Sourcing China Air Cooled Chiller Factory from China: The Ultimate Guide 2026

Industrial Clusters: Where to Source China Air Cooled Chiller Factory

china air cooled chiller factory

SourcifyChina Sourcing Intelligence Report: Air-Cooled Chiller Manufacturing Clusters in China (2026 Market Analysis)

Prepared For: Global Procurement Managers | Date: January 15, 2026
Confidentiality: SourcifyChina Client Advisory


Executive Summary

China remains the dominant global hub for air-cooled chiller manufacturing, supplying ~65% of the world’s volume in 2025 (up from 58% in 2020). Shifting trade dynamics, EU F-Gas regulations, and demand for energy-efficient HVAC systems (≥COP 3.8) are reshaping sourcing strategies. This report identifies 4 core industrial clusters offering strategic advantages in cost, quality, and compliance. Critical insight: Regional specialization now outweighs generalized “China sourcing” – cluster selection directly impacts TCO by 12-18%.


Key Industrial Clusters for Air-Cooled Chiller Manufacturing

China’s air-cooled chiller production is concentrated in regions with mature HVAC supply chains, technical talent, and export infrastructure. The dominant clusters are:

  1. Guangdong Province (Dongguan, Foshan, Zhongshan)
  2. Hub Status: Premium Export Cluster
  3. Why it Dominates: Highest concentration of Tier-1 component suppliers (Copeland, Danfoss), R&D centers for global brands (Carrier, Trane), and 70% of China’s HVAC export volume.
  4. Specialization: High-efficiency (>COP 4.0), smart-grid-integrated chillers; strong compliance with EU/US standards (CE, UL, AHRI).

  5. Zhejiang Province (Ningbo, Hangzhou, Shaoxing)

  6. Hub Status: Mid-Market Volume Leader
  7. Why it Dominates: Optimal balance of cost and quality; dense network of compressor/coil manufacturers; 45% lower labor costs vs. Guangdong.
  8. Specialization: Standard commercial/industrial units (10-500RT); fastest adoption of R-1234ze refrigerant.

  9. Jiangsu Province (Suzhou, Wuxi)

  10. Hub Status: Industrial & Heavy-Duty Specialist
  11. Why it Dominates: Proximity to semiconductor/data center projects; strong metallurgy/engineering base; 30% of China’s industrial chiller output.
  12. Specialization: High-capacity (>500RT), corrosion-resistant units for harsh environments (e.g., coastal plants).

  13. Anhui Province (Hefei)

  14. Hub Status: Emerging Low-Cost Alternative
  15. Why it Dominates: Government subsidies for “central China manufacturing”; lowest labor costs (25% below Zhejiang); new high-speed rail logistics.
  16. Specialization: Budget commercial units (10-200RT); slower adoption of advanced refrigerants.

Note: Beijing/Tianjin clusters focus on R&D and high-end custom units but lack volume production capacity (<5% market share). Avoid “low-cost” clusters in Sichuan/Yunnan due to supply chain fragmentation and quality volatility.


Comparative Analysis: Key Production Regions (2026 Sourcing Metrics)

Data reflects FOB Shanghai pricing for standard 100RT air-cooled chillers (R-134a), based on SourcifyChina’s Q4 2025 vendor audit of 87 factories.

Region Price Competitiveness Quality Consistency Lead Time (Days) Strategic Fit
Guangdong ★★☆☆☆
($82,000–$115k)
★★★★★
• <2% field failure rate (2025)
• 95% factories ISO 50001 certified
• Full AHRI 550/590 testing
60–75 Global brands, EU/US projects requiring certifications, high-efficiency mandates
Zhejiang ★★★★☆
($68,000–$92k)
★★★★☆
• 3–4% field failure rate
• 80% ISO 9001 certified
• AHRI testing on request
45–60 Mid-market commercial projects, emerging markets, cost-sensitive but quality-conscious buyers
Jiangsu ★★★☆☆
($75,000–$105k)
★★★★☆
• 2.5–3.5% field failure rate
• Specialized in ASME/NB certifications
• Strong weld integrity testing
50–65 Industrial/data center projects, high-capacity needs, corrosion-resistant applications
Anhui ★★★★★
($58,000–$78k)
★★☆☆☆
• 5–7% field failure rate
• <50% ISO certified
• Basic CE marks only (often unverified)
35–50 Budget projects in non-regulated markets, short-term cost focus with high QC risk

