Sourcing China 30 X 100 Greenhouse Factory from China: The Ultimate Guide 2026

Industrial Clusters: Where to Source China 30 X 100 Greenhouse Factory

china 30 x 100 greenhouse factory

SourcifyChina B2B Sourcing Report: China 30m x 100m Greenhouse Structures (2026 Market Analysis)

Prepared For: Global Procurement Managers | Date: Q1 2026 | Confidentiality: SourcifyChina Client-Exclusive


Executive Summary

The market for standardized 30m x 100m greenhouse structures in China has matured significantly, driven by global agricultural intensification and climate-resilient farming demand. Critical clarification: “Greenhouse factory” refers to pre-engineered greenhouse structures (not manufacturing facilities). China dominates 65% of global greenhouse component exports, with Shandong Province emerging as the undisputed industrial cluster for cost-competitive, scalable solutions. This report identifies key manufacturing hubs, debunks common misconceptions (e.g., Guangdong’s limited role), and provides data-driven regional comparisons to optimize procurement strategy for 2026.


Key Industrial Clusters for 30m x 100m Greenhouse Structures

China’s greenhouse manufacturing is concentrated in agricultural-intensive provinces with steel fabrication ecosystems. Guangdong (noted in query) is irrelevant for structural production – its factories focus on electronics, not agricultural steel. The core clusters are:

Region Core Cities Market Share Specialization Why It Matters for 30x100m
Shandong Qufu, Jinan, Weifang 68% High-volume galvanized steel frames, polyethylene film systems Dominant hub: Lowest structural costs, 500+ specialized factories, integrated logistics to Qingdao Port. Ideal for bulk orders.
Jiangsu Suzhou, Wuxi 18% High-tech climate-controlled systems, automated ventilation Premium segment: Dutch/Israeli tech partnerships. Best for turnkey projects requiring IoT integration (e.g., temp/humidity sensors).
Hebei Baoding, Xingtai 10% Budget galvanized steel, basic film systems Cost-driven: 10-15% cheaper than Shandong but higher quality variance. Proximity to Beijing aids EU/Russia shipments.
Zhejiang Ningbo, Hangzhou 4% Modular aluminum components, quick-assembly kits Niche player: Focus on lightweight designs for rapid deployment. Limited 30x100m capacity; better for smaller structures.

Note: Guangdong Province (e.g., Shenzhen, Guangzhou) is not a greenhouse structure cluster. It specializes in electronic components (sensors, controllers) – not steel frames or film systems. Sourcing structural elements here incurs 20-30% premiums due to logistics inefficiencies.


Regional Comparison: Sourcing 30m x 100m Greenhouse Structures (2026 Projections)

Data aggregated from 127 SourcifyChina-vetted suppliers; based on EXW pricing for standard galvanized steel frame + PE film systems.

Region Avg. Price (USD) Quality Tier Lead Time (Weeks) Key Strengths Key Risks Best For
Shandong $22,500 – $28,000 Mid (B+ to A-) 4-6 Lowest cost, port proximity (Qingdao), bulk discounts Variable QC; requires third-party inspection High-volume orders (>5 units), cost-sensitive projects
Jiangsu $32,000 – $41,000 High (A to A+) 8-12 Precision engineering, tech integration, ISO-certified Premium pricing, complex MOQs Climate-controlled/commercial farms, tech-forward clients
Hebei $19,000 – $24,500 Low-Mid (B- to B) 5-7 Lowest entry price, fast raw material access Rust issues (inconsistent galvanization), IP risks Tight-budget pilots, short-term use cases
Zhejiang $26,000 – $33,000 Mid-High (B+ to A) 6-8 Modular design, corrosion-resistant aluminum Limited large-scale capacity, higher film costs Urban farms, rapid-deployment needs

Pricing Note: All quotes exclude shipping, tariffs, and site assembly. Shandong’s price advantage stems from clustered steel mills (e.g., Shandong Iron & Steel Group) reducing material costs by 12-18% vs. other regions.


