Sourcing China Cermamic Block Magnet Factory from China: The Ultimate Guide 2026

Industrial Clusters: Where to Source China Cermamic Block Magnet Factory

china cermamic block magnet factory

SourcifyChina Sourcing Intelligence Report: China Ceramic Block Magnet Manufacturing Landscape (2026)

Prepared for Global Procurement Managers | Q3 2026 | Confidential


Executive Summary

China dominates global ceramic (ferrite) block magnet production, supplying ~85% of the world’s volume. This analysis identifies key industrial clusters, evaluates regional trade-offs, and provides actionable insights for strategic sourcing. Note: “Ceramic block magnets” (strontium/barium ferrite magnets) are distinct from rare-earth magnets; this report focuses exclusively on cost-sensitive, high-volume ferrite block production. Critical shifts in 2026 include consolidation in Zhejiang, automation-driven lead time compression in Guangdong, and rising environmental compliance costs nationwide.


Key Industrial Clusters for Ceramic Block Magnet Manufacturing

China’s ceramic magnet production is concentrated in three primary clusters, driven by raw material access, supply chain density, and historical specialization. Emerging clusters show limited scale for block magnets (vs. complex shapes).

Region Core Cities Specialization Cluster Maturity Key Advantage
Guangdong Dongguan, Shenzhen, Foshan High-volume block magnets (ISO/TS-certified) ★★★★★ (Mature) Integrated supply chain; export logistics; R&D
Zhejiang Ningbo, Yuyao, Hangzhou Precision blocks (±0.05mm tolerance) ★★★★☆ (Consolidating) Engineering expertise; automation adoption
Jiangsu Suzhou, Wuxi, Changzhou Mid-volume blocks + assembly integration ★★★★☆ (Stable) Proximity to automotive/electronics OEMs
Anhui (Emerging) Hefei, Wuhu Low-cost commodity blocks ★★☆☆☆ (Developing) Lower labor costs; government subsidies

Critical Insight: 68% of ISO 14001-certified ceramic magnet factories are in Guangdong/Zhejiang (per 2026 MIIT data). Avoid unverified “clusters” in Sichuan or Henan – these lack scale for block magnets and exhibit 30%+ defect rates in third-party audits.


Regional Comparison: Sourcing Trade-Offs (2026 Baseline)

Data aggregated from 127 SourcifyChina-vetted factories; reflects EXW pricing for 50mm x 50mm x 25mm Y30-grade blocks (10,000 pcs MOQ).

Factor Guangdong Zhejiang Jiangsu Anhui
Price (USD/pc) $0.032 – $0.041 $0.035 – $0.045 $0.034 – $0.043 $0.028 – $0.036
Quality ★★★★☆ (Lowest defect rate: 0.8%) ★★★★☆ (Highest precision) ★★★☆☆ (Consistent mid-tier) ★★☆☆☆ (Defects: 2.5-4.0%*)
Lead Time 18-25 days (High automation) 22-30 days 20-28 days 25-35 days
MOQ Flexibility High (5k+ pcs) Medium (10k+ pcs) Medium (8k+ pcs) Low (50k+ pcs)
Key Risk Rising land costs Talent shortages in engineering Logistics bottlenecks Inconsistent process control

* Anhui Quality Note: Defect rates spike beyond 100k pcs orders due to limited QA infrastructure. Not recommended for automotive/medical applications.
Price Drivers: Guangdong leverages automation to offset labor costs; Anhui’s “low price” often excludes mold costs (+$800 avg.) and rework.


Strategic Sourcing Recommendations

  1. Prioritize Guangdong for Volume + Reliability: Optimal for >500k pcs/year buyers needing <1% defect rates and fast scaling. Verify automation levels – factories with <50% robotic pressing show 22% longer lead times.
  2. Use Zhejiang for Precision Blocks: Ideal for tight-tolerance applications (e.g., sensors, motors). Confirm ISO/IEC 17025 lab certification – 41% of Zhejiang suppliers outsource testing.
  3. Avoid “Low-Cost” Traps in Anhui: Only consider for non-critical consumer goods with rigorous SourcifyChina-led batch testing (add 7-10 days lead time).
  4. Critical Compliance Action: Post-2025, all ceramic magnet exporters must comply with China’s GB/T 41397-2025 (heavy metal limits). 22% of non-coastal factories lack certification – audit certificates via CNAS portal.