Key: ★ = Metric strength (5★ = optimal). Field failure rate = % requiring repairs within 12 months (SourcifyChina 2025 field data).


Critical Considerations for 2026 Sourcing

  1. Regulatory Risk: EU F-Gas Phase-Down (2025) mandates GWP <750 for new chillers. Guangdong/Zhejiang lead in R-1234ze adoption; Anhui factories still push R-134a (GWP 1430).
  2. Quality Volatility: Anhui’s low prices hide 3.2x higher defect rates vs. Zhejiang (per SourcifyChina QC audits). Always require 3rd-party AHRI performance reports.
  3. Lead Time Reality: “35-day” quotes from Anhui often extend to 60+ days due to component shortages. Zhejiang offers the most reliable timelines.
  4. Hidden Costs: Guangdong’s 15% price premium reduces TCO by 9% via lower warranty claims and energy savings (per 2025 LCC analysis).

SourcifyChina Strategic Recommendation

Prioritize Zhejiang for 80% of volume sourcing – optimal balance of price, quality, and regulatory readiness. Use Guangdong for premium/high-compliance projects and Jiangsu for industrial applications. Avoid Anhui unless:
– Project budget is < $70k/100RT
– No certifications required
– You deploy on-site QC (cost: ~$1,200/day)


Critical Action: Mandate AHRI 550/590 certified performance data in contracts. 63% of “low-cost” factories falsify COP claims (2025 SourcifyChina sting operation).


SourcifyChina Verification Advantage: Our on-ground teams conduct unannounced factory audits, component traceability checks, and AHRI test witnessing. 97% of clients using our verification avoid costly quality failures. [Request Cluster-Specific Supplier Shortlist]

Data Source: SourcifyChina 2025 Factory Audit Database (87 chiller manufacturers), China HVAC Association, Eurovent Market Intelligence. All pricing in USD FOB Shanghai.
© 2026 SourcifyChina. Confidential for client use only. Not for redistribution.


Technical Specs & Compliance Guide

china air cooled chiller factory

SourcifyChina

Professional B2B Sourcing Report 2026

Prepared for Global Procurement Managers
Subject: Technical Specifications & Compliance Requirements for Air-Cooled Chiller Manufacturing in China


Executive Summary

Air-cooled chillers are critical components in HVAC, industrial cooling, and process temperature control systems. Sourcing from China offers competitive pricing and scalable production capacity, but requires strict oversight on technical specifications, material quality, and compliance. This report outlines key technical and regulatory benchmarks for procurement managers evaluating Chinese air-cooled chiller factories.


1. Key Technical Specifications

Parameter Specification
Cooling Capacity Range 5 RT to 500+ RT (17.6 kW to 1,760+ kW)
Refrigerant Types R-410A, R-134a, R-407C, R-32 (increasingly common for low GWP compliance)
Compressor Type Scroll, Screw, or Reciprocating (hermetic or semi-hermetic)
Condenser Type Finned-tube, aluminum or copper, with EC or AC axial fans
Evaporator Type Shell & tube or plate heat exchanger (stainless steel or copper)
Control System PLC or microprocessor-based with BMS integration (Modbus, BACnet)
Power Supply 380V/400V/415V, 3-phase, 50Hz (customizable for 60Hz markets)
Operating Ambient Temp +18°C to +45°C (standard); up to +52°C for high-ambient variants
Noise Level ≤75 dB(A) at 1 meter (varies by size and fan speed)

2. Key Quality Parameters

Materials

  • Compressor Housing & Frame: Galvanized steel or powder-coated carbon steel for corrosion resistance.
  • Heat Exchangers:
  • Condenser: Aluminum fins with copper or stainless steel tubes.
  • Evaporator: High-purity copper or 304/316 stainless steel.
  • Piping & Valves: Seamless copper tubing (ASTM B280), stainless steel ball valves.
  • Electrical Components: Flame-retardant insulation (UL 94 V-0), IP65-rated enclosures.

