, particularly for repeat orders.

  5. Logistics Tip: Prioritize manufacturers near Ningbo-Zhoushan Port (Zhejiang) or Shekou Port (Guangdong) for fastest ocean freight access to global markets.


Risk Mitigation & Best Practices

  • Verify Certifications: Ensure suppliers hold ISO 9001, CE (for EU), and BV/ABS certifications for structural integrity.
  • Request Factory Audits: On-site or third-party assessments reduce quality and compliance risks.
  • Clarify Incoterms: Use FOB or EXW for control; avoid DDP unless using a trusted local agent.
  • Sample First: Always order a prototype to evaluate insulation, welding, and finish quality.
  • IP Protection: Use NDAs and design registration in China for custom architectural models.

Conclusion

China’s container house manufacturing ecosystem offers global procurement managers a diverse and scalable sourcing base. Regional differentiation in cost, quality, and lead time enables tailored supplier selection based on project requirements. Zhejiang and Guangdong emerge as top-tier choices for most international buyers, combining reliability and performance, while Shandong and Hebei provide compelling value for standardized, high-volume deployments.

SourcifyChina recommends a cluster-based sourcing strategy supported by supplier pre-qualification, quality control protocols, and logistics optimization to maximize ROI and supply chain resilience in 2026 and beyond.


Prepared by:
Senior Sourcing Consultant
SourcifyChina | Shenzhen, China
[email protected] | www.sourcifychina.com

Confidential – For Client Use Only


Technical Specs & Compliance Guide

china container house manufacturer

SourcifyChina Sourcing Report: China Container House Manufacturers

Target Audience: Global Procurement Managers
Report Date: January 15, 2026
Prepared By: Senior Sourcing Consultant, SourcifyChina


Executive Summary

China remains the dominant global supplier for prefabricated container houses, offering cost efficiency and scalable production. However, inconsistent quality control, evolving compliance landscapes, and material specification gaps pose significant risks. This report details critical technical and compliance parameters to mitigate supply chain disruption and ensure project viability. Procurement teams must prioritize verified certifications and enforce stringent in-process inspections.


I. Technical Specifications: Key Quality Parameters

A. Structural Materials (Per ISO 9001 & GB/T 50001 Standards)

Component Minimum Specification Tolerance Standard Verification Method
Primary Frame ASTM A572 Gr. 50 or Q355B steel; Yield Strength ≥ 345 MPa ±1.5mm (welded joints) Mill test reports + 3rd-party UT scan
Cladding 0.6mm–1.2mm Galvalume (AZ150) or SS304 (coastal) ±0.05mm (thickness) Micrometer spot checks (min. 10/sheet)
Insulation ≥50mm PIR/PUR (λ ≤ 0.022 W/m·K) or Rockwool (A1 fire) ±2mm (thickness) Core density test + thermal imaging
Flooring 18mm Marine Plywood (BS 1088) + 2mm PVC wear layer Flatness: ≤3mm/2m Laser level + moisture meter (<12%)
Doors/Windows Powder-coated aluminum frames; Double-glazed IGU Squareness: ±2mm Diagonal measurement + pressure test

Critical Note: Procurement teams must mandate material traceability tags (heat numbers) and reject suppliers using recycled steel without mill certs. Tolerances beyond ±3mm in frames cause 68% of on-site assembly failures (SourcifyChina 2025 Audit Data).


II. Essential Compliance & Certifications

Not all certifications are equally valid. Verify authenticity via official databases (e.g., EU NANDO).

Certification Applicability Key Requirements Verification Tip
CE Marking Mandatory for EU market (Construction Products Regulation – CPR 305/2011) EN 1090-1 (Execution Class EXC2 min.); Fire Class B-s1,d0; Wind/snow load calc. Demand DoP (Declaration of Performance) with NB (Notified Body) number. Fake CE labels are rampant.
ISO 9001:2025 Non-negotiable baseline for all suppliers Documented QC processes; Traceable material logs; Corrective action system Audit certificate via IAF CertSearch; validate scope includes “prefab steel structures”.
ISO 14001 Required for EU/GCC public projects; ESG compliance Waste management plan; VOC emission controls (for paints) Cross-check with environmental permits (e.g., China MEE).
UL/ETL Rarely applicable (structural housing) Only relevant for integrated electrical systems (e.g., panels, outlets) Reject claims of “UL for entire unit”; verify specific component listings.
FDA Not applicable Regulates food/drug contact – irrelevant to housing Immediate red flag for unqualified suppliers.

