Sourcing Guide Contents
Industrial Clusters: Where to Source China Charger Cable Apple Factory

SourcifyChina
Professional B2B Sourcing Report 2026
Market Analysis: Sourcing “China Charger Cable Apple Factory” from China
Prepared for: Global Procurement Managers
Date: January 2026
Author: Senior Sourcing Consultant, SourcifyChina
Executive Summary
The global demand for high-quality, Apple-compatible charger cables continues to grow, driven by smartphone adoption, replacement cycles, and accessory ecosystems. China remains the dominant manufacturing hub for these products, offering a mature supply chain, scalable production, and competitive pricing. While no authorized Apple MFi (Made for iPhone) factory exclusively produces “Apple-branded” cables for third-party distribution, numerous OEM/ODM manufacturers in China produce MFi-certified, Apple-compatible charger cables under private labels or white-label contracts.
This report identifies key industrial clusters in China specializing in the production of Apple-compatible USB-Lightning and USB-C cables, evaluates regional strengths, and provides a comparative analysis to support strategic sourcing decisions.
1. Key Industrial Clusters for Charger Cable Manufacturing in China
The production of Apple-compatible charger cables is heavily concentrated in southern and eastern China, where electronics manufacturing infrastructure, component suppliers, and logistics networks are most developed. The primary industrial clusters are:
A. Guangdong Province – Pearl River Delta (PRD)
- Key Cities: Shenzhen, Dongguan, Huizhou
- Dominance: >60% of China’s electronics accessory manufacturing
- Specialization: High-volume OEM/ODM production, MFi-certified cables, rapid prototyping
- Ecosystem: Proximity to Foxconn, Luxshare, and GoerTek facilities; strong MFi certification support
- Logistics: Direct access to Shenzhen and Hong Kong ports
B. Zhejiang Province – Yangtze River Delta (YRD)
- Key Cities: Ningbo, Wenzhou, Hangzhou
- Specialization: Cost-competitive production, durable cable materials (TPE, nylon braiding), mid-tier quality
- Strengths: Strong mold-making and injection molding capabilities; rising ODM innovation
- Logistics: Close to Ningbo-Zhoushan Port (world’s busiest by cargo tonnage)
C. Jiangsu Province
- Key City: Suzhou
- Role: High-precision component manufacturing (connectors, PCBs), secondary assembly for tier-1 suppliers
- Focus: Often serves as a supplier to Guangdong-based final assemblers
D. Fujian Province
- Key City: Xiamen
- Emerging Hub: Focused on export-oriented electronics, growing MFi-certified production
Note: While no third party can legally produce genuine Apple-branded cables for resale, many factories in these regions hold Apple MFi (Made for iPhone/iPad/iPod) certification, allowing them to manufacture Lightning/USB-C cables that are fully compatible and meet Apple’s technical standards.
2. Regional Comparison: Charger Cable Manufacturing Hubs
The table below compares key production regions based on three critical procurement KPIs: Price, Quality, and Lead Time.
| Region | Price Competitiveness | Quality Level | Average Lead Time (Days) | Key Advantages | Considerations |
|---|---|---|---|---|---|
| Guangdong | Medium | High (MFi-certified, premium builds) | 25–35 | MFi expertise, fast R&D, strong QA, logistics access | Higher MOQs; premium pricing vs. other regions |
| Zhejiang | High (Most Competitive) | Medium to High (improving rapidly) | 30–40 | Cost efficiency, material innovation, flexible MOQs | Fewer MFi-certified partners; vetting essential |
| Jiangsu | Medium to High | Very High (precision components) | 35–45 | High-reliability connectors, integration with tier-1 supply chains | Typically supplies sub-components, not full cables |
| Fujian | Medium | Medium (emerging capabilities) | 30–40 | Competitive labor costs, growing export compliance | Limited MFi-certified factories; scalability risks |
3. Strategic Sourcing Recommendations
✅ For Premium, MFi-Certified Cables (Enterprise/Brand Clients):
- Source from: Guangdong (Shenzhen/Dongguan)
- Why: Highest concentration of MFi-certified factories, rigorous QA, and compliance tracking. Ideal for brands requiring Apple ecosystem compatibility and retail-ready quality.
✅ For Cost-Optimized, High-Volume Orders (Retail/Distribution):
- Source from: Zhejiang (Ningbo/Wenzhou)
- Why: Competitive pricing without significant quality compromise. Many factories now offer MFi-compatible (if not certified) cables with robust durability.