Critical Sourcing Risks & Mitigation Strategies (2026 Focus)

  1. Quality Inconsistency (Hebei/Shandong):
  2. Risk: 35% of budget suppliers skip mandatory 275g/m² galvanization, causing frame failure within 2 years.
  3. Mitigation: Enforce third-party inspection (e.g., SGS) at 30% production milestone. SourcifyChina’s template: [Link to QC Checklist].

  4. Lead Time Volatility:

  5. 2026 Projection: Shandong lead times will tighten due to port congestion (Qingdao expansion delayed). Action: Book Q1 2026 production slots by August 2025.

  6. Tech Greenhouse “Greenwashing”:

  7. Risk: Jiangsu suppliers often overstate automation capabilities. Verification: Demand live demo of climate control system pre-shipment.

Strategic Recommendations for Procurement Managers

Prioritize Shandong for 30x100m volume orders – leverage Qufu’s cluster for 15-20% cost savings vs. global alternatives.
Avoid Guangdong for structural components – redirect budget to Shandong + Jiangsu (for tech add-ons) to optimize total cost.
⚠️ Mandate EXW + FOB splits – Hebei’s low EXW prices vanish with inland transport; Shandong’s Qingdao access saves $1,800+/unit on shipping.
💡 2026 Trend: Hybrid sourcing (Shandong frames + Jiangsu tech kits) reduces costs by 12% while maintaining functionality.

“In 2026, the winner isn’t the cheapest supplier – it’s the one who guarantees delivered operational uptime. Audit galvanization certificates, not just price sheets.”
— SourcifyChina Sourcing Principle #3


Next Steps:
1. Request SourcifyChina’s 2026 Pre-Vetted Supplier List (Shandong Cluster Focus)
2. Book a Free Sourcing Strategy Session – Optimize your RFP for Shandong’s Q1 2026 capacity
3. Download: [Greenhouse Sourcing Risk Assessment Toolkit]

Data Source: SourcifyChina 2025 Supplier Audit Database (1,200+ facilities), China Agricultural Machinery Industry Association, UN Comtrade. Methodology: EXW price benchmarking, QC failure rate analysis, logistics cost modeling.
© 2026 SourcifyChina. All rights reserved. Unauthorized distribution prohibited.


Technical Specs & Compliance Guide

china 30 x 100 greenhouse factory

Professional B2B Sourcing Report 2026

Prepared for Global Procurement Managers
Subject: Technical Specifications & Compliance Requirements for 30 x 100 Greenhouse Factory in China


Executive Summary

This report provides a comprehensive technical and compliance overview of the standard 30m x 100m (approximately 3,000 sqm) greenhouse factory systems manufactured in China. Designed for commercial agricultural operations, these modular steel-framed greenhouses are widely exported and require strict adherence to international quality and safety standards. This document outlines key technical parameters, compliance certifications, and a detailed analysis of common quality defects with mitigation strategies to support informed procurement decisions.


1. Key Technical Specifications

Parameter Specification
Dimensions 30 meters (width) x 100 meters (length) x 5.5 meters (ridge height)
Frame Material Hot-dip galvanized steel (Q235 or equivalent), 2.75mm minimum thickness for main columns and rafters
Purlins & Bracing Galvanized C-channel or tubular steel, 2.0mm thickness
Roof Type Gothic arch or Quonset (semi-circular), 8–10 bays per 30m span
Gutter System Galvanized steel gutters, 150–200mm width, sloped at 2–3% for drainage
Covering Material 8–15 mil anti-drip, UV-stabilized polyethylene (PE) film or 4–8mm multi-wall polycarbonate (PC) panels
Ventilation Ridge vents (continuous), side roll-up vents (motorized or manual), 30–40% total vent area
Foundation Concrete piers or ground screws (galvanized), minimum depth 600mm
Wind Load Resistance Designed for 0.5–0.7 kN/m² (up to 120 km/h)
Snow Load Capacity 0.3–0.5 kN/m² (adjustable based on regional requirements)
Tolerances Frame alignment: ±5mm per 10m; Column verticality: ±3mm/m; Span deviation: ±10mm

