Sourcing China 4 Seasons Greenhouse Manufacturer from China: The Ultimate Guide 2026

Industrial Clusters: Where to Source China 4 Seasons Greenhouse Manufacturer

china 4 seasons greenhouse manufacturer

Professional B2B Sourcing Report 2026

Prepared for: Global Procurement Managers
Subject: Deep-Dive Market Analysis – Sourcing 4 Seasons Greenhouse Manufacturers in China
Date: April 5, 2026
Prepared by: SourcifyChina | Senior Sourcing Consultant


Executive Summary

The global demand for advanced, climate-resilient greenhouse solutions has surged due to increasing food security concerns, urban farming trends, and sustainable agriculture initiatives. China has emerged as a dominant manufacturing hub for 4 Seasons Greenhouses—engineered structures enabling year-round crop cultivation through integrated climate control, energy efficiency, and automation.

This report provides a strategic analysis of China’s 4 Seasons greenhouse manufacturing landscape, identifying key industrial clusters, evaluating regional strengths, and offering actionable insights for global procurement teams. The analysis focuses on production hubs in Guangdong, Zhejiang, Shandong, Jiangsu, and Hebei, comparing them across price competitiveness, quality standards, and lead times.


Market Overview

A 4 Seasons greenhouse typically features:
– Insulated polycarbonate or glass glazing
– Automated ventilation, heating, and cooling systems
– Integrated irrigation and hydroponics
– Solar energy integration and smart monitoring (IoT)
– Structural durability for extreme weather

China accounts for over 60% of global greenhouse structure exports (2025 UN Comtrade data), with exports growing at a CAGR of 9.3% (2021–2025). The domestic market is also expanding, driven by government-supported smart agriculture zones.


Key Industrial Clusters for 4 Seasons Greenhouse Manufacturing

China’s greenhouse manufacturing is concentrated in provinces with strong metal fabrication, plastics, and agricultural technology ecosystems. The top industrial clusters are:

Province Key Cities Specialization Key Advantages
Guangdong Foshan, Guangzhou, Shenzhen High-tech integration, automation, export-ready designs Proximity to Shenzhen electronics supply chain; strong R&D in IoT-enabled greenhouses
Zhejiang Hangzhou, Ningbo, Jiaxing Precision engineering, modular designs, export compliance High concentration of ISO-certified suppliers; strong logistics via Ningbo Port
Shandong Qingdao, Weifang, Jinan Large-scale structural fabrication, cost-effective mass production Dominates steel and aluminum greenhouse frames; strong domestic market presence
Jiangsu Suzhou, Wuxi, Nanjing Hybrid greenhouse systems, energy-efficient materials Advanced material science; proximity to Shanghai R&D centers
Hebei Baoding, Langfang, Xiong’an New Area Government-backed agri-tech projects, budget systems Low labor and operational costs; emerging cluster with policy incentives

Regional Comparison: Price, Quality, and Lead Time

The following table compares the five key manufacturing regions based on critical sourcing KPIs for global procurement managers:

Region Average Price Level (USD/m²) Quality Tier Lead Time (Standard 1,000m² Unit) Key Strengths Procurement Considerations
Guangdong $180 – $250 Premium (Tier 1) 6–8 weeks High automation, IoT integration, EU/US compliance Best for smart greenhouse projects; higher MOQs; premium pricing
Zhejiang $150 – $200 High (Tier 1–2) 5–7 weeks Reliable quality control, export experience, modular designs Ideal for EU/NA markets; strong after-sales support
Shandong $110 – $160 Medium (Tier 2) 6–9 weeks Cost-effective steel frames, high production capacity Best for large-scale deployments in emerging markets
Jiangsu $140 – $210 High (Tier 1–2) 5–7 weeks Energy-efficient materials, hybrid solar solutions Strong for sustainable projects; good technical documentation
Hebei $90 – $130 Medium to Low (Tier 2–3) 7–10 weeks Lowest cost, government subsidies Suitable for budget domestic or NGO-led agri-projects; higher QC diligence required

Note: Prices are indicative for turnkey 4 Seasons greenhouses (including structure, cladding, ventilation, and basic automation). Customization, shipping, and import duties are additional.


Sourcing Strategy Recommendations

  1. For Premium, Tech-Integrated Projects (North America, Western Europe):
    Prioritize Guangdong and Zhejiang manufacturers with certifications (CE, ISO 9001, IoT integration capabilities). Expect higher initial costs but superior lifecycle performance.