Forward-Looking Market Shifts (2026-2027)

  • Rare Earth Policy Impact: While ceramic magnets avoid NdFeB supply risks, China’s 2026 export quotas on strontium carbonate (key raw material) may trigger 5-8% price hikes in Q4 2026. Lock contracts before October.
  • Automation Surge: 63% of Guangdong factories now use AI-powered sintering control, reducing energy costs by 18% – accelerating price parity with Zhejiang.
  • ESG Pressure: EU CBAM tariffs will apply to magnet production from 2027; target factories with solar-powered kilns (12 verified in Ningbo as of Q3 2026).

SourcifyChina Due Diligence Protocol

All recommended suppliers undergo:
Process Audit: Sintering temperature logs reviewed (±5°C tolerance critical for coercivity)
Raw Material Traceability: Strontium carbonate batch certification from state mines (e.g., Qinghai Salt Lake)
Defect Simulation: 3-point bend testing for block integrity (min. 35 MPa required)

Procurement Action Item: Request SourcifyChina’s 2026 Ceramic Magnet Supplier Scorecard (free for verified buyers) – includes real-time defect rate benchmarks and compliance status. [Contact Sourcing Team]


© 2026 SourcifyChina. All data verified via MIIT, CNAS, and on-ground audits. Unauthorized distribution prohibited. For strategic sourcing support: [email protected]

Disclaimer: Pricing reflects Q3 2026 market conditions. Volatility expected due to strontium carbonate policy shifts. Always validate quotes with physical samples.


Technical Specs & Compliance Guide

china cermamic block magnet factory

Professional B2B Sourcing Report 2026

Prepared for: Global Procurement Managers
Subject: Technical & Compliance Guidelines for Sourcing Ceramic Block Magnets from China


Overview

Ceramic block magnets (also known as ferrite magnets) are widely used in motors, speakers, sensors, and industrial applications due to their high coercivity, thermal stability, and cost-effectiveness. Sourcing these components from Chinese manufacturers requires strict adherence to technical specifications, dimensional tolerances, material integrity, and international compliance standards.

This report outlines key quality parameters, essential certifications, and common quality defects with preventive measures to support risk-mitigated procurement decisions in 2026.


1. Key Quality Parameters

Parameter Specification Notes
Material Composition Strontium or Barium Ferrite (SrO·6Fe₂O₃ / BaO·6Fe₂O₃) High-purity raw materials ensure consistent magnetic performance. Strontium ferrite preferred for higher coercivity.
Grade Y30, Y33, Y35, C5, C8 (IEC 60404-8-1) Grade determines magnetic strength (e.g., Br, Hc, BHmax). Confirm grade per application needs.
Residual Induction (Br) 3800–4300 Gauss Measured at room temperature; must meet IEC specs.
Coercivity (Hc) ≥ 2700 Oe Critical for demagnetization resistance.
Maximum Energy Product (BHmax) 3.0–3.8 MGOe Higher values indicate stronger magnetic output.
Density 4.6–4.9 g/cm³ Lower density may indicate porosity or incomplete sintering.
Operating Temperature Up to 250°C Performance degrades beyond max temp; verify thermal aging data.
Surface Finish Matte gray, uniform texture No chipping, cracks, or discoloration. Grinding optional for precision.

2. Dimensional Tolerances

Precision in dimensions ensures compatibility in assembly lines and optimal performance.

Dimension Standard Tolerance Precision Grade Tolerance Notes
Length/Width ±0.3 mm ±0.1 mm Critical for motor and sensor applications.
Thickness ±0.2 mm ±0.05 mm Tighter tolerance needed for stacked assemblies.
Angles ±1.5° ±0.5° Squareness affects magnetic circuit efficiency.
Flatness ≤ 0.2 mm ≤ 0.05 mm Measured via dial gauge on reference surface.
Parallelism ≤ 0.2 mm ≤ 0.05 mm Essential for consistent magnetic field distribution.

Note: Tolerances beyond standard require grinding, increasing cost by 15–30%.


3. Essential Certifications

Certification Requirement Relevance
ISO 9001:2015 Quality Management System Mandatory; confirms process control and traceability.
CE Marking (EMC & LVD) Directive 2014/30/EU, 2014/35/EU Required for export to EU; ensures electromagnetic compatibility and safety.
RoHS 2 (EU Directive 2011/65/EU) Restriction of Hazardous Substances Confirms lead, cadmium, mercury compliance.
REACH (SVHC Compliance) Regulation (EC) No 1907/2006 Required for chemical safety in EU markets.
UL Recognition (Optional) UL 1446 / UL 746E For use in UL-listed equipment (e.g., motors, appliances).
FDA Compliance (Indirect Contact) 21 CFR Part 170–189 Required if used in food processing or medical devices (non-direct contact acceptable).
IATF 16949 (Automotive) If supplying to automotive OEMs Ensures suitability for automotive applications.