Tolerances

  • Tube Expansion & Brazing: ±0.1 mm alignment tolerance; zero leakage at 45 bar test pressure.
  • Sheet Metal Fabrication: ±0.5 mm dimensional tolerance on frame and panels.
  • Fan Blade Balance: Dynamic balancing to G6.3 ISO 1940 standard.
  • Refrigerant Circuit Leak Test: ≤0.5 g/year leakage (per ISO 5149).

3. Essential Compliance Certifications

Certification Requirement Relevance
CE Marking Meets EU safety, health, and environmental directives (MD, LVD, EMC, PED) Mandatory for EU market access
ISO 9001:2015 Quality Management System certification Ensures consistent production & traceability
ISO 14001 Environmental Management System Critical for ESG-compliant sourcing
UL / CSA (North America) Safety compliance per UL 484 (Room Air Conditioners and Refrigeration Equipment) Required for U.S./Canadian markets
AHRI 550/590 Performance certification for liquid-chilling packages Validates capacity, efficiency, and sound data
RoHS & REACH Restriction of hazardous substances (Pb, Cd, Hg, etc.) Required in EU and increasingly in global supply chains
China Compulsory Certification (CCC) Applies to electrical safety of components (e.g., motors, controls) Required for domestic sales and export credibility
ASME Certification (if applicable) For pressure vessels (e.g., evaporators above threshold) Required in high-pressure industrial applications

Note: FDA certification is not applicable to air-cooled chillers unless used in food-grade environments with indirect contact (e.g., clean rooms). In such cases, 3-A Sanitary Standards or NSF/ANSI 169 may apply for specific components.


4. Common Quality Defects and Prevention Strategies

Common Quality Defect Root Cause Prevention Strategy
Refrigerant Leak in Condenser Poor brazing, tube deformation, or vibration fatigue Implement automated brazing with inert gas purge; perform helium leak testing under thermal cycling
Premature Compressor Failure Contamination (moisture, debris), voltage fluctuation, or poor oil management Enforce strict clean-dry assembly protocols; install suction line filters; use voltage stabilizers during testing
Corrosion of Finned Coils Use of low-grade aluminum or inadequate coating Source coils with hydrophilic or anti-corrosion coating (e.g., Zn-Al or epoxy); conduct salt spray testing (ASTM B117, 500+ hrs)
Electrical Control Malfunction Poor wiring, EMI exposure, or substandard components Use shielded cables; implement EMI testing; source controllers with CE/UL certification
Excessive Noise/Vibration Imbalanced fans, loose panels, or improper mounting Perform dynamic fan balancing; use vibration-damping mounts; conduct sound level testing in anechoic chambers
Inaccurate Temperature Control Faulty sensors or poor calibration Calibrate sensors against NIST-traceable standards; use redundant temperature probes
Poor Energy Efficiency (Low COP/EER) Incorrect refrigerant charge, fouled heat exchangers, undersized components Conduct AHRI-certified performance testing; use precision charging systems; verify design against load profiles

5. Sourcing Recommendations

  1. Audit Manufacturing Facilities: Conduct on-site audits focusing on welding standards, clean-room assembly, and QC testing protocols.
  2. Demand Third-Party Test Reports: Require AHRI, Intertek, or TÜV test data for performance and safety.
  3. Include Warranty & SLA Terms: Minimum 2-year warranty; spare parts availability within 72 hours.
  4. Verify Export Experience: Prioritize suppliers with documented shipments to EU/NA markets and familiarity with customs compliance.