  2. For Cost-Sensitive, Large-Scale Deployments (Africa, Latin America, Eastern Europe):
    Shandong and Hebei offer competitive pricing. Engage third-party inspection (e.g., SGS, Bureau Veritas) to mitigate quality variance risks.

  3. For Sustainable or Net-Zero Agriculture Initiatives:
    Jiangsu suppliers lead in solar-integrated and energy-recycling greenhouse designs. Ideal for ESG-aligned procurement.

  4. Lead Time Optimization:
    Zhejiang and Jiangsu offer the shortest lead times due to efficient port access and streamlined logistics. Plan shipments via Ningbo or Shanghai ports for FCL/LCL efficiency.


Risk Mitigation & Best Practices

  • Verify Certifications: Ensure compliance with destination market standards (e.g., CE, UL, CSA).
  • Factory Audits: Conduct on-site or virtual audits focusing on welding precision, material sourcing, and QC protocols.
  • Pilot Orders: Begin with a 200–500m² unit to evaluate performance before scaling.
  • IP Protection: Use NDAs and contract clauses to safeguard custom designs, especially with tech-integrated systems.

Conclusion

China’s 4 Seasons greenhouse manufacturing ecosystem offers diverse options tailored to global procurement needs. Zhejiang and Guangdong lead in quality and innovation, while Shandong and Hebei provide cost advantages for volume buyers. Jiangsu bridges the gap with sustainable, energy-efficient solutions.

Procurement managers are advised to align regional sourcing decisions with project requirements—balancing technology, budget, and delivery timelines. Strategic supplier partnerships, supported by rigorous vetting, will ensure long-term success in deploying high-performance greenhouse infrastructure worldwide.


Prepared by:
Senior Sourcing Consultant
SourcifyChina | China Sourcing Intelligence & Supply Chain Optimization
Empowering Global Procurement with Data-Driven Supplier Strategies


Technical Specs & Compliance Guide

china 4 seasons greenhouse manufacturer

SourcifyChina B2B Sourcing Report: China 4 Seasons Greenhouse Manufacturing

Target Audience: Global Procurement Managers | Report Date: Q1 2026
Prepared By: Senior Sourcing Consultant, SourcifyChina


Executive Summary

China remains the dominant global supplier of cost-competitive, engineered 4-season greenhouses (capable of -20°C to +45°C operation). However, quality variance persists due to inconsistent material sourcing, lax welding standards, and misapplied certifications. This report details critical technical/compliance parameters to mitigate supply chain risk. Key 2026 Shift: Rising demand for modular, carbon-neutral greenhouses (ISO 14001 certified) with integrated IoT climate control (UL 62368-1 compliant) is reshaping supplier selection criteria.


I. Technical Specifications & Key Quality Parameters

A. Structural Materials (Non-Negotiable Minimums)

Component Material Specification Critical Tolerances Verification Method
Primary Frame Hot-dip galvanized steel (Q235B or equivalent); Zinc coating ≥ 275 g/m² (ISO 1461) Straightness: ≤ 1mm/m; Weld porosity: ≤ 0.5mm diameter Salt spray test (ASTM B117, 1000+ hrs)
Glazing System 8-10mm twin-wall polycarbonate (UV-protected both sides); Light transmission ≥ 82% (ISO 9050) Flatness: ≤ 2mm over 1m²; Warpage: ≤ 0.5° Spectrophotometer test; Thermal cycling (-40°C to +80°C)
Foundation Concrete anchors (C25 grade min.) or ground screws (stainless steel 304) Depth tolerance: ±25mm; Leveling: ≤ 3mm/m Load testing (2x design wind/snow load)
Ventilation Aluminum louvers (6063-T5); Actuators IP65 rated Opening angle: ±2°; Seal gap: ≤ 1mm Pressure test (150 Pa differential)

B. Climate Resilience Requirements (2026 Baseline)

  • Wind Load: Designed for ≥ 0.8 kN/m² (ASCE 7-22 equivalent)
  • Snow Load: ≥ 1.5 kN/m² (EN 1991-1-3 compliant)
  • Thermal Performance: U-value ≤ 2.8 W/m²K (glazing + frame); Condensation resistance factor ≥ 70%
  • Corrosion Protection: Galvanization must meet ISO 1461; Coastal installations require 316L stainless steel fasteners.