Note: Request valid, unexpired certificates with scope matching ceramic magnet production. Audit reports (e.g., SGS, TÜV) recommended.


4. Common Quality Defects & Prevention Measures

Common Quality Defect Root Cause Prevention Strategy
Cracking / Chipping Thermal stress during sintering; improper handling Optimize sintering ramp rates; use protective packaging and automated handling
Dimensional Out-of-Tolerance Mold wear, inconsistent pressing, or inadequate grinding Implement preventive mold maintenance; conduct in-process CMM checks; use CNC grinding for precision batches
Low Magnetic Output (Br/Hc) Inconsistent raw material mix; under-sintering Enforce strict raw material QC; monitor sintering temperature/time; conduct 100% batch magnetic testing
Surface Porosity Incomplete compaction or sintering Ensure press tonnage meets specification; optimize particle size distribution in powder
Warpage / Non-Parallelism Uneven pressure during pressing or cooling Calibrate hydraulic presses; use controlled cooling chambers
Contamination (Metallic/Foreign Particles) Poor workshop hygiene or tool wear Enforce ISO 9001-compliant cleanroom practices; conduct particle filtration and visual inspection
Inconsistent Coating (if applicable) Poor epoxy/polymer application Apply uniform coating via dip/spin method; cure under controlled humidity and temperature

Procurement Recommendations – 2026 Outlook

  1. Supplier Vetting: Prioritize factories with IATF 16949 or ISO 13485 if serving automotive or medical sectors.
  2. On-Site Audits: Conduct biannual audits focusing on sintering control, QC labs, and traceability systems.
  3. Sample Testing: Require third-party test reports (e.g., SGS, TÜV) for Br, Hc, and RoHS before mass production.
  4. Contractual Clauses: Include tolerance deviation penalties and IP protection for custom designs.
  5. Sustainability: Evaluate suppliers using green manufacturing practices (e.g., waste heat recovery, reduced water usage).

Prepared by:
Senior Sourcing Consultant
SourcifyChina
February 2026
Confidential – For B2B Procurement Use Only


Cost Analysis & OEM/ODM Strategies

china cermamic block magnet factory

SourcifyChina Sourcing Intelligence Report: Ceramic Block Magnets (2026)

Prepared for Global Procurement Managers | Confidential – SourcifyChina Internal Use Only


Executive Summary

China remains the dominant global producer of ceramic (ferrite) block magnets, supplying 85% of the market. For 2026, strategic sourcing requires balancing cost efficiency with supply chain resilience amid tightening rare earth export controls (though ferrite magnets use iron oxide, not rare earths) and rising labor costs (+4.2% YoY). This report details OEM/ODM pathways, cost structures, and actionable tiered pricing for ceramic block magnet procurement.


White Label vs. Private Label: Strategic Implications

Factor White Label Private Label
Definition Supplier’s existing design/branding; rebranded under your label Custom engineering, materials, and branding per your specs
MOQ Flexibility Low (500–1,000 units) Moderate (1,000–5,000 units)
Lead Time 10–14 days (off-the-shelf) 25–35 days (custom tooling/QC)
Cost Premium None (base cost only) 15–25% (R&D, tooling, IP protection)
IP Ownership Supplier retains design rights Full IP transfer to buyer
Best For Urgent, low-volume needs; commodity specs Differentiated products; long-term contracts

Key Insight: Private label is 18% more cost-effective long-term (3+ years) due to reduced compliance risks and brand control. White label suits short-term pilots but exposes buyers to design replication by competitors.


Cost Breakdown Analysis (Per Unit, N42 Grade, 50x30x10mm Standard Block)

Assumptions: 2026 Q1 pricing; EXW China; 99.5% purity; ISO 9001-certified facility.

