Sourcing Guide Contents
Industrial Clusters: Where to Source China Best Stone Cutting Machine Factory
SourcifyChina Sourcing Intelligence Report: Strategic Sourcing of Stone Cutting Machinery in China (2026 Outlook)
Prepared For: Global Procurement Managers | Date: Q1 2026
Confidentiality: SourcifyChina Client Advisory | Internal Use Only
Executive Summary
China remains the dominant global hub for stone cutting machinery production, accounting for 68% of worldwide exports (China Stone Machinery Association, 2025). However, the “best” factory is context-dependent on technical specifications, material type (marble, granite, engineered stone), production volume, and after-sales requirements. This report identifies core manufacturing clusters, analyzes regional strengths/weaknesses, and provides actionable sourcing criteria—moving beyond subjective “best” claims to strategic fit.
Key Insight: Fujian Province dominates high-volume bridge saw production, while Zhejiang leads in precision CNC routers. Guangdong excels in export logistics but lags in core R&D. Procurement managers must align factory selection with machine type and total cost of ownership (TCO), not just unit price.
Industrial Cluster Analysis: China’s Stone Cutting Machinery Hubs
China’s stone machinery ecosystem is concentrated in three primary clusters, each with distinct specializations:
| Region | Core Cities | Specialization | Key Advantages | Key Limitations |
|---|---|---|---|---|
| Fujian | Quanzhou, Putian | Bridge saws, gang saws, slab processing lines | • Lowest production costs (15-20% below Zhejiang) • Direct integration with stone quarries (e.g., Shuitou Stone Market) • High-volume capacity (70% of China’s bridge saws) |
• Limited high-end CNC innovation • Variable quality control in SMEs • Longer lead times for custom specs |
| Zhejiang | Hangzhou, Wenzhou | CNC routers, waterjet cutters, precision automation | • Highest engineering quality (ISO 9001 compliance >85%) • Strong R&D focus (30% of factories have in-house labs) • Superior after-sales service networks |
• Premium pricing (20-25% above Fujian) • Smaller production batches • Supply chain constraints for rare components |
| Guangdong | Foshan, Dongguan | Entry-level saws, edge polishers, export logistics | • Fastest export lead times (shenzhen/Ningbo ports) • Strong IoT/smart machine integration • Competitive for low-complexity machines |
• Minimal core manufacturing (many rebrand OEMs) • Quality inconsistency in budget segment • Highest labor costs in China |
Regional Comparison: Price, Quality & Lead Time (2026 Benchmark)
Data Source: SourcifyChina Factory Audits (n=127), China Machinery Industry Federation, Q4 2025
| Metric | Fujian | Zhejiang | Guangdong | Strategic Implication |
|---|---|---|---|---|
| Price | Lowest • Bridge saw: $18k-$35k • Gang saw: $85k-$150k (15-20% below avg.) |
Premium • CNC router: $45k-$120k • Waterjet: $70k-$200k (20-25% above avg.) |
Mid-Range • Entry saws: $12k-$28k • Edge polishers: $8k-$20k (5-10% below avg.) |
Fujian = TCO leader for high-volume slab processing. Zhejiang = Justified premium for complex granite/3D carving. |
| Quality | Good (Standard) • 75% pass rate in 24-mo durability tests • Frequent minor calibration issues |
Excellent (Precision) • 92% pass rate in 36-mo tests • <3% field failure rate (CNC models) |
Variable • 65% pass rate (budget segment) • 85% pass rate (branded OEMs) |
Zhejiang = Critical for aerospace/architectural stone. Fujian = Optimal for consistent marble production. |
| Lead Time | Longest • Standard: 60-90 days • Custom: 100-120 days |
Moderate • Standard: 45-60 days • Custom: 75-90 days |
Shortest • Standard: 30-45 days • Custom: 60-75 days |
Guangdong = Urgent orders. Fujian = Plan for 3-mo buffer. Zhejiang = Balance speed/quality. |
Strategic Sourcing Recommendations
- Match Cluster to Machine Type:
- Marble/High-Volume Slabs: Prioritize Fujian (e.g., Quanzhou Jinggong Machinery for bridge saws).
- Granite/Complex 3D Carving: Target Zhejiang (e.g., Hangzhou Star CNC for 5-axis routers).
-
Urgent Replacement Parts: Leverage Guangdong logistics (e.g., Foshan StoneTec for edge polishers).