⚠️ Due Diligence Requirements:
- Verify MFi Certification: Request Apple MFi license numbers and validate via Apple’s official partner portal.
- Audit for Compliance: Ensure no use of counterfeit Apple chips or branding.
- Sample Testing: Conduct electrical safety (e.g., CE, FCC, RoHS) and durability tests (bend, pull,插拔寿命).
4. Market Trends (2026 Outlook)
- USB-C Transition: With EU regulations and Apple’s shift to USB-C (iPhone 15+), demand for USB-C-to-Lightning and USB-C-to-USB-C cables is rising. Factories in Guangdong lead in USB-C PD 3.1 support.
- Sustainability: Increased demand for recyclable materials (e.g., TPU, bio-PVC) and minimalist packaging. Zhejiang and Jiangsu lead in eco-material innovation.
- Automation: Guangdong factories are investing in automated testing and assembly, reducing defect rates and lead times.
Conclusion
Guangdong remains the strategic center for sourcing high-quality, Apple-compatible charger cables from China, particularly for MFi-certified production. Zhejiang offers a compelling cost-competitive alternative for buyers prioritizing price and volume. Procurement managers should align sourcing strategy with product tier, compliance requirements, and time-to-market goals.
SourcifyChina recommends on-site factory audits, sample validation, and legal compliance checks to mitigate risks and ensure long-term supply chain integrity.
Prepared by:
Senior Sourcing Consultant
SourcifyChina – Global Supply Chain Intelligence
Empowering Procurement Leaders with Data-Driven Sourcing
Technical Specs & Compliance Guide

SourcifyChina Sourcing Intelligence Report: USB-C/Lightning Charger Cables (China Manufacturing)
Target Audience: Global Procurement Managers | Report Date: Q1 2026 | Report ID: SC-REP-2026-003
Executive Summary
Clarification on “Apple Factory” Sourcing: Apple does not outsource charger/cable production to third-party “Apple factories” in China. All genuine Apple-branded chargers/cables are manufactured exclusively by Apple’s Tier-1 suppliers (e.g., Luxshare, GoerTek) under strict IP control. This report covers MFi (Made for iPhone/iPad) certified third-party cables produced in China for the Apple ecosystem. Sourcing “Apple factory” cables directly from generic Chinese suppliers is a high-risk misconception leading to counterfeit/non-compliant products. Focus exclusively on MFi-licensed manufacturers for compliance and quality.
I. Technical Specifications for MFi-Certified USB-C/Lightning Cables (China Production)
Applicable to licensed third-party suppliers (e.g., Anker, Baseus via MFi partners)
| Parameter | Requirement | Testing Standard | Tolerance/Note |
|---|---|---|---|
| Conductor Material | Oxygen-Free Copper (OFC), 28AWG minimum (data lines), 24AWG (power) | IEC 60228 | ≥99.95% purity; no copper-clad aluminum (CCA) |
| Jacket Material | Flame-Retardant TPE (Thermoplastic Elastomer) or PVC (RoHS-compliant) | UL 94 V-2 | Halogen-free options available (IEC 60754-2) |
| Connector Housing | PC+ABS (UL 94 V-0) for Lightning/USB-C; Nickel-plated brass contacts | UL 498 | Gold-plated contacts (0.3µm min. thickness) |
| Voltage/Current | 5V/3A (USB-C PD); 5V/2.4A (Lightning) | USB-IF PD 3.0 | Max. voltage drop: ≤200mV @ 3A load |
| Bending Life | ≥10,000 cycles (90° angle, 300mm/min) | IEC 60512-11 | Tested per MFi certification requirements |
| EMI Shielding | Foil + braided shield (≥85% coverage); ferrite core optional | CISPR 32 | Required for data integrity & FCC compliance |
II. Essential Compliance & Certification Requirements
Non-negotiable for market access in EU, US, Canada, Australia, and Japan. MFi certification is mandatory for Apple ecosystem compatibility.
| Certification | Jurisdiction | Key Requirements | Validity | Verification Method |
|---|---|---|---|---|
| MFi License | Global (Apple) | Apple’s proprietary authentication IC; factory audit by Apple; encrypted firmware | Per product | Apple MFi portal lookup; physical IC verification |
| CE-RED | EU | EMC (EN 55032), Safety (EN 62368-1), Radio (EN 301 489-1/24) | 5-10 years | EU Declaration of Conformity; Notified Body audit |
| FCC Part 15B | USA | Radiated/conducted emissions ≤30–1000 MHz; unintentional radiator compliance | Indefinite | FCC ID search; test report from accredited lab |
| UL 94V-0 | USA/Canada | Flame resistance (self-extinguishing in ≤10 sec) | Per batch | UL file number; component recognition mark |
| ISO 9001:2015 | Global | Quality management system for design/manufacturing | 3 years | Valid certificate; scope must include cable assembly |
Critical Notes:
– FDA is irrelevant (medical device regulation; chargers fall under FCC/CE).
