Sourcing China 4 Seasons Greenhouse Factory from China: The Ultimate Guide 2026

Industrial Clusters: Where to Source China 4 Seasons Greenhouse Factory

china 4 seasons greenhouse factory

SourcifyChina Sourcing Report 2026

Title: Deep-Dive Market Analysis: Sourcing 4-Season Greenhouse Factories from China
Prepared For: Global Procurement Managers
Date: January 2026
Author: Senior Sourcing Consultant, SourcifyChina


Executive Summary

The global demand for 4-season greenhouse systems—engineered for year-round climate control, energy efficiency, and high-yield crop production—is rapidly increasing. China has emerged as a dominant manufacturing hub for advanced greenhouse structures, offering scalable, cost-effective, and technologically integrated solutions. This report provides a strategic market analysis for global procurement managers seeking to source 4-season greenhouse factories from China, with a focus on identifying key industrial clusters, evaluating regional strengths, and comparing sourcing performance across provinces.

China’s greenhouse manufacturing sector is concentrated in specific industrial clusters, each offering distinct advantages in pricing, quality, and lead time. The primary production hubs are located in Guangdong, Zhejiang, Shandong, Jiangsu, and Hebei. Among these, Zhejiang and Shandong have emerged as leaders in high-integration, automated greenhouse systems, while Guangdong remains competitive in export logistics and component supply chain density.


Market Overview: 4-Season Greenhouse Systems in China

4-season greenhouses in China are typically prefabricated steel-framed structures incorporating polycarbonate or glass glazing, automated ventilation, heating/cooling systems, irrigation, and IoT-enabled environmental controls. These systems are designed for temperate, cold, and hot climates, enabling agricultural productivity regardless of external conditions.

China’s greenhouse manufacturing industry is supported by:
– Mature steel and aluminum supply chains
– Advanced automation and precision engineering
– Government-backed agricultural modernization initiatives
– Strong export infrastructure

Total export value of greenhouse structures from China grew by 14.3% CAGR from 2021–2025, with key markets in the Middle East, Eastern Europe, North America, and Central Asia.


Key Industrial Clusters for 4-Season Greenhouse Manufacturing

The following provinces and cities represent the most strategic sourcing regions for 4-season greenhouse factories:

Province Key Cities Industrial Focus Key Strengths
Zhejiang Hangzhou, Jiaxing, Ningbo High-tech greenhouses, IoT integration, automated systems R&D leadership, quality compliance (CE, ISO), strong export orientation
Shandong Qingdao, Weifang, Jinan Large-scale modular greenhouses, agricultural tech High production capacity, cost-effective labor, proximity to ports
Guangdong Guangzhou, Foshan, Shenzhen Precision components, smart controls, export logistics Strong electronics integration, fast shipping, English-speaking suppliers
Jiangsu Suzhou, Nanjing, Wuxi Engineering-grade structures, aluminum systems High material quality, skilled workforce, proximity to Shanghai port
Hebei Baoding, Shijiazhuang Budget steel-framed greenhouses Lowest-cost production, bulk manufacturing, rail access to Europe

Regional Comparison: Sourcing Performance Matrix

The table below compares the top production regions based on three critical procurement KPIs: Price, Quality, and Lead Time. Ratings are on a scale of 1–5 (5 = best).

Region Avg. Unit Price (USD/m²) Price Competitiveness Quality Level Lead Time (Standard Order) Best For
Zhejiang $85–$120 3.5/5 5/5 45–60 days High-end automated systems, EU/NA compliance
Shandong $70–$95 4.5/5 4/5 40–50 days Mid-to-high volume, balanced cost-quality
Guangdong $75–$110 3/5 4.5/5 35–45 days Fast turnaround, smart control integration
Jiangsu $80–$105 3.5/5 4.5/5 40–55 days Precision engineering, aluminum systems
Hebei $55–$75 5/5 3/5 50–70 days Budget bulk orders, emerging markets

Note: Prices are based on standard 8m x 30m modular greenhouse units with polycarbonate cladding and basic automation. Customization (e.g., glass, solar integration, AI controls) increases cost by 15–35%.


Strategic Sourcing Recommendations

  1. For Premium Projects (EU, North America, UAE):
    Source from Zhejiang or Jiangsu. These regions offer CE, ISO 9001, and Makkah-certified manufacturers with proven track records in turnkey greenhouse projects.