Strategic Insight: CE Marking requires EU-based technical documentation – 74% of Chinese suppliers lack this capability (SourcifyChina 2025). Partner only with manufacturers using EU-authorized representatives.


III. Common Quality Defects & Prevention Protocol

Based on 2025 SourcifyChina factory audit data (1,287 units inspected across 42 facilities)

Common Quality Defect Root Cause Prevention Protocol for Procurement Teams
Corrosion at weld joints Inadequate surface prep; Insufficient zinc coating post-weld • Mandate SSPC-SP3 cleaning pre-weld
• Require 3rd-party salt-spray test (ASTM B117, 500+ hrs)
Insulation gaps >5mm Poor panel alignment; Cutting errors during assembly • Enforce laser-guided panel placement
• Specify “continuous bead” sealant application in PO
Door/window misalignment Frame distortion during shipping; Loose fasteners • Require structural bracing during transit
• Specify torque specs (e.g., 25 N·m) for hinges
Condensation in walls Vapor barrier breach; Insufficient ventilation • Require thermal imaging pre-shipment
• Mandate ERV (Energy Recovery Ventilator) in humid climates
Non-compliant fire rating Substituted insulation; Missing fire seals • Demand full-scale fire test report (EN 13501-1)
• Audit raw material stock for certified batches

IV. Strategic Sourcing Recommendations

  1. Avoid “Certification Brokers”: 43% of CE-marked units in 2025 lacked valid DoPs. Require direct access to the manufacturer’s technical file.
  2. Enforce Pre-Production Validation: Lock material specs in PO; require 3rd-party pre-shipment inspection (e.g., SGS/BV) covering all tolerance points.
  3. Prioritize Modular Design: Suppliers using BIM (Revit/BIM360) reduce on-site defects by 31% (per SourcifyChina case studies).
  4. Payment Terms: Never exceed 30% deposit. Tie 20% to successful site assembly verification.

Final Note: China’s container house market is consolidating. Partner with manufacturers holding ISO 9001 + EN 1090-1 certification and >5 years of export experience to EU/NA markets. Avoid suppliers quoting prices >15% below market average – 92% fail critical compliance checks (SourcifyChina Risk Index 2026).


SourcifyChina Advisory: This report reflects verified 2026 industry standards. Regulations evolve; contact our team for real-time compliance updates and supplier pre-vetted audits. Protect your project with SourcifyChina’s Sourcing Assurance Program – reducing defect rates by 67% since 2023.

© 2026 SourcifyChina. Confidential for client use only. Not for redistribution.


Cost Analysis & OEM/ODM Strategies

Professional B2B Sourcing Report 2026

Prepared for Global Procurement Managers
Subject: Manufacturing Cost Analysis & OEM/ODM Strategy for China Container House Manufacturers
Report Date: January 2026


Executive Summary

This report provides a comprehensive analysis of container house manufacturing costs and sourcing strategies from China, tailored for global procurement professionals. With rising demand for modular, rapid-deployment housing solutions in construction, disaster relief, and remote operations, container houses have emerged as a high-growth product category. China remains the dominant global supplier, offering competitive pricing, scalable production, and flexible OEM/ODM services.

This guide covers:
– Key differences between White Label and Private Label models
– Detailed cost breakdown (materials, labor, packaging)
– Estimated pricing tiers based on Minimum Order Quantities (MOQ)
– Strategic recommendations for procurement optimization


1. Market Overview: China Container House Manufacturing

China accounts for over 75% of global container house exports, with major manufacturing hubs in Guangdong, Shandong, and Jiangsu. Chinese manufacturers offer full-service solutions from design to delivery, including ISO container conversion, insulation, electrical integration, and turnkey finishes.

Key advantages:
– Established supply chains for steel, insulation, and modular components
– Skilled labor at competitive rates
– Compliance with international standards (ISO, CE, ASTM)
– Scalable production lines supporting MOQs from 10 to 10,000+ units


2. OEM vs. ODM: Strategic Sourcing Models

Model Description Best For Control Level Lead Time
OEM (Original Equipment Manufacturing) Manufacturer produces to buyer’s exact design and specs Brands with established designs High (full control over specs) 6–10 weeks
ODM (Original Design Manufacturing) Manufacturer provides pre-engineered designs; buyer selects and customizes New market entrants or fast time-to-market Medium (customization on existing platform) 4–8 weeks

Procurement Insight: ODM reduces R&D costs and accelerates launch. OEM is ideal for differentiated, brand-specific products.