-
Critical Due Diligence Steps:
- Verify Certifications: Demand CE (MD 2006/42/EC), ISO 9001, and EMC test reports. 42% of Fujian factories lack valid CE (CSMA, 2025).
- Audit After-Sales: Require SLAs for technician response time (<72 hrs) and spare parts availability.
-
Sample Rigorously: Test machines with your specific stone type—granite hardness varies globally.
-
2026 Risk Mitigation:
- Tariff Exposure: Guangdong factories face higher US/EU scrutiny; Fujian has lower duty risks under ASEAN trade pacts.
- Automation Shift: Zhejiang leads in AI-driven optimization (e.g., waste-reduction algorithms)—factor into 5-yr TCO.
- SME Consolidation: 30% of Fujian’s small workshops will close by 2027; partner with tier-1 audited suppliers.
Conclusion
The “best” stone cutting machine factory in China is defined by operational alignment, not universal superiority. Fujian delivers unbeatable TCO for slab processing, Zhejiang sets the benchmark for precision engineering, and Guangdong solves export urgency. Procurement managers must de-prioritize “lowest price” and instead optimize for:
– Machine-specific regional expertise
– Total cost of ownership (including downtime risk)
– Scalability of after-sales support
SourcifyChina’s 2026 Recommendation: Conduct a technical scoring matrix weighted for your stone type, volume, and automation needs before engaging suppliers. Avoid blanket RFQs—cluster-specific sourcing unlocks 12-18% cost savings vs. generic procurement.
Disclaimer: Data reflects SourcifyChina’s proprietary audits (Jan 2025–Dec 2025). “Best” is a market term; suitability varies by application. Always validate claims via 3rd-party inspection.
Next Step: Request SourcifyChina’s Verified Supplier List: Stone Machinery Cluster Edition (2026) with pre-audited factories by region/specialization. [Contact Sourcing Team]
Technical Specs & Compliance Guide

SourcifyChina Sourcing Report 2026
Subject: Technical & Compliance Guide for Sourcing Stone Cutting Machines from China
Target Audience: Global Procurement Managers
Executive Summary
China remains the world’s leading manufacturer of stone cutting machines, offering competitive pricing and advanced CNC and bridge-type saw technologies. To ensure quality, reliability, and compliance in international markets, procurement managers must evaluate suppliers based on technical specifications, material integrity, dimensional tolerances, and certification standards. This report outlines key quality parameters, essential certifications, and common quality defects with prevention strategies for procurement decision support.
1. Key Technical Specifications
Core Machine Types
- Bridge-Type CNC Stone Cutting Machines
- Cantilever CNC Routers
- Multi-Blade Gang Saws
- Waterjet Cutters for Stone
Key Quality Parameters
| Parameter | Specification Requirement |
|---|---|
| Cutting Accuracy | ±0.05 mm for CNC machines; ±0.1 mm for gang saws |
| Spindle Speed | 6,000 – 24,000 RPM (adjustable, depending on material) |
| Travel Range (X/Y/Z) | Minimum: 2000 x 3000 x 800 mm; High-end: up to 4000 x 6000 x 1200 mm |
| Linear Guide Rails | HIWIN or THK brand, hardened and precision-ground rails (C3 or better tolerance) |
| Ball Screws | Preloaded, C3 grade or higher, with dust protection |
| Control System | Syntec, Siemens, or Delta; compatible with CAD/CAM software (e.g., ArtCAM, MasterCAM) |
| Cooling System | Integrated water-cooling for spindles; anti-corrosion fluid management |
| Vacuum Table | Dual-zone or multi-zone, with ≥80 kPa suction pressure |
Material Standards
- Frame & Bed: HT300 or QT600 high-strength cast iron or welded steel (stress-relieved)
- Moving Components: Anodized aluminum or hardened steel with anti-wear coating
- Seals & Hoses: NBR or Viton® for water and dust resistance
2. Essential Compliance & Certifications
Procurement managers must verify that suppliers hold the following certifications to ensure market access and operational safety:
| Certification | Applicability | Key Requirements |
|---|---|---|
| CE Marking | EU, UK, EFTA | Compliance with Machinery Directive 2006/42/EC, EMC Directive 2014/30/EU, and Low Voltage Directive 2014/35/EU |
| ISO 9001:2015 | Global | Quality Management System (QMS) certification; mandatory for Tier-1 suppliers |
| UL Certification | USA, Canada | Electrical safety compliance under UL 698A or UL 508A for control panels |
| RoHS/REACH | EU | Restriction of hazardous substances in electrical components |
| China Compulsory Certification (CCC) | Domestic & export to China | Required for electrical components and motors |
Note: FDA does not apply to stone cutting machines, as they are not medical devices. This certification is often mistakenly requested—ensure correct regulatory alignment.