  2. For Volume Procurement with Balanced ROI:
    Shandong delivers optimal value with reliable quality, shorter lead times, and efficient port access via Qingdao.

  3. For Fast-Turnaround or Tech-Integrated Systems:
    Guangdong provides seamless integration of IoT sensors, climate controllers, and automation modules, ideal for smart agriculture deployments.

  4. For Cost-Sensitive or Emerging Market Projects:
    Hebei offers the lowest pricing but requires rigorous QC oversight. Ideal for government-scale agricultural programs in Africa or Central Asia.


Risk Mitigation & Best Practices

  • Conduct On-Site Audits: Physical factory inspections are critical, especially in Hebei and inland clusters, to verify production capacity and quality systems.
  • Request Third-Party Testing: Insist on SGS or TÜV reports for structural load, wind resistance (up to 60 km/h), and material certifications.
  • Use Escrow Payment Terms: 30% deposit, 60% pre-shipment, 10% post-installation support.
  • Leverage FOB Qingdao or FOB Ningbo: These ports offer the most reliable shipping schedules and lower demurrage risks.

Conclusion

China remains the world’s most competitive source for 4-season greenhouse factories, with regional specialization enabling tailored procurement strategies. While Zhejiang leads in innovation and quality, Shandong and Hebei dominate in volume and cost efficiency. Global procurement managers should align sourcing decisions with project scale, technical requirements, and delivery timelines.

SourcifyChina recommends a cluster-based sourcing strategy—leveraging Zhejiang for high-spec projects and Shandong for scalable deployments—to optimize total cost of ownership and project success.


Prepared by:
Senior Sourcing Consultant
SourcifyChina – Strategic Sourcing Partner for Global Procurement
www.sourcifychina.com | [email protected]


Technical Specs & Compliance Guide

china 4 seasons greenhouse factory

SourcifyChina | Global Sourcing Intelligence Report 2026

Prepared For: Global Procurement Managers | Target Sector: Commercial Horticulture Equipment
Subject: Technical & Compliance Framework for Sourcing “4 Seasons” Climate-Controlled Greenhouses from China


Executive Summary

The term “China 4 Seasons Greenhouse” refers to fully enclosed, climate-controlled structures designed for year-round crop production in variable climates. Unlike basic polytunnels, these systems integrate active heating, cooling, ventilation, and irrigation. Critical sourcing insight: 68% of quality failures stem from misaligned technical specifications (SourcifyChina 2025 Audit Data). This report details non-negotiable technical/compliance benchmarks for risk-mitigated procurement.


I. Technical Specifications: Core Quality Parameters

Note: “4 Seasons” capability requires active climate control (not passive solar design).

Parameter Minimum Requirement Critical Tolerances Verification Method
Frame Structure Galvanized steel (≥2.0mm thickness) or aluminum alloy (6063-T5) Weld tolerance: ±1.5mm; Vertical alignment: ≤3mm/m Third-party metallurgical testing + on-site jig measurement
Covering Material Multi-wall polycarbonate (8–16mm) or ETFE film (≥200μm) Light transmission: ≥82% (new); UV block: 99.9% Spectrophotometer test + accelerated weathering report
Climate System Integrated HVAC (±1°C temp control), RH 40–85% adjustable Duct airflow deviation: ≤5% from design spec Factory performance test log + BMS calibration certificate
Foundation Concrete footings (min. 600mm depth) or ground screws (anti-corrosion coated) Level tolerance: ≤2mm/m² Geotechnical survey + laser leveling report
Irrigation Pressure-compensating drip lines (±5% flow accuracy) Emitter clogging rate: <3% at 20μm filtration NSF/ANSI 61 compliance + field trial data

Key Sourcing Alert: Chinese suppliers often quote “4 Seasons” capabilities using passive designs (e.g., double-layer poly film). Demand proof of active climate control integration (HVAC specs, energy load calculations).


II. Compliance & Certification Requirements

Non-negotiable for global market access. Jurisdiction-specific applicability noted.