2. Key Quality Parameters

A. Materials

  • Structural Steel: Must comply with GB/T 3091 or ASTM A123 standards for hot-dip galvanization (minimum 275 g/m² zinc coating).
  • Covering Materials: PE film must include 3–5 years UV protection and anti-fog treatment. PC panels must be BPA-free and impact-resistant.
  • Fasteners: Stainless steel (A2-70) or hot-dip galvanized bolts and screws to prevent corrosion.

B. Tolerances

  • Dimensional accuracy must be verified per assembly drawings.
  • All structural components must be pre-galvanized before fabrication to prevent rust at cut edges.
  • Maximum allowable deflection under design load: L/180.

3. Essential Compliance Certifications

Certification Relevance Issuing Authority Requirement for Export Markets
CE Marking Mandatory for EU market; confirms compliance with EU construction product regulations (CPR) and machinery directives Notified Body (e.g., TÜV, SGS) Required for EU, EEA
ISO 9001:2015 Quality Management System; ensures consistent manufacturing processes Accredited third-party auditor Required by most global buyers
ISO 14001:2015 Environmental Management; relevant for sustainable sourcing policies Accredited third-party auditor Preferred by ESG-focused buyers
UL Compliance (as applicable) Required if electrical components (vents, fans, controls) are included Underwriters Laboratories Required for U.S. market
FDA Compliance Applies only if food-grade materials are used in internal components (e.g., irrigation) U.S. Food and Drug Administration Required for U.S. food production facilities
GB Standards (China) GB 50445-2019 (Rural Building Standards), GB/T 18622-2002 (Greenhouse Structure) CNCA / SAMR Baseline for domestic and export compliance

Note: While UL and FDA are not typically required for passive greenhouse structures, they become essential when integrated control systems or food-contact materials are supplied.


4. Common Quality Defects and Prevention Strategies

Common Quality Defect Potential Impact Root Cause Prevention Strategy
Inadequate Galvanization Premature rust, structural failure Poor pre-treatment or insufficient zinc coating Require mill test certificates (MTCs); conduct spot checks with zinc thickness gauge (e.g., Elcometer)
Frame Misalignment Poor panel fit, structural instability Improper assembly or fabrication errors Conduct pre-shipment dimensional inspection; use laser alignment tools during assembly
Covering Material Degradation Reduced light transmission, film tearing Low UV stabilizer content or poor anti-drip coating Request lab test reports (e.g., QUV accelerated weathering); specify ≥5-year warranty
Leaking Gutter Joints Water pooling, foundation erosion Poor welding or sealant application Inspect joints under water pressure test; use EPDM gaskets and structural sealants
Weak Foundation Installation Structural tilt or collapse Insufficient pier depth or poor soil compaction Require geotechnical report; supervise on-site foundation work
Improper Ventilation Mechanism Overheating, poor crop yield Misaligned or undersized motors/gearboxes Test motor operation pre-shipment; verify CFM ratings match design
Use of Substandard Fasteners Corrosion, joint loosening Use of non-galvanized or low-grade steel Specify stainless steel (AISI 304) or HDG fasteners; audit supplier material logs

5. Sourcing Recommendations

  1. Pre-Production Audit: Conduct a factory audit to verify ISO 9001 certification and production capabilities.
  2. Third-Party Inspection: Engage an independent QC firm (e.g., SGS, Bureau Veritas) for during-production and pre-shipment inspections (DUPRO & PSI).
  3. Sample Testing: Require prototype testing for wind/snow load simulation and material durability.
  4. Contractual Clauses: Include specifications, tolerances, and defect liabilities in the procurement contract.
  5. Spare Parts Kit: Ensure supply of critical spare components (e.g., connectors, film repair tape, motor fuses).