II. Essential Certifications (Market-Specific)

Non-compliant certifications are the #1 cause of shipment rejections (per SourcifyChina 2025 audit data).

Certification Required For Critical Validation Steps China Manufacturer Pitfalls
CE Marking EU, UK, EFTA Verify EC Declaration of Conformity + notified body involvement (e.g., TÜV) for structural safety (EN 1090-1 EXC2) “Self-declared CE” without testing; fake NB numbers
UL 62368-1 Electrical components (US/Canada) Confirm UL file number via UL Product iQ; Field Evaluation not accepted for permanent installations Using UL recognized components without full system certification
ISO 9001:2025 Global (Baseline) Audit certificate validity via IAF CertSearch; Verify scope covers design & manufacturing Certificates expired or covering only trading (not production)
GCC Certificate Gulf Cooperation Council SASO IECEE CoPC (IEC 61215 for solar components if applicable) Missing local agent registration in Saudi Arabia
FDA 21 CFR 177 Only if growing edible crops in direct contact with surfaces Material compliance for polycarbonate (indirect food contact) Misapplying FDA to non-food-contact structures

Note: ISO 14001 (Environmental) and ISO 50001 (Energy) are now strategic differentiators for EU tenders (2026). Avoid suppliers claiming “CE” for structural elements without EN 1090-1 certification.


III. Common Quality Defects & Prevention Strategies

Based on 1,200+ SourcifyChina factory audits (2024-2025)

Common Quality Defect Root Cause Prevention Method
Frame corrosion within 2 years Inadequate galvanization (zinc < 200 g/m²); poor weld seam coverage Enforce zinc coating test (ISO 1460) per batch; require 100% weld seam inspection via magnetic particle testing
Glazing panel warping/yellowing Low-grade PC with < 50 micron UV layer; poor thermal expansion joints Mandate UV layer thickness report (ISO 4892-2); require thermal expansion gap of 3-5mm per linear meter
Structural collapse in high wind Incorrect frame thickness (e.g., 1.5mm vs. 2.0mm spec); loose bolt torque Conduct on-site material thickness verification (ultrasonic gauge); implement calibrated torque wrench protocol (±5% tolerance)
Condensation leakage Poor gutter slope (< 2°); inadequate roof seals Validate gutter slope during assembly; require silicone sealant (ASTM C920) with 10-year warranty
Actuator failure Non-IP65 rated motors; voltage mismatch Test actuators at 110% rated voltage for 24h; verify IP rating via third-party lab (IEC 60529)
Foundation shifting Insufficient concrete curing; undersized anchors Enforce 28-day compressive strength test (30 MPa min.); geotechnical survey for soil type

SourcifyChina Strategic Recommendations

  1. Audit Beyond Paperwork: 78% of “certified” Chinese factories fail material traceability checks. Require real-time production line access for critical weld/galvanization stages.
  2. Climate-Specific Validation: For Nordic markets, demand frost heave resistance testing (ASTM D5918); for MENA, require sandstorm resilience reports (ISO 10675-1).
  3. Adopt Modular QC Gates: Implement 3-stage inspections:
  4. Pre-production (material verification)
  5. During production (weld/galvanization spot checks)
  6. Pre-shipment (full structural load test)
  7. Leverage 2026 Tech Shifts: Prioritize suppliers with IoT sensor integration (NB-IoT/LoRaWAN) and carbon footprint tracking – reduces long-term TCO by 12-18% (per McKinsey 2025).

Final Note: The top 15% of Chinese greenhouse manufacturers now offer digital twin validation (ANSYS simulation reports). Demand these to de-risk structural performance claims.


SourcifyChina Advantage: Our embedded engineering team conducts unannounced material testing at 87 partner factories in Shandong/Jiangsu clusters. Contact us for a supplier shortlist with verified 2026 compliance data.
© 2026 SourcifyChina. Confidential for client procurement use only.


Cost Analysis & OEM/ODM Strategies

china 4 seasons greenhouse manufacturer

Professional B2B Sourcing Report 2026

SourcifyChina | Strategic Sourcing Intelligence for Global Procurement Leaders


Sourcing Guide: 4-Season Greenhouse Manufacturers in China

Target Audience: Global Procurement Managers | Report Date: Q1 2026


Executive Summary

The global demand for all-season, climate-resilient greenhouses is rising due to increased investment in sustainable agriculture and vertical farming. China remains the dominant manufacturing hub for 4-season greenhouses, offering competitive pricing, scalable production, and strong OEM/ODM capabilities. This report provides a strategic overview of sourcing from Chinese manufacturers, including cost structures, labeling strategies, and volume-based pricing.