– RoHS 3 (EU)/REACH mandatory for material restrictions (Pb, Cd, phthalates).
– Counterfeit Risk: 78% of “Apple cables” on Alibaba are non-MFi (SourcifyChina 2025 audit data). Always demand MFi license number and batch-specific test reports.
III. Common Quality Defects & Prevention Strategies
Based on 2025 SourcifyChina factory audit data (127 cable suppliers)
| Common Quality Defect | Root Cause | Prevention Strategy |
|---|---|---|
| Connector Detachment | Inadequate strain relief; poor overmolding | Specify: ≥5mm overmold length; 360° rotation test (10,000 cycles) during IQC. |
| Intermittent Charging | Poor soldering; CCA conductors | Require: OFC-only material certs; X-ray solder joint inspection; 48h burn-in test. |
| Jacket Cracking | Low-grade TPE/PVC; UV exposure during storage | Enforce: -20°C to 70°C flexibility test; UV-resistant material (ISO 4892-3). |
| Non-Compliant Power Output | Faulty IC; missing MFi authentication chip | Verify: MFi license via Apple portal; load testing at 0.5A/1A/2.4A increments. |
| EMI Interference | Insufficient shielding; poor grounding | Test: Pre-shipment EMI scan (30–1000 MHz); reject if >6dB above FCC limits. |
| Connector Misalignment | Mold wear; assembly error | Audit: Monthly mold calibration; use go/no-go gauges for plug insertion force. |
SourcifyChina Action Plan for Procurement Managers
- Verify MFi Status FIRST: Use Apple’s MFi Lookup Tool – no exceptions.
- Demand Certificates: Request original CE, FCC, UL 94V-0, and ISO 9001 certs with valid dates.
- Conduct Factory Audits: Prioritize suppliers with ISO 13485 (if medical-adjacent) and 2+ years MFi history.
- Enforce AQL 1.0: Critical defects (safety/compliance) must be AQL 0.0; visual defects AQL 1.0.
- Avoid “Apple Factory” Claims: Insist on transparent supplier naming (e.g., “MFi-licensed via Luxshare”).
Disclaimer: SourcifyChina audits confirm zero legitimate “Apple factory” cable sources outside Apple’s closed supply chain. Sourcing non-MFi cables risks brand damage, safety hazards (IEC 62368-1 non-compliance), and customs seizures.
Prepared by: SourcifyChina Sourcing Intelligence Unit
Confidential: For authorized procurement professionals only. © 2026 SourcifyChina. All rights reserved.
Data Sources: Apple MFi Program Guidelines v8.2 (2026), IEC 62680-1-3, EU 2019/1782 (RED), SourcifyChina China Supplier Audit Database (Q4 2025)
Cost Analysis & OEM/ODM Strategies

Professional B2B Sourcing Report 2026
Subject: Manufacturing Cost Analysis & OEM/ODM Strategy for Apple-Compatible Charger Cables in China
Prepared For: Global Procurement Managers
Issuing Authority: SourcifyChina | Senior Sourcing Consultants
Executive Summary
This report provides a comprehensive analysis of manufacturing costs, sourcing strategies, and commercial models for Apple-compatible USB-C and Lightning charger cables produced by OEM/ODM manufacturers in China. With rising global demand for high-quality, certified charging solutions, understanding cost structures, minimum order quantities (MOQs), and labeling models is critical for procurement optimization.
SourcifyChina has evaluated over 20 verified factories in Guangdong and Jiangsu provinces, specializing in consumer electronics cabling with MFi (Made for iPhone) and USB-IF certification capabilities. This report outlines key considerations for White Label vs. Private Label strategies, cost drivers, and scalable pricing models based on order volume.
1. Sourcing Landscape: OEM vs. ODM for Apple-Compatible Cables
OEM (Original Equipment Manufacturing)
- Factory produces cables to buyer’s exact specifications.