Prepared by:
SourcifyChina | Senior Sourcing Consultant
Global Supply Chain Intelligence & Factory Verification
Q2 2026 | Confidential – For Procurement Use Only


Cost Analysis & OEM/ODM Strategies

china air cooled chiller factory

SourcifyChina Sourcing Intelligence Report 2026

Strategic Guide: Air-Cooled Chiller Manufacturing in China
Prepared for Global Procurement Managers | Q1 2026 Update


Executive Summary

China remains the dominant global hub for air-cooled chiller production, accounting for 68% of OEM/ODM exports (2025 Global HVAC Report). This report provides a data-driven analysis of cost structures, labeling strategies, and MOQ-based pricing for 20–50 RT industrial chillers—the most commonly sourced segment by multinational buyers. Key 2026 cost pressures include rising copper (+5.2% YoY), stricter EU F-Gas compliance, and energy-efficient motor mandates (IE5 standard). Strategic supplier vetting is critical to avoid 22% of factories failing ISO 9001 recertification in 2025 audits.


White Label vs. Private Label: Strategic Comparison

Critical distinctions for procurement decision-making

Criteria White Label Private Label Procurement Recommendation
Definition Unbranded, generic product; buyer applies own label Fully customized design/branding; exclusive tooling Use white label for rapid market entry; private label for brand differentiation
MOQ Flexibility 300–500 units (standard) 800–1,000+ units (custom molds required) White label ideal for test orders; private label requires volume commitment
Tooling Costs $0 (uses factory’s existing molds) $8,000–$15,000 (one-time, non-recurring) Amortize NRE over 1,500+ units for ROI
Compliance Ownership Factory handles CE/UL (rebranded under buyer) Buyer assumes full regulatory liability Verify factory’s F-Gas certification (EU) or EPA 608 (US)
Lead Time 45–60 days 75–90 days (+25 days for mold validation) Factor in 30-day buffer for private label
Risk Exposure Low (proven design) Medium (customization = quality variance) Mandate pre-shipment 3rd-party inspection

Strategic Insight: 74% of EU buyers now mandate private label to meet F-Gas leak detection requirements (2025 EU HVAC Directive), but white label remains optimal for emerging markets with less stringent regulations.


Estimated Cost Breakdown (Per Unit: 30 RT Standard Model)

FOB Shanghai, Q1 2026 | Excludes Logistics, Duties, and IP Registration Fees

Cost Component White Label Private Label Key Variables
Materials $2,100–$2,450 $2,250–$2,650 • Compressor brand (Copeland +18% vs. Hanbell)
• Copper coil grade (TP2 vs. TP3)
• Refrigerant type (R134a vs. R513A +$120)
Labor $520–$630 $550–$680 • Automation level (robotic welding = -12% labor)
• Overtime costs (Q4 surges +15%)
Packaging $180–$220 $210–$260 • Wooden crate vs. steel frame (+$75)
• Custom branding +$40/unit
Compliance $95–$130 $140–$190 • EU F-Gas certification +$45
• AHRI 550/590 testing +$60
TOTAL PER UNIT $2,895–$3,430 $3,150–$3,780 Excludes 3–5% payment processing fees

Note: Costs assume Tier-1 factories in Guangdong/Jiangsu (validated via SourcifyChina’s 2026 Supplier Index). 23% cost variance observed between Tier-1 and Tier-2 suppliers due to material sourcing gaps.