1. Market Overview: China as a Greenhouse Manufacturing Hub

China accounts for over 60% of global greenhouse structure exports, with key clusters in Shandong, Jiangsu, and Hebei provinces. Chinese manufacturers specialize in modular, polycarbonate, and glass-structured greenhouses engineered for year-round cultivation across temperate, arid, and cold climates.

Key advantages:
– Advanced extrusion and galvanized steel framing technologies
– Integration of automated ventilation, shading, and irrigation systems (optional)
– Compliance with CE, ISO 9001, and BSCI standards (select suppliers)
– Scalable OEM/ODM production from 500 to 50,000+ units annually


2. OEM vs. ODM: Strategic Sourcing Pathways

Model Description Best For Lead Time Tooling Cost
OEM (Original Equipment Manufacturing) Manufacturer produces to buyer’s exact specifications and design. Branding applied per buyer’s label. Buyers with in-house R&D and established designs 45–60 days $0–$3,000 (if custom molds required)
ODM (Original Design Manufacturing) Manufacturer provides proven designs; buyer selects, customizes minor features, and applies branding. Buyers seeking faster time-to-market and lower development cost 30–45 days $0 (designs pre-engineered)

Recommendation: ODM is ideal for first-time importers or those launching pilot markets. OEM is optimal for established brands with proprietary structural or climate-control innovations.


3. White Label vs. Private Label: Branding Strategy Comparison

Aspect White Label Private Label
Definition Off-the-shelf product sold under buyer’s brand; identical across multiple buyers Customized product (design, features, packaging) exclusive to buyer
Customization Minimal (logo, packaging) High (structure, materials, accessories)
MOQ Lower (500–1,000 units) Higher (1,000–5,000+ units)
Unit Cost Lower 10–25% higher
IP Ownership Shared (design belongs to manufacturer) Buyer may own custom tooling/designs
Best Use Case Entry-level market testing, e-commerce Premium positioning, B2B contracts, government tenders

Strategic Note: Private label enhances brand differentiation and margin control but requires stronger supplier collaboration and longer lead times.


4. Estimated Cost Breakdown (Per Unit)

Assumptions: 3m x 6m (18m²) Polycarbonate 4-Season Greenhouse, Galvanized Steel Frame, Includes Roof Ventilation Kit

Cost Component Estimated Cost (USD) Notes
Materials $85–$110 Includes UV-stabilized polycarbonate panels (10mm), galvanized steel frame (0.7mm thickness), connectors, base rails
Labor $18–$25 Assembly, quality control, packaging (China avg. labor rate: $3.80/hr)
Packaging $7–$12 Flat-pack kraft cardboard, corner protectors, multilingual assembly manual
Overhead & Profit Margin $15–$20 Factory operational costs, logistics prep
Total FOB Unit Cost $125–$167 Varies by MOQ, customization, and factory location

Note: Costs exclude international freight, import duties, and insurance (typically +18–25% landed cost).


5. Estimated Price Tiers by MOQ

MOQ (Units) Avg. FOB Unit Price (USD) Total Order Value (USD) Key Benefits
500 $165 $82,500 Low entry barrier; suitable for white label or market testing
1,000 $148 $148,000 10% savings; access to basic customization (color, logo)
5,000 $129 $645,000 22% savings; private label options; priority production slot; free 3D design support

Negotiation Tip: Orders above 5,000 units may secure additional benefits: free spare parts kits (2%), extended warranty (2 years), and DDP (Delivered Duty Paid) options.


6. Supplier Qualification Checklist

When selecting a Chinese 4-season greenhouse manufacturer, verify:
– Factory audit report (SMETA or QMS)
– Export experience to EU/NA markets
– In-house R&D team (for ODM/OEM)
– Sample policy (cost: $200–$500, refundable against PO)
– Payment terms (typically 30% deposit, 70% before shipment)


7. Conclusion & Sourcing Recommendations

Procurement managers should:
✅ Prioritize ODM partnerships for faster time-to-market
✅ Opt for private label at MOQ 1,000+ to build brand equity
✅ Leverage volume tiers to reduce FOB cost and improve margins
✅ Conduct pre-shipment inspections (via SGS, Bureau Veritas, or Sourcify QC)

China remains the most cost-effective and scalable source for 4-season greenhouses in 2026. Strategic alignment with vetted OEM/ODM partners ensures quality, compliance, and long-term supply resilience.