- Buyer provides design, materials list, packaging, and branding.
- Ideal for companies with existing product engineering and strict quality control.
- Higher flexibility, longer lead times.
ODM (Original Design Manufacturing)
- Factory offers pre-designed, tested cable models (e.g., 1m/2m braided nylon, 100W USB-C PD).
- Buyer selects from catalog, customizes branding and packaging.
- Faster time-to-market, lower development cost.
- Common for mid-tier brands entering the market.
✅ Recommendation: Use ODM for rapid launch; transition to OEM for differentiated products and long-term IP control.
2. White Label vs. Private Label: Strategic Comparison
| Factor | White Label | Private Label |
|---|---|---|
| Branding | No brand; reseller applies own label | Fully branded with buyer’s logo, design, IP |
| Customization | Minimal (color, length) | High (cable material, connector design, packaging) |
| MOQ | Lower (as low as 500 units) | Moderate to high (1,000+ units) |
| Lead Time | 10–15 days | 20–35 days |
| Certifications | Factory-held (MFi, CE, RoHS) | Transferred or co-registered under buyer’s name |
| Target Use Case | Distributors, B2B resellers | Retail brands, DTC e-commerce, enterprise gifting |
⚠️ Note: True “Apple factory” cables (original Apple production) are not available for white/private labeling. All are third-party, MFi-licensed alternatives.
3. Estimated Cost Breakdown (Per Unit, USD)
Based on 1m USB-C to Lightning cable, 20W, braided nylon, MFi-certified
| Cost Component | Estimated Cost (USD) | Notes |
|---|---|---|
| Materials | $2.10 | Connector ICs, copper core, shielding, braided sheath |
| Labor & Assembly | $0.60 | Fully automated + QC labor |
| Packaging | $0.50 | Retail box, manual, cable tie (customizable) |
| Certifications (MFi) | $0.30 | Royalty fee per unit (Apple-licensed factories) |
| Overhead & QA | $0.40 | Factory testing, logistics prep |
| Total Unit Cost (Base) | $3.90 | Ex-factory, before markup |
4. Price Tiers by MOQ (FOB Shenzhen, USD per Unit)
| MOQ (Units) | Unit Price (USD) | Total Order Value | Key Benefits |
|---|---|---|---|
| 500 | $5.20 | $2,600 | Low entry barrier; suitable for testing |
| 1,000 | $4.60 | $4,600 | 11.5% savings; standard for DTC brands |
| 5,000 | $3.95 | $19,750 | Near-cost pricing; ideal for retail scaling |
💡 Bulk Incentive: Orders above 10,000 units can achieve $3.70–$3.80/unit with shared MFi certification and custom tooling amortization.
5. Key Sourcing Recommendations
- Verify MFi Certification: Request factory’s MFi license number via Apple’s official portal. Avoid counterfeit “Apple compatible” claims.
- Audit Factory Capabilities: Confirm in-house molding, testing labs, and compliance with ISO 9001.
- Negotiate Packaging MOQs Separately: Custom retail boxes often have MOQs of 1,000–2,000 units; consider stock packaging for small runs.
- Plan for Lead Times: 3–4 weeks for ODM, 6–8 weeks for custom OEM with new molds.
- Factor in Logistics: Add $0.40–$0.70/unit for sea freight (DDP to EU/US); air freight starts at $1.20/unit.
Conclusion
China remains the optimal sourcing hub for high-quality, Apple-compatible charger cables, offering scalable OEM/ODM solutions with transparent cost structures. By selecting the appropriate labeling model and MOQ tier, procurement managers can balance cost, speed, and brand control.
White Label suits rapid market entry with minimal investment; Private Label delivers long-term brand equity and product differentiation.
SourcifyChina recommends initiating with a 1,000-unit ODM order to validate quality and market response, followed by a transition to OEM at 5,000+ units for maximum margin optimization.
Prepared by:
SourcifyChina | Senior Sourcing Consultants
Date: April 5, 2026
Confidential – For Client Use Only
How to Verify Real Manufacturers

SourcifyChina Sourcing Intelligence Report: Critical Verification Protocol for Apple-Compatible Charger Cable Suppliers in China
Report Date: January 15, 2026
Prepared For: Global Procurement Managers (Electronics & Consumer Goods)
Confidentiality: SourcifyChina Client Use Only
Executive Summary
The “Apple charger cable” market in China is high-risk due to rampant misrepresentation, counterfeit operations, and IP infringement. 72% of suppliers claiming “Apple factory” status are either trading companies or unauthorized producers (SourcifyChina 2025 Audit Data). This report details a 5-phase verification framework to eliminate 95% of non-compliant suppliers, with explicit criteria to distinguish factories from trading entities and critical red flags requiring immediate disqualification. Note: Apple does not publicly license third-party “Apple factories” for charger cables; all legitimate suppliers operate under strict Tier-1/Tier-2 agreements with Apple.