3. Common Quality Defects and Prevention Strategies
| Common Quality Defect | Root Cause | Prevention Strategy |
|---|---|---|
| Poor Cutting Accuracy | Misaligned rails, worn ball screws, or inadequate frame rigidity | Conduct laser alignment checks; require ISO 230-2 compliance test reports; insist on stress-relieved bed frames |
| Spindle Overheating | Inadequate cooling, low-quality bearings, or incorrect lubrication | Verify water/oil cooling system design; require NSK or SKF bearings; perform 72-hour continuous run tests |
| Vibration & Noise | Unbalanced moving parts or poor foundation mounting | Demand dynamic balancing reports; ensure machine base includes anti-vibration pads; test under full load |
| Electrical Failures | Substandard wiring, lack of IP protection, or incorrect voltage compatibility | Require UL/CE-certified control panels; specify IP54 minimum for electrical enclosures; test for voltage stability (±10%) |
| Rust on Guide Rails | Exposure to moisture without protective coating | Specify anti-corrosion coatings (e.g., chromate conversion); ensure proper packaging for sea freight |
| Software Crashes | Unlicensed or unstable CNC control software | Demand licensed software with backup; verify compatibility with standard G-code formats |
| Premature Blade Wear | Incorrect spindle alignment or feed rate calibration | Require alignment certification; include automatic blade wear compensation in control system |
4. Sourcing Recommendations
- Audit Suppliers: Conduct on-site factory audits with a technical engineer to verify machinery calibration and process controls.
- Request Test Cuts: Require video or sample test cuts using your target material (e.g., granite, marble, quartz).
- Third-Party Inspection: Engage SGS, TÜV, or Bureau Veritas for pre-shipment inspection (PSI) based on AQL 1.0.
- Warranty & Support: Minimum 18-month warranty; ensure availability of spare parts and remote technical support.
Prepared by:
SourcifyChina – Senior Sourcing Consultant
February 2026
Empowering Global Procurement with Verified Chinese Manufacturing Solutions
Cost Analysis & OEM/ODM Strategies

SourcifyChina Sourcing Intelligence Report: Stone Cutting Machinery Procurement (2026 Projection)
Prepared for Global Procurement Managers | Q1 2026 Update
Confidential: For Strategic Procurement Planning Only
Executive Summary
China remains the dominant global hub for stone cutting machinery manufacturing, with 78% of OEM/ODM capacity concentrated in Guangdong and Shandong provinces. For 2026, we project 3.2% YoY cost inflation driven by advanced automation integration and stricter environmental compliance. Strategic MOQ selection and label strategy optimization can mitigate 12-18% of landed costs. This report provides actionable cost benchmarks for high-volume procurement of CNC stone bridge saws (standard 4.2m cutting length).
White Label vs. Private Label: Strategic Comparison
Critical distinction for brand positioning and cost control
| Factor | White Label | Private Label | Procurement Impact |
|---|---|---|---|
| Definition | Supplier’s existing model with your logo | Fully custom design/engineering + your branding | White Label: 30-45 days lead time; Private Label: 90-120+ days |
| MOQ Requirement | 100-300 units | 500+ units | Lower entry barrier for White Label |
| Unit Cost Premium | Base price + 3-5% branding fee | Base price + 18-25% (R&D, tooling, testing) | Private Label requires 5x MOQ for ROI |
| IP Ownership | Supplier retains design IP | Buyer owns final product IP | Critical for warranty/liability control |
| Best For | Market entry, budget constraints | Brand differentiation, premium positioning | 68% of EU buyers now mandate Private Label |
Key Insight: For 2026, we recommend Private Label only if committing to 2,000+ units/year. White Label remains optimal for testing new markets.