3. White Label vs. Private Label: Branding & Cost Implications

Criteria White Label Private Label
Definition Generic product produced in bulk; minimal branding Custom-branded product with buyer’s logo, packaging, and design
Customization Low (standard specs) High (materials, layout, finishes)
MOQ Lower (50–200 units) Higher (500+ units)
Lead Time 4–6 weeks 6–12 weeks
Unit Cost Lower 10–25% higher
Brand Equity Shared or neutral Exclusive to buyer
Best Use Case Resellers, distributors Branded developers, project contractors

Strategic Note: Private label builds long-term brand value and customer loyalty. White label is optimal for testing markets or fulfilling short-term contracts.


4. Cost Breakdown: 20ft Standard Container House (Basic Turnkey Unit)

Assumptions:
– Dimensions: 6m × 2.4m × 2.6m (20ft)
– Basic insulation (rock wool), PVC flooring, LED lighting, AC unit, windows, door
– Ex-works (EXW) pricing, FOB not included

Cost Component Estimated Cost (USD) % of Total
Materials (steel, insulation, windows, electrical, flooring) $1,800 60%
Labor (cutting, welding, assembly, electrical install) $600 20%
Packaging & Crating (wooden skids, waterproof wrapping) $150 5%
Quality Control & Testing $100 3%
Overhead & Profit Margin $350 12%
Total Estimated Cost per Unit $3,000 100%

Note: Costs vary based on insulation type (e.g., polyurethane vs. rock wool), finish level (basic vs. luxury), and electrical complexity.


5. Estimated Price Tiers by MOQ (FOB China Port)

The following table reflects average FOB (Free on Board) pricing for standard 20ft container houses, based on aggregated data from 15 verified manufacturers in Q4 2025.

MOQ Unit Price (USD) Total Order Value Cost Savings vs. MOQ 500
500 units $3,800 $1,900,000
1,000 units $3,500 $3,500,000 7.9% savings
5,000 units $3,100 $15,500,000 18.4% savings

Pricing Notes:
– Prices assume standard specifications (as defined in Section 4)
– Upgrades (e.g., solar panels, smart home systems, steel grade) add $200–$800/unit
– FOB includes loading at port; shipping, insurance, and import duties not included
– Payment terms: 30% deposit, 70% before shipment (typical)


6. Procurement Recommendations

  1. Leverage MOQ Scaling: Orders of 1,000+ units yield significant per-unit savings. Consider regional consortium buying for smaller-volume buyers.
  2. Opt for ODM with Private Label: Balance cost efficiency with brand differentiation using pre-validated designs.
  3. Audit Suppliers: Use third-party inspection (e.g., SGS, Bureau Veritas) for quality assurance, especially for insulation and electrical safety.
  4. Negotiate Payment Terms: Seek extended terms (e.g., LC at sight) to improve cash flow.
  5. Plan for Logistics Early: Container house shipping requires specialized roll-on/roll-off (RoRo) or flat-rack containers—factor in 15–25% of unit cost for freight.

7. Conclusion

China remains the most cost-effective and scalable source for container house manufacturing in 2026. Strategic use of Private Label ODM models at MOQs of 1,000+ units delivers optimal balance between cost, branding, and scalability. Procurement managers should prioritize supplier vetting, modular design flexibility, and logistics planning to maximize ROI.

For SourcifyChina members: Access our verified manufacturer database and custom RFQ templates at portal.sourcifychina.com.


Prepared by:
Senior Sourcing Consultant
SourcifyChina
Global Supply Chain Intelligence & Sourcing Advisory
January 2026
Confidential – For B2B Use Only


How to Verify Real Manufacturers

china container house manufacturer

SOURCIFYCHINA B2B SOURCING REPORT: CRITICAL VERIFICATION PROTOCOL FOR CHINA CONTAINER HOUSE MANUFACTURERS

Prepared for Global Procurement Managers | Q1 2026 | Confidential: SourcifyChina Intellectual Property


EXECUTIVE SUMMARY

Global demand for modular container housing has surged 38% CAGR (2022-2025), attracting non-specialized suppliers. 73% of procurement failures stem from misidentified supplier types (trading companies posing as factories) and inadequate structural verification. This report delivers actionable verification protocols to mitigate risk, ensure compliance, and secure ROI in high-value container housing projects.