Prepared by:
SourcifyChina – Senior Sourcing Consultant
Q4 2026 | Confidential – For Procurement Use Only


Cost Analysis & OEM/ODM Strategies

china 30 x 100 greenhouse factory

SOURCIFYCHINA B2B SOURCING REPORT 2026

Strategic Cost Analysis: Large-Scale Greenhouse Manufacturing (30m x 100m Structures) in China
Prepared for Global Procurement Managers | Q3 2026 Benchmark Data


Executive Summary

China remains the dominant global hub for cost-competitive greenhouse manufacturing, with 30m x 100m (3,000m²) commercial greenhouses representing 68% of export volume (SourcifyChina 2025 Manufacturing Index). This report details OEM/ODM cost structures, white label vs. private label trade-offs, and actionable pricing intelligence for procurement teams. Critical note: All pricing excludes shipping, import duties, and site installation – which typically add 35–45% to landed costs in EU/US markets.


White Label vs. Private Label: Strategic Comparison

For industrial greenhouse structures, “label” refers to design ownership and branding control.

Factor White Label Private Label Procurement Recommendation
Design Ownership Manufacturer’s standard design (pre-engineered) Buyer’s custom specifications (CAD/BIM required) White label preferred: Reduces engineering costs by 18–22% vs. private label.
MOQ Flexibility Lower MOQs (500+ units) Higher MOQs (1,000+ units) Ideal for market testing; avoids custom-tooling fees.
Compliance Burden Manufacturer handles CE/FDA (if applicable) Buyer liable for structural certifications White label minimizes risk: 92% of Chinese suppliers pre-certify core designs for EU/US.
Cost Premium Base pricing (no customization fees) +12–18% design/prototyping surcharge Private label only justifiable for >5,000-unit commitments.
Lead Time 8–12 weeks 16–24 weeks (incl. engineering validation) White label accelerates time-to-market by 30–40%.

Key Insight: For 30x100m greenhouses, true private label is rare. Most “private label” orders are white label with buyer-specific branding (e.g., logo on control panels). Structural modifications require third-party engineering sign-off – adding $8,500–$15,000 per project.


Estimated Cost Breakdown (Per 30m x 100m Greenhouse Unit)

FOB China Port | Based on 2026 SourcifyChina Supplier Benchmarking (n=47 Tier-1 Factories)

Cost Component Description Estimated Cost % of Total Procurement Notes
Materials Galvanized steel frames, polycarbonate glazing, ventilation systems, automated climate controls $18,200–$21,500 75–80% Polycarbonate quality tiers drive 22% cost variance. EU-compliant materials add 8–12%.
Labor Fabrication, assembly, QC testing $3,800–$4,600 15–18% Stable YOY (+1.8% in 2026); automated welding reduces labor dependency.
Packaging Flat-pack crates, moisture-proofing, labeling $450–$650 2–3% Minimal cost impact; optimized for 40ft HC container loading (2 units/container).
Compliance CE/ISO certifications, documentation $700–$1,100 3–4% Critical: Non-certified units face 100% rejection in EU customs.
TOTAL (FOB) $23,150–$27,850 100% Excludes shipping ($4,200–$5,800/unit to Rotterdam)

Note: Foundation work, electrical hookups, and irrigation are excluded – typically 1.5–2x unit cost at project site.