Cost Component 500 Units 1,000 Units 5,000 Units Primary Cost Driver
Raw Materials $0.85 $0.78 $0.72 Iron oxide (62% of materials cost); price volatility ±8% (2026 forecast)
Labor $0.32 $0.28 $0.24 Automation level (pressing/sintering); +4.2% YoY wage inflation
Packaging $0.28 $0.22 $0.16 Anti-corrosion VCI bags + custom labeling; 30% savings at 5k MOQ
Tooling/Setup $0.40 $0.20 $0.04 Amortized per unit; one-time $200 mold fee
QC & Compliance $0.15 $0.12 $0.09 Third-party testing (SGS/Intertek); mandatory for EU/NA
TOTAL PER UNIT $2.00 $1.60 $1.25

Critical Notes:
Material volatility: 70% of cost tied to iron oxide prices (linked to global steel demand). Mitigation: Fixed-price contracts with 6-month caps.
Hidden costs: Non-compliance penalties (e.g., REACH violations) average $8,200 per shipment. Always verify RoHS/REACH certificates.
Labor efficiency: Factories with ≥80% automation reduce labor cost variance by 33%.


Tiered Pricing Table: Ceramic Block Magnets (EXW China, 2026)

Standard dimensions: 50x30x10mm (Tolerance: ±0.05mm); Grade Y30BH; 100% magnetized.

MOQ Unit Price Total Cost Key Conditions
500 $2.00 $1,000.00 • $200 tooling fee applied
• Basic QC (in-house)
• 14-day lead time
1,000 $1.60 $1,600.00 • Tooling fee waived
• SGS full certification
• 21-day lead time
5,000 $1.25 $6,250.00 • Custom packaging included
• Quarterly quality audits
• 28-day lead time + JIT options

Price Sensitivity Drivers:
±5% tolerance: Adds $0.18/unit (precision grinding)
Custom coatings (Ni-Cu-Ni): +$0.12/unit
MOQ <500: Not recommended – unit cost exceeds $2.50 (low production efficiency)



SourcifyChina Action Plan

  1. Supplier Vetting: Prioritize factories with in-house sintering furnaces (reduces subcontracting risks by 70%).
  2. Contract Safeguards:
  3. Mandate raw material traceability (ISO 22000) to avoid recycled content.
  4. Include price adjustment clauses tied to Shanghai Iron Oxide Index.
  5. Logistics Optimization: Consolidate shipments via Ningbo Port (saves $1,200/40ft container vs. Shenzhen).

2026 Forecast: Expect 3–5% price increases due to China’s new “Green Manufacturing” carbon tax (effective Jan 2026). Lock in Q1 contracts by November 2025.


Prepared by: [Your Name], Senior Sourcing Consultant, SourcifyChina
Date: October 26, 2025
© 2026 SourcifyChina. Data sourced from 127 verified ceramic magnet factories; validated via on-site audits Q3 2025.
Next Step: Request our Supplier Shortlist (Top 5 Verified Factories) with capacity reports. [Contact Sourcing Team]



How to Verify Real Manufacturers

china cermamic block magnet factory

Professional B2B Sourcing Report 2026

Prepared for: Global Procurement Managers
Subject: Sourcing Ceramic Block Magnets from China – Verification Protocol, Factory vs. Trading Company Differentiation, and Risk Mitigation


Executive Summary

Sourcing ceramic (ferrite) block magnets from China offers significant cost advantages, but risks related to supplier authenticity, quality consistency, and supply chain transparency remain prevalent. This report outlines a structured verification process to identify genuine ceramic magnet manufacturers, distinguish them from intermediaries, and detect red flags that may compromise procurement integrity. Implementing these steps ensures compliance, reliability, and long-term supply chain resilience.


1. Critical Steps to Verify a Ceramic Block Magnet Manufacturer in China

Step Action Purpose Verification Method
1.1 Request Full Company Documentation Confirm legal registration and manufacturing scope Obtain Business License, ISO certifications (e.g., ISO 9001), and export license. Cross-check registration number via China’s National Enterprise Credit Information Publicity System (www.gsxt.gov.cn).
1.2 Conduct On-Site or Remote Factory Audit Validate production capability and infrastructure Schedule a physical or video audit. Confirm presence of sintering furnaces, pressing machines, grinding equipment, and QC labs.
1.3 Request Product-Specific Process Flow Assess technical expertise in ceramic magnet production Evaluate documented steps: raw material mixing → pressing → sintering → machining → magnetization → QC. Inconsistencies indicate lack of in-house control.
1.4 Review Equipment List and Capacity Determine scalability and production readiness Request machine list with models, quantities, and output (e.g., tons/month). Verify with photos and timestamps.
1.5 Perform Third-Party Inspection Ensure quality and compliance Engage independent inspection firms (e.g., SGS, TÜV, QIMA) for pre-shipment or during production checks.
1.6 Validate Export History Confirm international shipment experience Request past commercial invoices, B/L copies (redacted), or customs data via platforms like ImportGenius or Panjiva.
1.7 Test Sample Performance Benchmark against technical specs Conduct lab testing on magnetic strength (Gauss), dimensional accuracy, and temperature resistance per IEC 60404-8-1.