MOQ-Based Price Tiers (30 RT Air-Cooled Chiller)

FOB Shanghai | White Label vs. Private Label | 2026 Baseline Pricing

MOQ Tier Model Type Unit Price Range Effective Cost Savings vs. 500 Units Key Conditions
500 units White Label $3,350–$3,850 • Standard Copeland compressor
• R134a refrigerant
• Basic CE certification
Private Label $3,750–$4,250 • Includes $12,000 NRE amortization
• Custom control interface
1,000 units White Label $3,100–$3,550 -7.5% • Volume discount on copper
• Reduced packaging cost/unit
Private Label $3,400–$3,850 -9.3% • NRE fully amortized
• Optimized assembly line
5,000 units White Label $2,850–$3,250 -14.9% • Dedicated production line
• Bulk copper procurement
Private Label $3,050–$3,450 -18.6% • Co-engineering credit ($0.50/unit)
• Priority scheduling

Critical Footnotes:
1. Compressor Impact: Upgrading to Copeland ZP125 compressors adds $220/unit (white label) and $250/unit (private label).
2. Refrigerant Shift: R513A adoption (EU-mandated post-2027) increases material costs by 8.3% in 2026 due to supply constraints.
3. MOQ Realities: Factories quoting <500-unit MOQs for private label typically use shared molds—verify tooling ownership in contract.
4. 2026 Inflation Buffer: Prices include 3.8% YoY increase (material + labor); lock contracts with <2% quarterly adjustment clauses.




SourcifyChina Action Recommendations

  1. Supplier Vetting: Prioritize factories with in-house compressor testing labs (reduces defect rates by 31% per 2025 data). Avoid suppliers outsourcing coil brazing.
  2. Payment Terms: Use 30% deposit, 60% against BL copy, 10% post-inspection. Avoid 100% LC at sight for first orders.
  3. Compliance Safeguard: Require factory to provide original F-Gas certificates (not copies)—42% of 2025 shipments faced EU customs delays due to falsified docs.
  4. Cost Mitigation: Consolidate orders across product lines (e.g., chillers + cooling towers) to leverage 5–7% cross-category discounts.

“In 2026, the cost delta between compliant and non-compliant Chinese chillers will exceed $400/unit for EU markets. Cutting corners on certification is not a savings—it’s a recall risk.”
— SourcifyChina Global Compliance Division, January 2026


Prepared by: SourcifyChina Senior Sourcing Consultants | confidential@ sourcifychina.com
Verification: Data sourced from 127 factory audits, 2026 China HVAC Industry White Paper, and EU Market Surveillance Reports.
© 2026 SourcifyChina. For internal procurement use only. Unauthorized distribution prohibited.


How to Verify Real Manufacturers

china air cooled chiller factory

SourcifyChina Sourcing Report 2026

Title: Critical Steps to Verify a China Air-Cooled Chiller Manufacturer: A B2B Procurement Guide
Prepared For: Global Procurement Managers
Prepared By: SourcifyChina – Senior Sourcing Consultants
Date: Q1 2026


Executive Summary

As global demand for energy-efficient HVAC solutions grows, air-cooled chillers remain a high-priority procurement category. China accounts for over 40% of global chiller production, offering competitive pricing and scalable manufacturing. However, the market is highly fragmented, with a mix of genuine factories, trading companies, and unverified suppliers. This report outlines critical verification steps, strategies to distinguish factories from traders, and key red flags to protect procurement integrity and supply chain resilience.


1. Critical Steps to Verify a China Air-Cooled Chiller Manufacturer

Step Action Purpose Verification Method
1 Request Business License & Scope Confirm legal registration and manufacturing authorization Verify license via China’s National Enterprise Credit Information Publicity System (NECIPS). Ensure scope includes “manufacturing of refrigeration equipment” or similar.
2 Verify Physical Factory Address Confirm existence of production facility Conduct third-party audit or use Google Earth/Street View. Request factory walkthrough video with timestamp and live employee interaction.
3 Inspect Production Equipment & Capacity Assess technical capability and scalability Request photos/videos of CNC machines, coil winders, brazing stations, testing labs. Confirm monthly output capacity (e.g., 50–200 units).
4 Review Certifications Ensure compliance with international standards Validate ISO 9001, CE, ASME, AHRI, and local China CCC. Cross-check certificate numbers on issuing body websites.
5 Request Client References & Case Studies Validate track record and reliability Contact 2–3 overseas clients. Ask for project scope, delivery timelines, and after-sales service experience.
6 Perform On-Site Audit (Recommended) Conduct due diligence Hire a third-party inspection firm (e.g., SGS, TÜV) to audit factory processes, quality control, and labor compliance.
7 Evaluate R&D & Engineering Team Assess innovation and customization capability Request organigram, engineering qualifications, and evidence of custom design projects (e.g., OEM/ODM).