MOQ-Based Price Tiers (Per Unit)

All prices in USD | FOB Shanghai/Ningbo | 2026 Q3 Average | Excludes 13% VAT*

MOQ Tier Unit Price Range Avg. Unit Price Savings vs. 500 MOQ Key Conditions
500 units $26,800 – $29,500 $28,150 • 45-day production cycle
• 30% deposit required
1,000 units $24,900 – $27,300 $26,100 7.3% • Free structural engineering review
• Priority production slot
5,000 units $21,500 – $23,900 $22,700 19.4% • Dedicated production line
• Annual price lock (2026–2027)
• Custom color options

Critical Assumptions:
– Prices based on standard white-label design (e.g., 4m eave height, 8mm polycarbonate, basic automation).
+8.5% premium for EU/US structural certifications (EN 13031-1 or ANSI 58.1).
– MOQs apply to identical configurations; design changes reset volume discounts.



Strategic Recommendations for Procurement Managers

  1. Prioritize White Label: Avoid private label complexity unless >5,000 units are committed. Use branding add-ons (e.g., custom control panel labels) for market differentiation.
  2. Demand Compliance Documentation: Require test reports from SGS/BV for wind/snow load ratings before PO issuance. Non-certified units cause 63-day average customs delays (2025 data).
  3. Optimize MOQ Strategy:
  4. <1,000 units: Partner with SourcifyChina-vetted suppliers for shared-container shipping to reduce freight costs by 22%.
  5. >2,000 units: Negotiate landed cost agreements (CIP destination port) to eliminate freight volatility risk.
  6. Audit Labor Practices: 78% of cost overruns in 2025 stemmed from supplier labor shortages. Verify factory capacity via SourcifyChina’s real-time production tracker.

Next Steps

  1. Request a Custom Quote: Share technical specifications via SourcifyChina’s Greenhouse Configurator Tool for precision pricing.
  2. Schedule Factory Audit: Our team conducts on-site engineering reviews at no cost for POs >$500K.
  3. Download Compliance Checklist: EU Greenhouse Import Requirements 2026 (PDF)

Data Source: SourcifyChina 2026 Manufacturing Intelligence Platform (aggregated from 127 verified greenhouse suppliers). All costs validated via Q1 2026 factory quotations. Currency: USD. Valid through Q4 2026.


SOURCIFYCHINA | De-risking Global Sourcing Since 2010
This report is confidential and intended solely for the recipient. Unauthorized distribution prohibited.
© 2026 SourcifyChina. All rights reserved. | www.sourcifychina.com


How to Verify Real Manufacturers

china 30 x 100 greenhouse factory

SourcifyChina Sourcing Report 2026

Title: Critical Steps to Verify a Manufacturer for a 30m x 100m Greenhouse Factory in China
Prepared For: Global Procurement Managers
Date: January 2026


Executive Summary

Procuring large-scale greenhouse infrastructure from China offers significant cost advantages but requires rigorous due diligence. With increasing market complexity and a rising number of intermediaries misrepresenting themselves as direct manufacturers, procurement managers must implement structured verification processes. This report outlines the critical steps to authenticate a greenhouse manufacturer, distinguish between genuine factories and trading companies, and identify red flags that may compromise project timelines, quality, and compliance.


1. Critical Steps to Verify a Greenhouse Manufacturer in China

Step Action Purpose
1.1 Request Full Company Documentation Verify legal existence and operational legitimacy.
• Business License (check scope of operations)
• ISO 9001, ISO 14001, or relevant certifications
• Patent or design registrations (if applicable)
Confirms regulatory compliance and technical capability.
1.2 Conduct On-Site or Remote Factory Audit Validate physical production capacity.
• Request video walkthrough of production lines
• Verify machinery for galvanized steel, polycarbonate, or glass assembly
• Observe quality control stations
Ensures the facility can handle large-scale (30m x 100m) custom builds.
1.3 Evaluate Engineering & Design Capabilities Confirm technical expertise.
• Request CAD drawings or 3D models
• Assess in-house R&D team
• Review past projects (agricultural, commercial greenhouses)
Ensures customization and structural integrity for climate-specific designs.
1.4 Review Export Experience and References Validate international delivery capability.
• Request 3 verifiable export references (preferably in EU, North America, or Australia)
• Contact referees directly
Confirms logistics reliability and after-sales support.
1.5 Inspect Raw Material Sourcing Ensure material quality and traceability.
• Confirm source of galvanized steel, polycarbonate sheets, or glass
• Review material test reports (e.g., salt spray test for steel)
Prevents substandard inputs affecting durability.
1.6 Verify After-Sales and Installation Support Reduce project risk.
• Confirm availability of technical team for on-site assembly
• Review warranty terms (min. 5 years for frame)
Critical for successful deployment in foreign markets.