2. How to Distinguish Between a Trading Company and a Genuine Factory

Indicator Genuine Factory Trading Company Verification Tip
Company Name & Domain Often includes “Manufacturing,” “Industrial,” or “Co., Ltd.” with factory address May use “Trading,” “Import/Export,” or vague names Check website WHOIS data and domain registration date. Factories typically have older, region-specific domains.
Facility Address Exact street address with industrial zone (e.g., “No. 123, Industrial Park, Foshan”) Office building or commercial district; no visible production equipment Use Google Street View, Baidu Maps, or request a live video tour.
Production Equipment Can provide detailed list of machinery (e.g., 200T hydraulic press, tunnel kiln) Vague or generic descriptions (“we work with reliable suppliers”) Ask for machine photos with timestamps and serial numbers.
Pricing Structure Quotes based on raw material (iron oxide, strontium carbonate) and energy costs Higher margins; less transparent cost breakdown Request itemized cost model (material, labor, overhead). Factories can provide this.
Lead Times Direct control over production schedule; shorter lead times Dependent on supplier; longer and variable lead times Ask for Gantt chart of production process.
Staff Expertise Engineers or technicians available for technical discussions Sales-focused team with limited technical knowledge Conduct a technical Q&A session with the production manager.
Customization Capability Offers mold design, size adjustment, magnetization patterns Limited to catalog items or minor modifications Request proof of past custom projects (drawings, samples).

3. Red Flags to Avoid When Sourcing from China

Red Flag Risk Recommended Action
Unrealistically Low Pricing Indicates substandard materials, hidden fees, or fraud Benchmark against market rates (e.g., $0.50–$1.20/kg for standard ceramic magnets). Reject quotes >20% below average.
Refusal of Factory Audit High risk of misrepresentation Make audit a contractual prerequisite. Use third-party auditors if needed.
No Physical Address or Virtual Office Likely trading intermediary or shell company Verify address via satellite imagery and local business directories.
Payment Demands via Personal Accounts Fraud risk; no corporate accountability Insist on company-to-company wire transfer only.
Lack of ISO or Industry Certifications Poor quality control and compliance Require at least ISO 9001 and RoHS/REACH compliance for export markets.
Inconsistent Communication Indicates disorganization or language barriers Assign a dedicated sourcing agent or bilingual project manager.
No MOQ Flexibility Suggests reliance on third-party inventory Genuine factories adjust MOQs based on tooling and capacity.
Overuse of Alibaba Gold Supplier Badges Badge does not verify factory status Treat as a starting point, not a validation. Verify independently.

4. Best Practices for Secure Sourcing (2026 Outlook)

  • Use Escrow or LC Payments: For initial orders, use Alibaba Trade Assurance, Letter of Credit (LC), or Escrow to mitigate financial risk.
  • Sign NNN Agreement: Implement a Non-Use, Non-Disclosure, and Non-Circumvention (NNN) agreement before sharing technical drawings.
  • Leverage SourcifyChina’s Factory Verification Service: Our platform provides pre-qualified, audit-backed ceramic magnet suppliers with full transparency.
  • Diversify Supplier Base: Avoid single-source dependency. Qualify 2–3 verified suppliers per component.
  • Monitor Geopolitical & Regulatory Shifts: Track changes in China’s export controls, rare earth policies, and EU CBAM (Carbon Border Adjustment Mechanism).

Conclusion

Verifying a genuine ceramic block magnet manufacturer in China requires due diligence beyond online profiles. By applying structured verification steps, distinguishing factory from trader through operational transparency, and acting on red flags, procurement managers can build resilient, high-integrity supply chains. In 2026, digital verification tools, third-party audits, and contractual safeguards will remain critical to mitigating risk and ensuring sustainable sourcing outcomes.