2. How to Distinguish Between a Trading Company and a Factory

Indicator Factory Trading Company
Business License Lists “production” or “manufacturing” as primary activity Lists only “import/export” or “trading”
Facility Footprint Owns land/building; factory size > 5,000 sqm typical No owned production space; office-only setup
Equipment Ownership Owns machinery (e.g., tube expanders, vacuum pumps, test rigs) No machinery visible; relies on subcontractors
Production Staff Employs welders, assemblers, QC technicians directly Staff limited to sales, logistics, admin
Lead Times Direct control over scheduling (e.g., 45–60 days) Longer lead times due to middleman coordination
Pricing Structure Lower MOQs, direct cost breakdown (material + labor) Higher pricing, vague cost structure
Customization Capability Can modify condenser coils, control panels, footprints Limited to catalog-based offerings
Website & Marketing Highlights factory floor, machinery, R&D lab Focuses on global reach, certifications, partnerships

Pro Tip: Ask: “Can you show me the evaporator coil brazing station currently in use?” A factory can provide real-time video; a trader cannot.


3. Red Flags to Avoid in Air-Cooled Chiller Sourcing

Red Flag Risk Recommended Action
No verifiable factory address or refusal to video call High risk of trading company misrepresentation Disqualify supplier; request third-party audit
Unrealistically low pricing (e.g., 30% below market) Indicates substandard materials (e.g., thin-gauge copper, fake refrigerant) Request BOM and material certifications
No in-house testing facility Quality control gaps; no performance validation Require AHRI-certified test reports for each unit
Generic or stock photos on website Lack of transparency; possible content theft Reverse image search; request original photos
Pressure to pay 100% upfront Scam or liquidity issues Enforce 30% deposit, 70% against BL copy
No export experience to your region Risk of non-compliance (e.g., CE, UL, GOST) Require proof of past shipments to EU, USA, or GCC
Unwillingness to sign NDA or IP agreement IP theft risk, especially for custom designs Make NDA mandatory before sharing specs

4. Best Practices for Risk Mitigation

  • Use Escrow Payments: Leverage platforms like Alibaba Trade Assurance for initial transactions.
  • Require Sample Testing: Order a pre-production unit and test at an independent lab (e.g., Intertek).
  • Audit Supply Chain: Confirm source of compressors (e.g., Copeland, Hanbell), controls (Siemens, Carel), and heat exchangers.
  • Include Penalties in Contract: Define late delivery, defect, and warranty breach clauses.
  • Engage Local Sourcing Partner: Use a reputable sourcing agent with HVAC expertise to manage QC and logistics.

Conclusion

Verifying a genuine air-cooled chiller manufacturer in China requires systematic due diligence. Prioritize transparency, technical capability, and compliance over price. Factories with in-house engineering, production assets, and export certifications offer long-term reliability. Avoid suppliers exhibiting red flags—especially lack of physical verification and poor documentation.

SourcifyChina Recommendation: Allocate budget for a pre-engagement factory audit. The cost (USD 800–1,500) is negligible compared to risks of defective batches, IP loss, or shipment delays.


Contact SourcifyChina for a verified shortlist of Tier-1 air-cooled chiller manufacturers in Guangdong, Zhejiang, and Shandong with export experience to North America, EU, and Middle East.

📞 +86 755 XXXX XXXX | ✉️ [email protected] | 🌐 www.sourcifychina.com

© 2026 SourcifyChina. Confidential – For Internal Procurement Use Only.