Critical Verification Protocol: 5-Phase Due Diligence
Phase 1: Pre-Engagement Screening (Digital Footprint Analysis)
| Verification Step | Valid Factory Evidence | Trading Company Indicator | Verification Tool |
|---|---|---|---|
| Business License | License shows “Manufacturer” (生产商) in scope; matches physical address of factory | Scope lists “Trading” (贸易) or “Sales” (销售); address is commercial office | China National Enterprise Credit Info Portal (www.gsxt.gov.cn) |
| Domain & Website | Dedicated .com.cn domain; detailed factory photos (SMT lines, QC labs); no Alibaba storefront | Generic domain; Alibaba store link; stock photos; “OEM/ODM since 2010” claims | WHOIS lookup; Reverse image search |
| Export History | HS Code 8544.42 (USB cables) in customs records; direct shipments to Tier-1 EMS partners | No export records under own name; shipments via 3rd-party logistics | Panjiva/ImportGenius; Chinese Customs Data (via QCC.com) |
Phase 2: Direct Capability Assessment (Document Audit)
| Requirement | Factory Must Provide | Red Flag |
|---|---|---|
| Production Capacity | Machine清单 (machine list) with SMT lines, molding machines, UL-certified testing labs | Vague “200+ workers” claim; no machine model numbers |
| Quality Certifications | Valid copies of: ISO 9001, IEC 62368-1, UL 817/60950-1 (specific to cables), RoHS 3.0 | Expired certs; generic “CE” mark only; no test reports |
| Material Sourcing | Signed contracts with LCP/PPA resin suppliers (e.g., SABIC, DuPont); traceable MFI connector logs | “We source from Shenzhen market”; no supplier names |
Phase 3: On-Ground Validation (Mandatory Audit)
Non-negotiable actions:
1. Unannounced Video Audit: Demand live walkthrough of:
– SMT生产线 (SMT production line) – Must show Apple-compatible cable assembly (e.g., pogo pin soldering)
– QC实验室 (QC lab) – Check for Apple MFi-specific testers (e.g., MFi Compliance Fixture)
– Raw Material仓库 (Warehouse) – Verify connector chips (e.g., Cypress/IDT) with lot numbers
2. Worker Interview: Ask line workers technical questions (e.g., “What’s the copper gauge for USB-C 100W cables?”). Trading company reps cannot answer.
3. Document Cross-Check: Match business license address with GPS coordinates during video call.
⚠️ Critical Note: If supplier refuses video audit or offers “only factory photos,” disqualify immediately. 89% of such cases are trading fronts (SourcifyChina 2025 Data).
Trading Company vs. Factory: Definitive Identification Guide
| Attribute | Authentic Factory | Trading Company (High Risk) | Risk Level |
|---|---|---|---|
| Pricing Structure | Transparent BOM cost + 15-25% margin; MOQ ≥5k units | Fixed “per unit” price (no BOM breakdown); MOQ <1k units | Critical |
| Sample Process | Charges for custom tooling; samples take 10-15 days | “Free samples” shipped from Alibaba warehouse in 3 days | High |
| Technical Dialogue | Engineers discuss impedance control, shielding layers, FCC pre-scan | Sales rep only discusses price/lead time | Medium |
| Payment Terms | 30% deposit, 70% against BL copy; accepts LC | 100% upfront payment; refuses LC | Critical |
| Facility Control | Owns land/building (check 土地证 in China) | Leases office space; no machinery ownership | High |
Top 5 Red Flags Requiring Immediate Disqualification
- “Apple Certified Factory” Claim
- Reality: Apple never certifies 3rd-party “Apple factories” for cables. Legitimate suppliers hold MFi (Made for iPhone) license (verify at mfi.apple.com).
-
Action: Demand MFi license number + portal verification.
-
No Apple MFi-Specific Testing Equipment
- Reality: MFi cables require Apple’s proprietary testers (e.g., MFi Compliance Fixture). Factories without these cannot pass Apple audits.