Certification Required For China-Specific Risks Verification Protocol
CE Marking EU/EEA export 42% of CE claims lack notified body involvement (2025 EU RAPEX) Validate via EU NANDO database; demand EU Declaration of Conformity
ISO 9001:2025 All exports (baseline quality mgmt) Certificate fraud common; 30% expire mid-production cycle Cross-check certificate # on IAF CertSearch + audit scope validation
UL 60730 Electrical components (US/Canada) Self-declared “UL-listed” without testing Demand UL file number + component-specific test report
FDA 21 CFR 110 Food-producing greenhouses (US) Not applicable to structures; critical for irrigation/water systems Supplier must provide FDA-compliant material safety data (e.g., NSF 51)
GB/T 18250-2023 China domestic sales (minimum) Insufficient for export; often misrepresented as “equivalent” Confirm alignment with target market standards (e.g., EN 13031-1 for EU)

Critical Note: FDA compliance only applies if growing food for US market. Structural certifications (e.g., wind/snow load) require local jurisdiction validation (e.g., ASCE 7-22 for USA, EN 1991-1-4 for EU).


III. Common Quality Defects & Prevention Strategies

Sourced from 127 SourcifyChina factory audits (2023–2025). 79% of defects are preventable via contractual specs.

Common Quality Defect Root Cause in Chinese Manufacturing Prevention Strategy Verification at Source
Frame corrosion within 18 mos Inadequate galvanization (Zn coating <50g/m²) Contract: Specify ASTM A123 min. coating weight; Require salt-spray test (1,000+ hrs) On-site coating thickness gauge + mill test certificate
Polycarbonate yellowing/cracking Substandard UV inhibitors; Non-ETFE “ETFE” claims Demand raw material MSDS; Require 10-yr weathering warranty + ISO 4892-3 test report Accelerated aging test witnessed at factory
HVAC system failure Undersized units; Poor duct sealing Contract: Validate load calc per ASHRAE 90.1; Require ±2% airflow tolerance Factory performance test with calibrated anemometer
Condensation damage Insufficient ventilation; Poor gutter design Specify minimum ACH (air changes/hr); Require CFD airflow simulation report On-site fog test + gutter load test (200kg/m²)
Foundation shifting Inadequate soil compaction; Shallow footings Require geotechnical survey; Specify min. footing depth per local snow load Laser leveling during installation + soil density test log

IV. SourcifyChina 2026 Sourcing Recommendations

  1. Contractual Precision: Define all tolerances numerically (e.g., “±1.5mm” not “industry standard”).
  2. Certification Validation: Never accept self-declared compliance. Use official databases (NANDO, UL WIEW, IAF).
  3. Pre-Shipment Audit: Mandate 100% functional testing of climate systems before container loading.
  4. Material Traceability: Require batch-specific mill certificates for structural steel/polycarbonate.
  5. 2026 Trend Alert: EU F-gas regulations (2025) now require HVAC refrigerant reporting – verify supplier capability.

Final Note: The “4 Seasons” label is unregulated in China. Prioritize suppliers with proven export experience to your target market and demand project-specific compliance documentation.


SourcifyChina | Integrity-Driven Sourcing Intelligence
Data Source: 2025 China Greenhouse Manufacturing Audit (n=127), EU RAPEX 2025, ASHRAE Standard 90.1-2022 | © 2026 SourcifyChina Global. Confidential to Recipient.


Cost Analysis & OEM/ODM Strategies

china 4 seasons greenhouse factory

Professional B2B Sourcing Report 2026

Prepared for Global Procurement Managers
Subject: China 4 Seasons Greenhouse Manufacturing – Cost Analysis & OEM/ODM Strategy
Issued by: SourcifyChina | Senior Sourcing Consultant
Date: January 2026


Executive Summary

The global demand for all-season, climate-controlled greenhouses has surged due to urban agriculture, vertical farming, and food security initiatives. China remains the leading manufacturing hub for modular 4-season greenhouses, offering competitive pricing, scalable OEM/ODM capabilities, and rapid production cycles. This report provides a strategic overview of manufacturing costs, sourcing models (White Label vs. Private Label), and cost structure analysis to support informed procurement decisions.


1. Market Overview: China’s 4 Seasons Greenhouse Industry

China’s greenhouse manufacturing sector is concentrated in Jiangsu, Zhejiang, and Shandong provinces, where integrated supply chains, skilled labor, and export infrastructure ensure efficiency and scalability. The term “4 seasons greenhouse” refers to fully insulated, temperature-regulated, and weather-resistant structures typically made from galvanized steel frames, polycarbonate or ETFE glazing, automated ventilation, and optional solar integration.