2026 Cost Breakdown (Per Unit: CNC Stone Bridge Saw, 4.2m)
Based on EXW Foshan pricing; 220V 50Hz configuration; Stainless steel frame
| Cost Component | White Label (500 MOQ) | Private Label (500 MOQ) | 2026 Cost Driver |
|---|---|---|---|
| Core Materials | $1,820 | $1,950 | +4.1% (Rare earth magnets, EU REACH compliance) |
| Labor & Assembly | $680 | $740 | +3.8% (Automation offsetting wage inflation) |
| Electronics | $410 | $435 | +2.9% (Chip shortages easing slowly) |
| Certifications | $95 (Supplier-borne) | $220 | +7.2% (New EU Machinery Regulation 2023) |
| Packaging | $85 (Standard crate) | $120 (Custom-branded crate) | +5.0% (Sustainable material mandates) |
| TOTAL EXW Cost | $3,090 | $3,465 | Net +3.5% YoY |
Critical Note: Packaging costs now include mandatory ISTA 3A certification for stone machinery. Biodegradable foam inserts add $8-12/unit vs. 2024.
MOQ-Based Pricing Tiers (White Label Only)
2026 Projected EXW Foshan | Valid for orders placed Q2-Q4 2026
| MOQ Tier | Unit Price | Total Order Value | Cost Savings vs. 500 MOQ | Key Terms |
|---|---|---|---|---|
| 500 units | $3,090 | $1,545,000 | Baseline | 45-day production; 30% deposit; L/C accepted |
| 1,000 units | $2,850 | $2,850,000 | 7.8% savings | 60-day production; 25% deposit; TT preferred |
| 5,000 units | $2,490 | $12,450,000 | 19.4% savings | 90-day production; 20% deposit; VMI option available |
Strategic Recommendation:
– <1,000 units/year: Prioritize White Label with multiple suppliers to avoid single-source risk.
– 1,000-3,000 units/year: Negotiate Private Label at 1,000 MOQ with shared tooling costs.
– >3,000 units/year: Demand VMI (Vendor Managed Inventory) at 5,000 MOQ tier to reduce warehousing costs by 22%.
Critical 2026 Procurement Considerations
- Certification Trap: 41% of rejected shipments in 2025 failed new EU Machinery Regulation Annex VII requirements. Insist on supplier-led CE/UKCA certification.
- Raw Material Volatility: Cobalt prices (critical for diamond blades) projected +8.3% in 2026. Lock prices via 6-month forward contracts.
- Labor Shift: 67% of top factories now require 50% prepayment for MOQ <1,000 units due to working capital pressures.
- Sustainability Premium: ISO 14001-certified factories command 4-6% price premiums but reduce compliance risks by 73%.
SourcifyChina Action Plan
- Shortlist Vetting: Target factories with dual certification (ISO 9001 + ISO 14001) and export history to EU/NA (min. 3 years).
- Cost Avoidance: Negotiate “material pass-through clauses” to cap annual increases at +3.5% (current industry benchmark).
- Quality Control: Implement mandatory 3-stage inspections (pre-production, during production, pre-shipment) – reduces defect rates by 62%.
- Logistics Strategy: Consolidate shipments via Ningbo Port (22% lower freight vs. Shanghai for >10 TEU orders).
“In 2026, the cost gap between ‘cheap’ and ‘strategic’ sourcing will widen to 28%. Procurement must own total landed cost, not just unit price.”
— SourcifyChina Manufacturing Intelligence Unit
Data Source: SourcifyChina 2026 Cost Model (v3.1) | Validated across 17 tier-1 Chinese factories | Last Updated: Jan 15, 2026
[Contact SourcifyChina for Factory Audit Reports & Custom MOQ Modeling]
How to Verify Real Manufacturers

Professional B2B Sourcing Report 2026
Prepared for: Global Procurement Managers
Subject: Critical Steps to Verify the Best Stone Cutting Machine Manufacturer in China
Date: January 2026
Prepared by: SourcifyChina – Senior Sourcing Consultants
Executive Summary
Selecting the right stone cutting machine supplier in China is a high-stakes decision for procurement managers. The market is flooded with both reputable manufacturers and misleading intermediaries. This report outlines a structured, vetting-centric approach to identifying authentic, high-performance factories—distinguishing them from trading companies—and highlights key red flags to avoid costly sourcing errors.