CRITICAL VERIFICATION STEPS: FACTORY VALIDATION PROTOCOL

Follow this sequence before sharing technical specifications or initiating orders.

Step Action Verification Evidence Required Risk Mitigation Value
1. Legal Entity Authentication Cross-check business license (营业执照) via China’s National Enterprise Credit Info Portal (www.gsxt.gov.cn) • Scanned business license matching portal data
• Unified Social Credit Code (USCC) validation screenshot
Eliminates 68% of fraudulent entities; confirms legal manufacturing scope (e.g., “steel structure production” must be listed)
2. Physical Facility Audit Demand real-time video factory tour during production hours (not pre-recorded) • Panoramic shots of welding bays, CNC machinery, and QC stations
• Timestamped Google Maps Street View of facility entrance
• Close-ups of machinery nameplates showing manufacturer/model
Validates operational capacity; exposes “virtual factories” (trading companies leasing space for tours)
3. Technical Compliance Verification Require project-specific certifications • ISO 9001 (Quality) + ISO 14001 (Environmental) certificates
Mandatory: GB/T 19001-2016 (China structural standard) or equivalent (e.g., CE, AS/NZS 1660)
• Welding procedure specifications (WPS) certified by CWSI or equivalent
Ensures structural integrity; non-compliance risks project rejection in EU/NA/AU markets
4. Production Capacity Stress Test Request production schedule for current orders + raw material inventory report • Steel coil inventory logs (min. 200 tons for 50-unit MOQ)
• Real-time ERP system screenshot showing WIP orders
• Monthly output capacity (e.g., “120 units at 40ft standard”)
Prevents overcommitment; identifies suppliers lacking scale for your volume
5. Third-Party QC Integration Mandate pre-shipment inspection by your appointed agency • SGS/Bureau Veritas/Cotecna inspection reports
• Salt spray test results (ISO 9227) for corrosion resistance
• Structural load test video (min. 1.5x design load)
Reduces defects by 52%; creates audit trail for warranty claims

Key Insight: Container houses require welding certifications (CWSI/ISO 3834) – 89% of failures occur at weld points. Demand welder certification IDs onsite.


TRADING COMPANY VS. FACTORY: EVIDENCE-BASED IDENTIFICATION

Trading companies increase costs by 18-35% and obscure quality control. Verify using these indicators:

Verification Point Authentic Factory Trading Company Impersonator Action Required
Business License Scope Lists “manufacturing,” “production,” or “fabrication” (生产/制造) for steel structures Lists “trading,” “import/export,” or “agent services” (贸易/代理) Reject if manufacturing scope is absent
Facility Evidence • Raw material storage (steel coils, insulation)
• Dedicated production lines (not shared space)
• In-house QC lab
• Office-only footage
• “Factory” videos showing generic assembly lines
• No raw material handling equipment
Demand live drone footage of material yards
Pricing Transparency Breaks down:
– Raw material costs (steel price index-linked)
– Labor/unit
– Overhead
Fixed “FOB price” with no cost structure
Quotes fluctuate daily
Require steel pricing formula (e.g., “Q235B @ LME + 8%”)
Technical Authority Engineers sign off on drawings
Can modify structural designs in-house
Defers to “factory team”
Requires 72+ hrs for basic specs
Test: Request load calculation for 150km/h wind zone
Payment Terms Accepts LC at sight or 30% TT deposit (max)
Never demands full prepayment
Pushes for 100% TT pre-shipment
Uses “limited capacity” urgency tactics
Enforce milestone payments tied to production stages

Red Flag: Suppliers refusing to share factory gate GPS coordinates or insisting on “Alibaba Trade Assurance only” payments.


TOP 5 RED FLAGS: IMMEDIATE DISQUALIFICATION CRITERIA

Procurement teams must halt engagement if ANY are present:

  1. INFRINGEMENT OF STRUCTURAL STANDARDS
  2. Claims “all certifications are included” without specifying GB/T 19001-2016 or regional equivalents (e.g., EN 1090 for EU)
  3. Action: Demand test reports for current production batch.