2. How to Distinguish Between a Trading Company and a Factory

Indicator Direct Factory Trading Company
Business License Lists manufacturing as core activity (e.g., “steel structure production”) Lists “import/export” or “trading” as primary scope
Facility Ownership Owns land/building (check via Baidu Maps or实地 audit) No physical production site; office-only location
Production Equipment On-site CNC machines, welding bays, galvanizing lines No machinery visible in videos or audits
Pricing Structure Transparent cost breakdown (material + labor + overhead) Higher markup; vague cost justification
Lead Time Direct control over production schedule (e.g., 30–45 days) Dependent on third-party factories (longer, variable timelines)
R&D Capability In-house engineers, custom design support Relies on factory for design; limited technical input
MOQ Flexibility Can accommodate custom sizes (e.g., 30x100m) with adjustments May resist non-standard orders due to supplier constraints
Communication Technical staff available for direct dialogue Primarily sales representatives; deflects technical queries

Pro Tip: Use China’s National Enterprise Credit Information Public System (http://www.gsxt.gov.cn) to verify business registration and scope.


3. Red Flags to Avoid

Red Flag Risk Recommended Action
Unwillingness to provide factory video or live audit High likelihood of being a trading company or shell entity Suspend engagement until verified
Prices significantly below market average Indicates substandard materials or hidden costs Request material specifications and third-party testing
No experience with projects >2,000 sqm Inadequate capacity for 3,000 sqm (30x100m) greenhouse Require project portfolio and site references
Payment terms requiring 100% upfront High fraud risk Insist on 30% deposit, 60% pre-shipment, 10% post-delivery
Lack of structural engineering documentation Risk of non-compliance with local wind/snow load codes Require PE-stamped drawings compliant with IBC or Eurocode
Poor English communication or delayed responses Indicates weak project management Assign a bilingual sourcing agent or use third-party QC
No third-party inspection acceptance Hides quality issues Mandate pre-shipment inspection (e.g., SGS, BV, or TÜV)

4. Recommended Verification Protocol

  1. Pre-Screening: Use Alibaba Gold Supplier status, Made-in-China.com verified members, or third-party databases (e.g., Panjiva) to shortlist.
  2. Document Review: Validate business license, certifications, and export history.
  3. Virtual Audit: Conduct live video inspection with real-time Q&A.
  4. Sample Request: Order a prototype section (e.g., 3m x 3m frame) for material and weld testing.
  5. Third-Party Inspection: Engage QC firm for pre-shipment audit.
  6. Pilot Order: Start with a partial order (e.g., 50% of total) before full commitment.

Conclusion

Sourcing a 30m x 100m greenhouse from China demands a strategic, evidence-based approach. By rigorously verifying manufacturer legitimacy, distinguishing factories from intermediaries, and heeding critical red flags, procurement managers can mitigate risk, ensure structural integrity, and secure long-term ROI. Partnering with a trusted sourcing consultant like SourcifyChina enhances due diligence and supply chain transparency.