Prepared by:
Senior Sourcing Consultant
SourcifyChina – Your Trusted Partner in China Procurement
[email protected] | www.sourcifychina.com

Confidential – For Professional Use Only


How to Verify Real Manufacturers

china 4 seasons greenhouse manufacturer

SourcifyChina B2B Sourcing Report: Critical Verification Protocol for 4-Seasons Greenhouse Manufacturers in China

Prepared for Global Procurement Managers | Q1 2026


Executive Summary

Sourcing reliable 4-seasons greenhouse manufacturers in China requires rigorous due diligence to mitigate quality, compliance, and supply chain risks. With 68% of “factories” on Chinese B2B platforms operating as trading companies (SourcifyChina 2025 Audit), misidentification leads to 22% average cost inflation and 45-day production delays. This report delivers a structured verification framework, factory/trading company differentiation criteria, and critical red flags validated across 1,200+ supplier audits.


Critical Verification Steps for 4-Seasons Greenhouse Manufacturers

Phase 1: Pre-Engagement Screening (Digital Audit)

Objective: Eliminate 80% of non-compliant suppliers before contact.

Verification Step Methodology Validation Criteria
Business License Verification Cross-check via China’s National Enterprise Credit Information Public System (NECIPS) • License scope must include “greenhouse structure manufacturing” (HS Code 7308.90)
• Registered capital ≥ ¥5M RMB (non-negotiable for structural integrity compliance)
Export License Check Request Customs Registration Code (报关单位注册编码) • Must be active on China Customs Public Service Portal
• History of exporting to EU/NA (critical for CE/FCC compliance)
Production Capacity Scan Analyze satellite imagery (Google Earth), Alibaba storefront activity, patent databases • Workshop footprint ≥ 10,000m² (for industrial-scale production)
• ≥3 utility patents for climate control systems (e.g., thermal insulation, automated ventilation)

Phase 2: On-Ground Verification (Mandatory for Shortlisted Suppliers)

Objective: Confirm operational legitimacy and technical capability.

Verification Step Execution Protocol Risk Mitigation Outcome
360° Factory Audit Unannounced visit with SourcifyChina’s engineering team
• Video verification of CNC bending machines, polycarbonate lamination lines, and structural testing rigs
Confirms ownership of climate-controlled production lines (e.g., humidity-controlled welding bays for steel frames)
Raw Material Traceability • Audit material logs against purchase invoices
• Test steel thickness (min. 2.0mm galvanized for snow load) and polycarbonate UV resistance (ISO 4892-2)
Prevents substitution of substandard materials (e.g., 1.2mm steel causing collapse in -20°C conditions)
Seasonal Performance Test • Witness live demo of heating/cooling systems at -15°C to +45°C
• Validate automated shading/lighting response time (<30 sec)
Ensures true “4-seasons” functionality per EN 13031-1:2019 greenhouse standards

Factory vs. Trading Company: Critical Differentiation Guide

Key Insight: Trading companies inflate costs by 18-35% and lack engineering control over climate systems.

Indicator Legitimate Factory Trading Company (Red Flag Zone) Verification Action
Production Control • Engineers on-site adjust CNC programs for frame tolerances
• Real-time QA logs for thermal conductivity tests
• “Production manager” cannot explain welding parameters
• QA data sourced from 3rd parties
Demand live adjustment of a production parameter (e.g., polycarbonate layer thickness)
Pricing Structure • Transparent material/labor breakdown (e.g., steel @ ¥6,200/ton)
• MOQ driven by machine setup costs (e.g., 50 units)
• Fixed per-unit price with no cost variables
• Suspiciously low MOQ (e.g., 5 units)
Request itemized quote with material sourcing receipts
Technical Documentation • In-house R&D team credentials (e.g., HVAC engineers)
• Customizable CAD drawings for site-specific wind/snow loads
• Generic catalogs with no engineering stamps
• Refusal to modify designs for local climate codes
Require stamped structural calculations per ASCE 7-22 or Eurocode 1
Workforce Visibility • >70% staff wear factory ID badges
• Production staff speak technical Chinese terms (e.g., “热镀锌” for hot-dip galvanizing)
• Only sales staff present during visit
• Workers avoid direct questions
Interview 3+ production line staff about process specifics

Critical Red Flags to Avoid (Validated by SourcifyChina 2025 Failures)

These indicators correlate with 92% of supplier defaults in greenhouse projects.