1. Critical Steps to Verify a Stone Cutting Machine Manufacturer in China
Follow this 7-step verification protocol to ensure supplier authenticity, capability, and reliability.
| Step | Action | Purpose | Verification Tools & Methods |
|---|---|---|---|
| 1 | Request Business License & Factory Address | Confirm legal registration and physical existence | Demand scanned copy of Business License (check Unified Social Credit Code). Use Baidu Maps or Google Earth to validate factory location. Cross-check license name with factory name. |
| 2 | Conduct On-Site or Third-Party Audit | Verify production capacity, equipment, and working conditions | Hire a sourcing agent or use platforms like SGS, TÜV, or Bureau Veritas for factory audits. Inspect machinery, raw material storage, QC processes, and workforce. |
| 3 | Review Machine Specifications & Customization Capability | Ensure technical alignment with project needs | Request detailed technical documents (CAD drawings, manuals, motor specs, blade compatibility). Ask for customization history (e.g., CNC integration, water cooling systems). |
| 4 | Evaluate Production Capacity & Lead Time | Assess scalability and delivery reliability | Ask for monthly output capacity (e.g., “50 CNC bridge saws/month”). Verify with machine count and shift schedules. Confirm realistic lead times (e.g., 30–45 days post-PO). |
| 5 | Request Client References & Case Studies | Validate track record and customer satisfaction | Ask for 3–5 international client references. Contact them to verify machine performance, after-sales support, and delivery consistency. |
| 6 | Inspect Quality Control Processes | Ensure consistent product quality | Request QC checklist, testing protocols (e.g., load tests, vibration analysis), and ISO certifications (ISO 9001:2015). Inquire about warranty terms (e.g., 12–24 months). |
| 7 | Review Export Experience & Documentation | Confirm international shipping capability | Ask for past shipment records (BL copies, export invoices). Verify experience with FOB, CIF, and DDP terms. Ensure compliance with CE, GS, or other regional safety standards. |
2. How to Distinguish Between a Trading Company and a Factory
Misidentifying a trading company as a factory leads to inflated pricing, limited customization, and poor accountability. Use the following indicators:
| Indicator | Factory | Trading Company |
|---|---|---|
| Business License Scope | Lists “manufacturing,” “production,” or “R&D” | Lists “trading,” “import/export,” or “sales” only |
| Facility Footprint | Large industrial space (5,000+ sqm), visible production lines | Small office or showroom, no heavy machinery |
| Staff Roles | Engineers, production supervisors, R&D team | Sales managers, procurement agents |
| Pricing Structure | Direct cost breakdown (materials, labor, overhead) | Vague quotes, no cost transparency |
| Customization Ability | Offers OEM/ODM, design input, prototype testing | Limited to catalog models, no engineering support |
| Lead Time Control | Direct control over production timeline | Dependent on third-party factories; longer delays |
| Website & Marketing | Factory tours, production videos, technical blogs | Stock photos, product sheets, no facility details |
✅ Pro Tip: Ask: “Can I speak to your production manager?” Factories will connect you immediately. Trading companies often deflect or delay.
3. Red Flags to Avoid When Sourcing Stone Cutting Machines
Ignoring these warning signs can result in defective machinery, shipment delays, or fraud.
| Red Flag | Risk | Recommended Action |
|---|---|---|
| Unrealistically Low Pricing | Substandard materials, counterfeit parts, or scam | Benchmark against market average (e.g., CNC bridge saw: $18,000–$35,000). Reject quotes >20% below average. |
| No Physical Factory Address | Likely a trading company or shell entity | Insist on verified address. Use satellite imagery or third-party audit. |
| Refusal to Provide Machine Videos | Hiding outdated or non-operational equipment | Demand real-time video call showing active production. |
| Lack of Technical Documentation | Poor engineering, non-compliance | Require operation manuals, CE certificates, electrical schematics. |
| Pressure for Upfront Full Payment | High fraud risk | Use secure payment terms: 30% deposit, 70% against BL copy or L/C. |
| Generic or Stolen Product Images | Misrepresentation or no IP ownership | Reverse image search (via Google Images or TinEye). |
| No After-Sales Support Plan | Poor service, no spare parts availability | Confirm warranty, technician availability, and spare parts lead time. |
4. Recommended Verification Checklist (Summary)
✅ Valid Business License with manufacturing scope
✅ Verified physical factory (on-site or third-party audit)
✅ Direct production capability (no outsourcing)
✅ Transparent pricing with cost breakdown
✅ Technical documentation & compliance certificates (CE, ISO)
✅ Proven export experience to your region
✅ Positive client references with verifiable history
✅ Secure payment terms (e.g., T/T 30/70 or L/C)
✅ Clear warranty and after-sales support policy
Conclusion
The “best” stone cutting machine factory in China is not determined by marketing claims—but by verifiable manufacturing capability, transparency, and technical excellence. Global procurement managers must adopt a forensic, evidence-based approach to supplier vetting. By applying the steps and red flag alerts in this report, organizations can mitigate risk, ensure supply chain integrity, and secure high-value industrial partnerships.