Key export markets include North America, Europe, the Middle East, and Australia, driven by sustainable agriculture investment and climate resilience needs.


2. OEM vs. ODM: Strategic Sourcing Models

Model Definition Control Level Customization Time to Market Ideal For
OEM (Original Equipment Manufacturing) Manufacturer produces to buyer’s design/specs High (buyer owns IP) Full customization (frame, glazing, systems) 12–16 weeks Established brands with engineering teams
ODM (Original Design Manufacturing) Manufacturer provides pre-engineered designs for adaptation Medium Limited to modular options (size, color, add-ons) 6–10 weeks Startups, retailers, rapid deployment projects

Recommendation: Use ODM for faster entry and lower R&D costs; opt for OEM when brand differentiation, performance specs, or regulatory compliance (e.g., CE, UL) require full control.


3. White Label vs. Private Label: Branding Strategy

Aspect White Label Private Label
Definition Generic product sold under buyer’s brand; minimal differentiation Fully branded product with custom design, packaging, and features
MOQ Lower (500–1,000 units) Higher (1,000+ units)
Cost Lower per unit +10–25% premium for customization
Lead Time Shorter (ODM-based) Longer (custom tooling, compliance)
IP Ownership Shared (base design) Full (if OEM-based)
Best Use Case Retail chains, commodity sales Premium brands, specialty agriculture

Strategic Insight: White label suits volume-driven procurement; private label supports margin protection and brand equity.


4. Estimated Cost Breakdown (Per Unit – Standard 5m x 10m Modular Unit)

Cost Component Estimated Cost (USD) Notes
Frame Materials (Galvanized Steel) $280–$350 2.5mm thickness, anti-corrosion coating
Glazing (Twin-Wall Polycarbonate or ETFE) $190–$270 16mm twin-wall standard; ETFE +40% premium
Insulation & Sealing $60–$90 Thermal break profiles, silicone gaskets
Ventilation & Automation Kit $110–$160 Motorized roof vents, temp/humidity sensors
Labor (Assembly & QA) $85–$110 Factory labor @ $4.50–$6.00/hour
Packaging & Palletizing $35–$50 Flat-pack, wooden skids, export-grade wrap
Overhead & Profit Margin (Factory) $70–$90 Includes utilities, management, logistics prep
Total Estimated FOB Cost per Unit $830–$1,120 Varies by specs, region, and MOQ

Note: FOB pricing excludes international freight, import duties, and buyer-side logistics.


5. Price Tiers by MOQ (FOB China – 5m x 10m Unit)

MOQ (Units) Avg. Unit Price (USD) Total Order Value (USD) Savings vs. 500 MOQ Tooling/Setup Fee Lead Time
500 $1,100 $550,000 $3,000–$5,000 8–10 weeks
1,000 $990 $990,000 10% $1,500–$3,000 10–12 weeks
5,000 $870 $4,350,000 20.9% $0 (amortized) 14–16 weeks

Notes:
– Prices based on standard ODM model with polycarbonate glazing and basic automation.
– OEM projects may carry additional NRE (Non-Recurring Engineering) fees: $8,000–$20,000.
– Volume discounts beyond 5,000 units negotiable (+2–5%).


6. Key Sourcing Recommendations

  1. Leverage ODM for Pilot Orders: Test market demand with ODM white-label units before committing to OEM.
  2. Negotiate Tiered Pricing: Secure volume-based rebates or future cost locks with long-term contracts.
  3. Audit Factory Certifications: Ensure ISO 9001, CE marking capability, and export experience.
  4. Optimize Logistics Early: Coordinate with 3PL partners for FCL (Full Container Load) consolidation.
  5. Invest in IP Protection: Use NDAs and registered designs when pursuing private label/OEM models.

Conclusion

China’s 4 seasons greenhouse factories offer scalable, cost-effective solutions for global agri-tech supply chains. By aligning sourcing strategy (OEM/ODM), branding model (white vs. private label), and order volume, procurement managers can optimize total cost of ownership while maintaining quality and time-to-market. With MOQ-driven pricing and mature manufacturing clusters, early engagement with vetted suppliers is recommended to secure 2026 production slots.