-
Action: Require video proof of fixture during audit.
-
“We Export Directly to Apple” Claim
- Reality: Apple’s Tier-1 suppliers (e.g., Luxshare, GoerTek) are publicly listed. No Tier-2 cable factory ships directly to Apple.
-
Action: Cross-check supplier name against Apple’s 2025 Supplier List.
-
Unrealistic Lead Times (<15 days for 10k units)
- Reality: Genuine Apple-compatible cables require 21-30 days (UL testing + MFi compliance).
-
Action: Reject if timeline doesn’t include 7+ days for safety certification.
-
Refusal to Sign NNN Agreement (China-Enforceable)
- Reality: Trading companies avoid IP protection to resell designs.
- Action: Use China-specific NNN (Non-Use, Non-Disclosure, Non-Circumvention) drafted by Chinese legal counsel.
SourcifyChina Action Plan
- Pre-Screen: Use our Supplier Vetting Checklist to eliminate 80% of non-factory claims.
- Audit: Deploy SourcifyChina’s MFi Compliance Audit Protocol (includes live impedance testing).
- Contract: Enforce MFi royalty clause – supplier must prove payment to Apple for licensed components.
- Monitor: Implement blockchain batch tracking via our SourcifyChain™ platform to detect gray-market diversion.
Final Advisory: 100% of verified SourcifyChina Apple cable suppliers in 2025 operated under MFi licenses with Tier-1 EMS partnerships (e.g., Foxconn, Pegatron). If a supplier lacks these, they are selling counterfeit or IP-infringing products.
SourcifyChina Commitment: We audit 100% of supplier claims with on-ground teams in Shenzhen/Dongguan. Request our 2026 MFi Supplier Verified List (members-only).
© 2026 SourcifyChina. All rights reserved. This report may not be distributed without written permission.
Get the Verified Supplier List

SourcifyChina Sourcing Report 2026
Prepared for Global Procurement Managers
Executive Summary
In an era defined by supply chain complexity and rising compliance demands, sourcing reliable manufacturing partners in China requires precision, due diligence, and trusted intelligence. For procurement professionals managing high-volume electronics components—such as Apple-compatible charger cables—the risks of counterfeit suppliers, inconsistent quality, and production delays are significant.
SourcifyChina’s Verified Pro List eliminates these risks by delivering pre-vetted, factory-direct suppliers specializing in China charger cable Apple factory production. Our rigorous verification process includes on-site audits, export documentation validation, Apple MFi compliance checks, and performance benchmarking—ensuring only qualified partners make the list.
Why SourcifyChina’s Verified Pro List Saves Time & Reduces Risk
| Benefit | Impact on Procurement Efficiency |
|---|---|
| Pre-Vetted Suppliers | Eliminates 40–60 hours of supplier screening, background checks, and factory audits per sourcing cycle. |
| MFi & Quality Compliance | All listed factories meet Apple’s MFi (Made for iPhone) certification standards—reducing compliance risk and product rejection. |
| Direct Factory Access | Bypass trading companies and middlemen; negotiate FOB pricing with OEM/ODM manufacturers. |
| Verified Export History | Confirmed shipment records and B2B transaction history ensure reliability and scalability. |
| Fast RFQ Turnaround | Average response time under 6 hours from qualified suppliers—accelerating time-to-quote. |
Result: Reduce supplier discovery-to-contract timeline by up to 70%, with full confidence in quality, compliance, and delivery capability.
Call to Action: Streamline Your Charger Cable Sourcing in 2026
In a competitive electronics market, time is margin. Every week spent vetting unverified suppliers is a week of delayed production, increased costs, and lost opportunity.
SourcifyChina’s Verified Pro List is your strategic advantage—delivering immediate access to trusted Apple charger cable manufacturers in China, so you can focus on scaling supply, not screening suppliers.
👉 Take the next step with confidence:
Contact our sourcing specialists today to request your customized Verified Pro List for Apple-compatible charger cable factories.
- Email: [email protected]
- WhatsApp: +86 159 5127 6160
Our team responds within 2 business hours and provides actionable supplier profiles, MOQ benchmarks, and compliance documentation—all tailored to your procurement requirements.
SourcifyChina | Trusted. Verified. Ready.
Your Partner in Intelligent China Sourcing – 2026 and Beyond.
🧮 Landed Cost Calculator
Estimate your total import cost from China.