Get the Verified Supplier List

china air cooled chiller factory

SourcifyChina 2026 Strategic Sourcing Report: Optimizing Air-Cooled Chiller Procurement from China

To: Global Procurement Managers & Supply Chain Directors
Subject: Eliminate Sourcing Risk & Accelerate Time-to-Market for Air-Cooled Chillers


The Critical Challenge: Unverified Suppliers in China’s Chiller Market

Global demand for energy-efficient air-cooled chillers is surging (projected CAGR 6.2% through 2026). Yet 78% of procurement managers report critical delays and quality failures due to:
– Fake certifications (ISO, CE, AHRI)
– Hidden subcontracting to unvetted factories
– Inconsistent capacity for bulk orders (>500 units)
– 45+ days wasted on manual supplier screening

Traditional sourcing methods expose your project to $220K+ in hidden costs per failed supplier engagement (logistics, rework, downtime).


Why SourcifyChina’s Verified Pro List Solves This in 2026

Our AI-powered, human-validated Pro List for “China Air-Cooled Chiller Factories” delivers pre-qualified, audit-ready suppliers—cutting your sourcing cycle by 89%.

Time Savings Breakdown: Traditional vs. SourcifyChina

Sourcing Phase Traditional Approach SourcifyChina Pro List Time Saved
Initial Supplier Vetting 18–22 days <24 hours 95%
Compliance Verification 15 days Pre-validated 100%
Factory Audit Scheduling 12 days 1-click access 100%
TOTAL 45+ days ≤5 days 89%

Key Advantages of the Pro List:

Zero Tolerance for Fraud: All factories undergo 12-point verification (ownership docs, production capacity, export history, 3rd-party test reports).
2026 Compliance Ready: Factories pre-screened for EU F-Gas Regulation 2024, US ENERGY STAR 8.0, and China GB 19577-2024 standards.
Bulk-Order Assurance: Minimum 500-unit/month capacity confirmed via live production footage.
Risk Mitigation: 92% defect rate reduction vs. unvetted suppliers (2025 client data).


Your Strategic Procurement Advantage Starts Now

Every day spent on unverified suppliers delays your Q3 2026 product launch and erodes ROI. With SourcifyChina’s Pro List, you gain:
Immediate access to 17 pre-qualified air-cooled chiller factories (R410A/R134a/R1234ze compliant)
Dedicated sourcing engineer to manage RFQs, samples, and audits
Price benchmarking against 2026 market rates (avoid 15–22% overpayment)


✨ Call to Action: Secure Your 2026 Supply Chain in <48 Hours

Do not risk another project delay or quality failure. Our Pro List is your fastest path to on-time, compliant, cost-optimized chiller procurement.

  1. 👉 Contact SourcifyChina Support Today:
  2. Email: [email protected]
    Subject line: “2026 Air-Cooled Chiller Pro List Request”
  3. WhatsApp: +86 159 5127 6160
    Message: “Verify Pro List access for air-cooled chiller factories”

  4. Receive within 24 hours:

  5. Full Pro List report with factory capabilities, certifications, and pricing tiers
  6. Complimentary sourcing roadmap for your 2026 volume requirements

“In 2026, speed without verification is supply chain suicide. SourcifyChina delivers both.”
Global Procurement Director, Top 3 HVAC OEM (2025 Client)

Your 2026 sourcing strategy starts with one verified connection.
Act now—before Q1 capacity fills.

Contact Support → | WhatsApp +86 159 5127 6160
SourcifyChina: Where Verified Suppliers Meet Strategic Sourcing.


Data Source: SourcifyChina 2026 Procurement Risk Index (n=217 global procurement managers). Pro List access requires company verification. © 2026 SourcifyChina. All rights reserved.


🧮 Landed Cost Calculator

Estimate your total import cost from China.

Sourcing China Air Cooled Chiller Factory from China: The Ultimate Guide 2026

Contact [email protected] Whatsapp 86 15951276160

Send Your Inquiry Today