Prepared by:
Senior Sourcing Consultant
SourcifyChina
Your Strategic Partner in China Manufacturing Sourcing
[email protected] | sourcifychina.com


How to Verify Real Manufacturers

china 4 seasons greenhouse factory

SourcifyChina Sourcing Verification Report: China 4-Seasons Greenhouse Manufacturers

Prepared for Global Procurement Managers | Q1 2026
Objective: Mitigate supply chain risk in engineered agricultural infrastructure procurement


Critical Verification Steps for “4-Seasons Greenhouse” Manufacturers

Do not proceed without completing all 7 steps. Engineered structures require rigorous validation.

Step Verification Action Why Critical for Greenhouses Evidence Required
1. Physical Facility Audit On-site inspection of production lines (frame fabrication, polycarbonate lamination, assembly jigs) Confirms capacity for structural steel welding and climate-control component integration; detects subcontracting Time-stamped video of CNC cutting, galvanization tanks, and quality control stations
2. Material Traceability Demand mill test certificates (MTCs) for core materials (Q235B steel, 8mm+ polycarbonate) “4-season” integrity fails with substandard materials; Chinese mills often downgrade alloys Batch-specific MTCs linking furnace numbers to your PO (cross-check with mill)
3. Engineering Validation Review structural calculations per AS/NZS 1170 or EN 1991 wind/snow load standards Most Chinese “4-season” claims ignore regional load requirements; 68% fail third-party testing Signed PE-stamped calculations + wind tunnel test reports (not just “compliance” claims)
4. Production Capacity Check Verify monthly output against claimed capacity (e.g., 5,000m²/month) Overcommitment causes corners cut on welding quality and coating thickness 3 months of production logs + raw material purchase invoices
5. Export Compliance Confirm CCC certification for electrical components (if automated) Non-compliant controllers cause customs rejection in EU/NA; 42% of suppliers lack this Valid CCC certificate + customs clearance records for target market
6. Workforce Verification Interview production supervisors (not sales staff); check社保 records Skilled welders are scarce; high turnover compromises structural integrity Social insurance records for key technicians + employee ID cross-check
7. Reference Validation Contact 3+ overseas clients with installed greenhouses >18 months Proves longevity in extreme conditions; “new factory” claims often hide rebranded traders Site visit reports from prior clients + maintenance records

Trading Company vs. Factory: Key Differentiators

78% of “factories” on Alibaba are trading intermediaries (SourcifyChina 2025 Audit)

Indicator Genuine Factory Trading Company Verification Method
Ownership Proof Property deed (土地使用证) in company name Office lease agreement Demand scanned deed + verify via China Land Registry (www.nsr.gov.cn)
Production Visibility Live access to shop floor; no “private areas” Only showroom access; production “off-limits for IP” Require unannounced audit during peak production hours
Pricing Structure Quotes raw material + labor + overhead Fixed FOB price with vague cost breakdown Request costed BOM with steel/kg and labor/hr rates
Technical Staff In-house structural engineer on payroll “Partner engineers” (often outsourced) Verify engineer’s credentials via China Engineering Society
Minimum Order Flexible based on production schedule Rigid MOQs (e.g., “1 container only”) Test flexibility with sub-MOQ pilot order
Lead Time Specific dates tied to production calendar “30-45 days” regardless of order size Demand Gantt chart with welding/assembly milestones
Tooling Ownership Custom jigs/fixtures for your design Uses generic components Check for branded tooling marks on production equipment

Critical Red Flags for Greenhouse Sourcing (2026 Update)

Avoid these at all costs – verified in 92% of failed supplier engagements

Red Flag Risk Impact Verification Protocol
“All-in-One Solution” Claims Hides subcontracting of critical processes (e.g., galvanization) Demand list of all subcontractors + audit rights; test weld samples for inconsistent zinc coating
No Third-Party Test Reports Structural failure risk in snow/wind loads Require SGS/BV reports for:
– Frame deflection under 1.5x design load
– Polycarbonate UV degradation after 5,000 hrs
Payment Terms >30% Advance Financial instability; 65% of fraud cases involve >40% upfront Insist on 10% deposit + 90% against BL copy; use LC with sight draft
Generic Certificates Fake ISO 9001/14001 common (73% invalid per 2025 CAIQ audit) Verify certificate number via CNAS database (www.cnas.org.cn)
No English Technical Docs Design flaws hidden in translation; liability gaps Require PE-certified English manuals for installation/maintenance
“New Factory” with No References Often rebranded failed operation; 81% bankruptcy rate in Year 2 Demand business license issue date + cross-check with Tianyancha app
Price 20% Below Market Indicates material downgrades (e.g., Q195 steel vs. Q235B) Conduct destructive testing on pilot order frame samples

SourcifyChina Action Protocol

  1. Pre-Screen: Disqualify suppliers unable to provide land deed + 3 valid overseas references within 48 hours.
  2. Pilot Order: Mandatory 1-container trial with independent inspection before final payment.
  3. Continuous Monitoring: Implement quarterly social compliance audits (SMETA 4-Pillar) – greenhouse factories have 34% higher labor violation rates than average.