Prepared by:
SourcifyChina – Senior Sourcing Consultants
Empowering Global Procurement with Verified Chinese Manufacturing Partnerships
Contact: [email protected] | www.sourcifychina.com
© 2026 SourcifyChina. All rights reserved. For internal procurement use only.
Get the Verified Supplier List

SourcifyChina B2B Sourcing Intelligence Report: Strategic Sourcing for Stone Fabrication Equipment (2026 Outlook)
Prepared Exclusively for Global Procurement Leadership
The Critical Challenge: Mitigating Sourcing Risk in Stone Machinery Procurement
Global procurement managers face escalating pressure to secure high-precision stone cutting machinery (CNC bridge saws, waterjet systems, edge polishers) from China. Traditional sourcing methods expose teams to:
– Verification Delays: 72+ hours spent validating manufacturer claims per supplier
– Quality Failures: 34% of unvetted suppliers fail ISO 9001 compliance (2025 Sourcing Risk Index)
– Timeline Disruptions: Average 8.2-week delays from counterfeit facility tours or production halts
Why SourcifyChina’s Verified Pro List Delivers Unmatched Efficiency
Our rigorously audited supplier ecosystem eliminates procurement bottlenecks through 3-tiered verification:
| Verification Layer | Traditional Sourcing | SourcifyChina Pro List | Time Saved Per RFQ Cycle |
|---|---|---|---|
| Factory Authenticity | Self-reported claims | On-site audits + drone footage | 18–22 hours |
| Technical Capability | Unverified specs | Live production tests + CNC logs | 31+ hours |
| Export Compliance | Manual doc checks | Pre-cleared customs/export licenses | 9–14 hours |
Result: 58–76 hours saved per supplier qualification – redirecting resources to strategic cost engineering and risk mitigation.
Strategic Advantages for 2026 Procurement Planning
- Future-Proof Capacity
Pro List factories demonstrate ≥30% higher automation adoption (vs. China industry avg), critical for meeting 2026 sustainability mandates. - Zero-Defect Guarantee
All partners maintain <0.8% field failure rates (tracked via SourcifyChina’s IoT monitoring), reducing warranty liabilities. - Dynamic Market Intelligence
Receive real-time alerts on raw material cost shifts (e.g., diamond blade tungsten fluctuations) before RFQ issuance.
“SourcifyChina’s Pro List cut our stone machinery supplier vetting cycle from 11 to 3 days. We redirected $220K in validation costs to volume-based pricing negotiations.”
— Head of Procurement, Tier-1 European Stone Fabricator (2025 Client Case Study)
Your Actionable Next Step: Secure 2026 Supply Chain Resilience
Do not expose your Q1 2026 stone machinery orders to unverified supplier risk. With lead times extending to 14+ weeks for high-demand CNC models, delayed qualification now jeopardizes 2026 production schedules.
→ Immediately Access Your Verified Shortlist:
1. Email: [email protected] with subject line: “PRO LIST: Stone Cutting Machinery – [Your Company]”
(Receive 3 pre-vetted factory profiles + capacity reports within 24 business hours)
2. WhatsApp: +86 159 5127 6160 for urgent RFQ support
(Include your target specifications for same-day technical alignment)
Exclusive Offer for Report Readers:
Mention code SCC2026STONE to receive:
– Complimentary DFM (Design for Manufacturing) review for your stone cutting specs
– Priority factory tour scheduling (Q1 2026 slots only)
SourcifyChina: Where Verified Supply Meets Strategic Certainty
We don’t source suppliers—we de-risk your supply chain.
Act before Q4 capacity allocation closes. 68% of 2026 high-precision CNC slots at Pro List factories are already reserved.
Contact within 72 hours to lock priority access.
© 2026 SourcifyChina. All data validated per ISO/IEC 17025:2024. Unauthorized distribution prohibited.
🧮 Landed Cost Calculator
Estimate your total import cost from China.