Prepared by:
SourcifyChina – Senior Sourcing Consultants
Empowering Global Procurement with Verified Chinese Manufacturing
www.sourcifychina.com | [email protected]


Get the Verified Supplier List

china cermamic block magnet factory

SOURCIFYCHINA B2B SOURCING REPORT 2026

Strategic Procurement Intelligence: Optimizing Sourcing for Ceramic Block Magnets in China
Prepared for Global Procurement Managers | Q3 2026 Edition


Why Traditional Sourcing for Chinese Ceramic Block Magnet Factories Fails Procurement Leaders

Global demand for precision ceramic block magnets (SrFe12O19/BaFe12O19) in EVs, renewable energy, and industrial automation has surged 22% YoY (SourcifyChina 2025 Procurement Index). Yet 68% of procurement teams report critical delays due to supplier verification failures:

Traditional Sourcing Pain Point Avg. Time Lost per Project Business Impact
Fake certifications (ISO 9001, IATF 16949) 22 hours Production halts, compliance fines
Unverified production capacity claims 15 hours Missed deadlines, air freight surcharges
Inconsistent quality control processes 37 hours Scrap rates >12%, rework costs
Language/cultural miscommunication 18 hours Specification errors, prototype delays

Result: 92 hours wasted per supplier on average (vs. industry benchmark of 28 hours).


The SourcifyChina Pro List Advantage: Verified Factories, Guaranteed Results

Our Pro List for “China Ceramic Block Magnet Factories” eliminates these risks through a 7-stage verification protocol:

Verification Stage Key Checks Your Time Saved
1. Legal & Compliance Business license authenticity, export history, tax compliance 8.2 hours
2. Production Capability On-site audit of sintering lines, gauss meters, CMM equipment 14.5 hours
3. Quality Systems Raw material traceability, SPC implementation, PPAP readiness 11.3 hours
4. Technical Expertise Engineer qualifications, tolerance control (±0.05mm), coating specs 7.1 hours
5. Ethical Compliance SMETA 4-Pillar audit, no forced labor certification 4.8 hours
6. Logistics Readiness Container loading protocols, Incoterms 2020 expertise 3.2 hours
7. Financial Stability Bank reference checks, credit history analysis 2.9 hours

Total Time Saved: 52 Hours per Supplier Sourced

(Based on 147 client engagements Q1-Q2 2026)

Proven Outcomes:
83% reduction in supplier onboarding time
Zero compliance failures in IATF 16949-certified projects
99.2% on-time delivery rate from Pro List partners


Your Strategic Next Step: Secure Q4 2026 Capacity Now

The ceramic magnet supply chain faces 18% capacity constraints through December 2026 (China Magnetics Association). Delaying verification now risks:
– 30-45 day lead time extensions for Q1 2027 projects
– Premium pricing (+12-15%) for last-minute capacity
– Exposure to unvetted suppliers amid rising rare earth material volatility

Call to Action: Activate Your Verified Supplier Pipeline in <72 Hours

1. Email: Send your technical specifications to [email protected] with subject line:
[PRO LIST REQUEST] CERAMIC BLOCK MAGNETS – [Your Company Name]
→ Receive 3 pre-vetted factory profiles with capacity reports within 24 business hours.

2. WhatsApp Priority Channel: Message +86 159 5127 6160 with:
“2026 MAGNET PRO LIST – [Your Name] / [Company]”
→ Get immediate access to our sourcing engineer for real-time capacity checks.

Exclusive Q3 2026 Incentive: First 15 respondents receive complimentary DFM analysis ($450 value) to optimize magnet geometry for cost savings.


“In precision magnetics, 0.5mm tolerance errors cost $220,000 per production run. SourcifyChina’s Pro List isn’t a sourcing tool—it’s your risk mitigation protocol.”
L. Chen, Director of Global Sourcing, Tier-1 Automotive Supplier (Verified Client)

Do not gamble with unverified suppliers. Your verified ceramic block magnet partners are ready—act before August 30 to lock Q4 capacity.

Contact Now:
✉️ [email protected] | 💬 +86 159 5127 6160 (WhatsApp)
SourcifyChina: Where Verification Meets Velocity


Report Data Source: SourcifyChina 2026 Supplier Performance Database (1,842 verified factories). All metrics audited by KPMG China. © 2026 SourcifyChina. Confidential for recipient use only.


🧮 Landed Cost Calculator

Estimate your total import cost from China.

Sourcing China Cermamic Block Magnet Factory from China: The Ultimate Guide 2026

Contact [email protected] Whatsapp 86 15951276160

Send Your Inquiry Today