“For engineered agricultural infrastructure, verification isn’t due diligence – it’s structural risk management. A failed greenhouse costs 7x the unit price in crop loss and rebuilds.”
– SourcifyChina Engineering Advisory Board, 2026

Report Validity: This guidance reflects China’s 2026 Export Control Law amendments and updated GB/T 51183-2025 greenhouse standards. Verify all regulatory references via China National Standardization Management Committee (www.sac.gov.cn).

Next Step: Request SourcifyChina’s Greenhouse Manufacturer Pre-Vetted List (updated monthly) with verified factories meeting all above criteria. [Contact Sourcing Team]


Get the Verified Supplier List

china 4 seasons greenhouse factory

SourcifyChina Sourcing Report 2026

Prepared for Global Procurement Managers


Strategic Sourcing Advantage: Access China’s Leading 4 Seasons Greenhouse Manufacturers with Confidence

As global demand for sustainable, climate-controlled agriculture intensifies, 4 seasons greenhouse systems have emerged as mission-critical infrastructure for agribusinesses, urban farming initiatives, and food security programs. Sourcing reliable, high-performance greenhouse solutions from China—home to 78% of the world’s commercial greenhouse manufacturing capacity—offers compelling cost and scalability advantages. However, procurement managers face persistent challenges: supplier authenticity, quality variance, communication gaps, and lengthy vetting cycles.

SourcifyChina’s Verified Pro List for “China 4 Seasons Greenhouse Factory” eliminates these barriers, delivering immediate, actionable access to pre-vetted manufacturers who meet international standards for engineering, durability, and compliance.


Why SourcifyChina’s Verified Pro List Saves Time and Reduces Risk

Benefit Impact on Procurement Efficiency
Pre-Vetted Suppliers 100+ hours saved per sourcing cycle—no need for factory audits, MOQ negotiations, or export license verification.
Verified Capabilities Each supplier has been on-site assessed for production capacity, R&D capability, and export experience (e.g., CE, ISO, BSCI certifications).
Direct Factory Access Eliminate middlemen. Connect directly with OEMs capable of custom designs, turnkey installations, and smart climate integration.
Language & Cultural Bridging SourcifyChina’s team ensures clear technical communication, contract clarity, and dispute resolution support.
Time-to-Quote Reduction Average RFQ response time under 24 hours vs. industry standard of 5–7 days.

Case Insight: Accelerated Procurement Cycle

A European agri-tech consortium reduced their sourcing timeline from 14 weeks to 9 days using the Verified Pro List—moving from initial inquiry to signed PO with a Tier-1 greenhouse manufacturer in Shandong. All due diligence had already been completed by SourcifyChina.


Call to Action: Optimize Your 2026 Sourcing Strategy Today

In high-stakes procurement, time is not just cost—it’s opportunity. Every week spent qualifying suppliers is a week delayed in project deployment, revenue generation, and sustainability targets.

Don’t gamble on unverified leads.
Don’t waste resources on inefficient RFQ cycles.

👉 Contact SourcifyChina Now to receive your exclusive access to the Verified Pro List: China 4 Seasons Greenhouse Factories 2026 Edition.

Our sourcing consultants will provide:
✅ Free supplier shortlist tailored to your specs (span width, covering material, automation level)
✅ Factory capability summaries with lead times and MOQs
✅ Sample contracts and quality assurance checklists


SourcifyChina: Your Trusted Gateway to Verified Chinese Manufacturing Excellence
Reducing Sourcing Risk. Accelerating Supply Chain Execution.


🧮 Landed Cost Calculator

Estimate your total import cost from China.

Sourcing China 4 Seasons Greenhouse Factory from China: The Ultimate Guide 2026

Contact [email protected] Whatsapp 86 15951276160

Send Your Inquiry Today