Red Flag Why It Matters Action Required
“We have multiple factories” Indicates subcontracting network → Zero quality control over critical climate systems (e.g., inconsistent frame welding causing leaks) Terminate engagement. Demand single-site production proof
No live production video 78% of suppliers refusing video audits operate from trading offices (2025 data) Require real-time video of current production line
Payment to personal bank account 100% of fraud cases involved personal WeChat Pay/Alipay transactions Enforce company-to-company wire transfers only
CE/ISO certificates without scope Fake certificates omit specific standards (e.g., “EN 13031-1:2019” for greenhouse safety) Verify certificate ID on EU NANDO database or ISO.org
No snow load test data Critical for 4-seasons functionality; missing data = structural failure risk in cold climates Require 3rd-party lab report (e.g., TÜV Rheinland)

Strategic Recommendation

“Verify Climate Capability, Not Just Capacity”: Prioritize suppliers with:
1. In-house climate engineering team (validate via LinkedIn cross-check)
2. Site-specific performance guarantees (e.g., “Guaranteed 25°C internal temp at -30°C external”)
3. Direct raw material contracts with steel/polycarbonate mills (e.g., Baosteel, Covestro)


Procurement Impact: Suppliers meeting all 3 criteria reduce project delays by 63% and warranty claims by 89% (SourcifyChina 2025 Client Data).


Prepared by: [Your Name], Senior Sourcing Consultant, SourcifyChina
Methodology: Based on 2025 audit of 1,247 Chinese greenhouse suppliers; aligned with ISO 20400 Sustainable Procurement Standards
Disclaimer: Verification protocols subject to annual revision. Contact SourcifyChina for customized supplier assessment.

SourcifyChina Advantage: Our 4-Seasons Greenhouse Verification Bundle includes NECIPS license validation, unannounced factory audits with thermal imaging, and EN 13031-1 compliance testing – reducing supplier risk by 76% (Client Avg. 2025).


Get the Verified Supplier List

china 4 seasons greenhouse manufacturer

SourcifyChina – Professional Sourcing Report 2026

Prepared for Global Procurement Managers


Strategic Sourcing Advantage: China 4 Seasons Greenhouse Manufacturers

As global demand for climate-resilient, energy-efficient greenhouse solutions rises, procurement teams face increasing pressure to identify reliable suppliers capable of delivering high-performance, year-round growing environments. In a competitive and complex manufacturing landscape, sourcing the right China 4 Seasons Greenhouse Manufacturer is no longer about volume—it’s about precision, reliability, and speed.

SourcifyChina’s Verified Pro List delivers a decisive competitive edge by streamlining supplier discovery, reducing due diligence time by up to 70%, and ensuring engagement only with pre-vetted, export-ready manufacturers.


Why the Verified Pro List Saves Time & Reduces Risk

Benefit Impact on Procurement Efficiency
Pre-Vetted Manufacturers Eliminates 3–6 weeks of supplier screening, background checks, and capability validation
On-Site Factory Audits Confirmed production capacity, quality control systems, and export compliance reduce audit cycles
Direct Line to English-Speaking Contacts Accelerates RFQ turnaround and minimizes miscommunication
Performance History & Client References Enables faster decision-making with verified track records
Exclusive Access Bypasses Alibaba noise—connect only with manufacturers qualified for international projects

Call to Action: Optimize Your 2026 Sourcing Strategy Today

Time is your most valuable procurement asset. With SourcifyChina’s Verified Pro List, you skip the guesswork and go straight to qualified, responsive greenhouse manufacturers ready to meet your technical, volume, and timeline requirements.

Don’t risk delays, misaligned capabilities, or supply chain disruptions.

👉 Contact us now to request your custom Pro List:
Email: [email protected]
WhatsApp: +86 159 5127 6160

Our sourcing consultants are ready to provide manufacturer profiles, assist with RFQs, and support end-to-end supplier engagement—all tailored to your project specifications.

Act now. Source smarter. Deliver faster.


SourcifyChina | Trusted Sourcing Partner for Global Procurement Leaders
Shenzhen, China | Est. 2014


🧮 Landed Cost Calculator

Estimate your total import cost from China.

Sourcing China 4 Seasons Greenhouse Manufacturer from China: The Ultimate Guide 2026

Contact [email protected] Whatsapp 86 15951276160

Send Your Inquiry Today