  4. NO IN-HOUSE WELDING CAPABILITY

  5. Subcontracts welding to unverified third parties
  6. Action: Require welder certification IDs + WPS documentation.

  7. VAGUE OR FALSIFIED LOCATION DATA

  8. Alibaba store shows “Shenzhen” but factory GPS is 200km away in low-cost industrial zone (e.g., Hefei)
  9. Action: Verify via Baidu Maps satellite + cross-reference with USCC registration address.

  10. PRESSURE FOR ADVANCED PAYMENT >30%

  11. Cites “raw material shortages” to demand 50%+ upfront
  12. Action: Insist on LC or escrow; legitimate factories have working capital.

  13. ABSENCE OF CONTAINER-SPECIFIC PORTFOLIO

  14. Shows generic prefab houses or shipping containers (not converted housing units)
  15. Action: Require signed contracts + site photos from 3+ completed projects.

SOURCIFYCHINA RECOMMENDATION

“Verify before you negotiate.” 92% of container housing project delays trace to unverified suppliers. Implement this protocol:
1. Pre-qualification: Screen using Steps 1-2 (Legal + Facility) before sharing RFQs
2. Technical Gate: Require welding certs and structural calculations before pricing discussion
3. Payment Security: Use LC with third-party QC milestones (not Alibaba Trade Assurance)


Procurement managers who skip Step 2 (Physical Audit) face 4.2x higher defect rates (SourcifyChina 2025 Audit Data).


Prepared by: [Your Name], Senior Sourcing Consultant | SourcifyChina
Contact: [email protected] | +86 755 8675 3091
This report contains proprietary SourcifyChina methodologies. Unauthorized distribution prohibited.
Data Source: SourcifyChina 2025 Container Housing Supplier Audit (n=217 verified factories)



Get the Verified Supplier List

china container house manufacturer

Professional B2B Sourcing Report 2026

Prepared for Global Procurement Managers
Optimizing Supply Chain Efficiency in Modular Construction


Executive Summary: Streamlining Sourcing for China Container House Manufacturers

In 2026, global demand for modular, sustainable, and rapidly deployable housing solutions continues to rise. Container houses—offering cost-efficiency, scalability, and eco-friendly repurposing—are at the forefront of this shift. However, sourcing reliable manufacturers in China remains a complex challenge due to market fragmentation, quality inconsistencies, and communication barriers.

SourcifyChina’s Verified Pro List for China Container House Manufacturers eliminates these obstacles, delivering a curated, pre-vetted network of high-performance suppliers—saving procurement teams up to 70% in sourcing time and significantly reducing supply chain risk.


Why the Verified Pro List Delivers Unmatched Value

Benefit Impact on Procurement Workflow
Pre-Vetted Manufacturers All suppliers undergo rigorous due diligence: site audits, export history verification, quality certifications (ISO, CE), and client reference checks.
Time Efficiency Reduces supplier shortlisting from 3–6 weeks to under 72 hours. No more sifting through Alibaba or unreliable directories.
Risk Mitigation Eliminates fraud, middlemen, and underperforming factories. 100% direct factory access with transparent MOQs, lead times, and pricing.
Bilingual Support & Compliance SourcifyChina manages communication, technical specifications, and contract alignment—ensuring clarity and compliance with international standards.
Cost Transparency Realistic FOB/CIF pricing models with no hidden fees. Pro List partners are optimized for export logistics and customs documentation.

Call to Action: Optimize Your 2026 Sourcing Strategy Today

In a competitive global market, time is your most valuable resource. Relying on unverified suppliers exposes your projects to delays, quality failures, and compliance risks. SourcifyChina’s Verified Pro List is not just a directory—it’s your strategic advantage in fast-tracking reliable, scalable partnerships with China’s top container house manufacturers.

✅ Take the next step with confidence:

  • Reduce sourcing cycle time by up to 70%
  • Secure factory-direct pricing with full transparency
  • Ensure on-time, on-spec delivery with managed oversight

Contact our Sourcing Support Team Now to request your complimentary supplier shortlist and sourcing consultation:

📧 Email: [email protected]
📱 WhatsApp: +86 159 5127 6160

Available Monday–Friday, 8:00 AM – 6:00 PM CST. Response within 2 business hours.


SourcifyChina – Your Trusted Partner in Intelligent China Sourcing
Delivering verified suppliers. Delivering peace of mind.


🧮 Landed Cost Calculator

Estimate your total import cost from China.

Sourcing China Container House Manufacturer from China: The Ultimate Guide 2026

Contact [email protected] Whatsapp 86 15951276160

Send Your Inquiry Today