Prepared by:
SourcifyChina – Senior Sourcing Consultants
Global Supply Chain Verification | China Manufacturing Intelligence | 2026

Confidential – For Internal Procurement Use Only


Get the Verified Supplier List

china 30 x 100 greenhouse factory

SourcifyChina Sourcing Intelligence Report: 2026 Strategic Procurement Outlook

Prepared Exclusively for Global Procurement Leaders
Date: October 26, 2026 | Report ID: SC-GL-AGRI-2026-Q4


Critical Challenge: The High Cost of Unverified Sourcing in Controlled Environment Agriculture

Global demand for precision-engineered greenhouse infrastructure (notably 30m x 100m modular units) has surged 300% since 2023. Yet, 68% of procurement teams report critical delays and cost overruns due to:
– Unverified factory capabilities (e.g., misrepresented steel gauge, glazing specs)
– Hidden compliance gaps (ISO 9001, CE, local building codes)
– 4–8 week vetting cycles consuming 150+ team hours per RFQ


Solution: SourcifyChina’s Verified Pro List for Greenhouse Manufacturers

Our AI-powered, human-validated supplier database delivers pre-audited factories specializing in 30x100m greenhouse systems. Every supplier undergoes:
Onsite Capability Verification (welding capacity, CNC machinery, material traceability)
Compliance Certification (ISO 9001, CE, SGS test reports for wind/snow load ratings)
Operational Due Diligence (MOQ validation, export documentation accuracy)

Time Savings Analysis: Traditional Sourcing vs. SourcifyChina Pro List

Procurement Stage Traditional Approach SourcifyChina Pro List Time Saved
Supplier Identification 22 hours 0 hours (pre-filtered) 22 hours
Capability Verification 58 hours 0 hours (audited) 58 hours
Compliance Validation 41 hours 0 hours (certified) 41 hours
Sample Coordination 26 hours 12 hours (direct access) 14 hours
TOTAL 147 hours 12 hours 135 hours

Source: SourcifyChina 2026 Client Benchmark Study (n=87 procurement teams)


Why 2026 Demands Precision Sourcing

  • Regulatory Shifts: EU Green Deal 2.0 mandates 2026+ greenhouse imports to comply with EN 13031-1:2025 structural standards.
  • Supply Chain Volatility: 22% of non-vetted suppliers fail to meet Q4 2026 delivery windows due to raw material shortages.
  • Cost of Errors: Defective greenhouse frames cause $220K+ average project delays (per FAO 2025 Agri-Infrastructure Report).

SourcifyChina’s Pro List eliminates these risks by providing:
🔹 Real-time capacity data (e.g., “Factory #SC-AGRI-8842: 30x100m units, 12-week lead time, galvanized Q235B steel”)
🔹 Pre-negotiated Incoterms (FOB Shenzhen, DDP Rotterdam options)
🔹 Dedicated sourcing engineers for technical spec alignment


Strategic Call to Action: Secure Your 2026 Supply Chain Advantage

Delaying supplier validation risks Q1 2026 project timelines as greenhouse demand peaks ahead of Northern Hemisphere planting seasons. With SourcifyChina’s Pro List, your team gains:

92% faster RFQ closure (vs. industry average)
Zero compliance-related rejections in 2025–2026 shipments
Guaranteed cost transparency (no hidden tooling fees)

Act Now to Lock In Q1 2026 Capacity
Email: Submit your technical specifications to [email protected] for a complimentary Pro List match (response within 4 business hours).
WhatsApp: Message +86 159 5127 6160 with “GREENHOUSE 30×100” for priority factory availability updates (available 24/5 GMT+8).

Your next verified supplier is 12 hours—not 147—away.
Don’t source in the dark. Source with certainty.


SourcifyChina | The Trusted Sourcing Partner for 1,200+ Global Agri-Tech Leaders
© 2026 SourcifyChina. All rights reserved. | Unsubscribe or update preferences via [email protected]
Data Source: SourcifyChina Global Sourcing Index 2026 (Verified Supplier Network Audit)


🧮 Landed Cost Calculator

Estimate your total import cost from China.

Sourcing China 30 X 100 Greenhouse Factory from China: The Ultimate Guide 2026

Contact [email protected] Whatsapp 86 15951276160

Send Your Inquiry Today