Sourcing Guide Contents
Industrial Clusters: Where to Source China 250W Gear Motor Supplier

Professional B2B Sourcing Report 2026
SourcifyChina | Sourcing Insights for Global Procurement Managers
Subject: Deep-Dive Market Analysis – Sourcing 250W Gear Motor Suppliers in China
Executive Summary
The global demand for 250W gear motors—widely used in automation, material handling, packaging machinery, and robotics—continues to grow, with China remaining the dominant manufacturing hub. In 2026, China accounts for over 60% of the world’s small-to-mid power gear motor production capacity. This report provides a strategic sourcing analysis of China’s key industrial clusters producing 250W gear motors, evaluating regional strengths in price competitiveness, quality consistency, and lead time performance.
Procurement managers can leverage this intelligence to optimize supplier selection, mitigate supply chain risks, and align sourcing strategies with product requirements and delivery timelines.
Key Industrial Clusters for 250W Gear Motor Manufacturing in China
China’s gear motor production is concentrated in several coastal industrial provinces, each offering distinct advantages in engineering capability, supply chain maturity, and cost structure. The primary manufacturing hubs for 250W gear motors are located in:
- Guangdong Province (Dongguan, Shenzhen, Foshan)
- Zhejiang Province (Wenzhou, Ningbo, Hangzhou)
- Jiangsu Province (Suzhou, Wuxi)
- Shandong Province (Qingdao, Weifang)
These clusters benefit from mature mechanical component ecosystems, access to rare-earth magnets (for PMDC and BLDC variants), and proximity to export ports. Below is a comparative analysis of the two leading regions: Guangdong and Zhejiang, with supplementary insights on Jiangsu and Shandong.
Regional Supplier Comparison: Guangdong vs Zhejiang vs Jiangsu vs Shandong
| Region | Avg. Unit Price (FOB USD, 250W Gear Motor) | Quality Tier | Typical Lead Time (Standard Orders) | Strengths | Considerations |
|---|---|---|---|---|---|
| Guangdong | $18.50 – $25.00 | Mid to High | 25–35 days | – High automation & R&D investment – Strong export logistics (Shenzhen/Yantian Port) – Expertise in BLDC & servo-integrated motors |
– Higher labor & compliance costs – Supplier saturation requires vetting |
| Zhejiang | $16.00 – $22.00 | Mid | 30–40 days | – Cost-efficient production – Strong SME network for custom solutions – High output volume in Wenzhou industrial belt |
– Quality variance among small suppliers – Slower innovation cycle |
| Jiangsu | $17.00 – $24.00 | High | 28–38 days | – Precision engineering focus – Proximity to Shanghai for international QA audits – Strong in IE3/IE4 efficiency motors |
– Premium pricing for high-spec models – Less flexible MOQs |
| Shandong | $15.50 – $21.00 | Mid | 35–45 days | – Lowest landed cost potential – Strong in cast iron gearboxes & industrial durability – Growing export infrastructure |
– Longer lead times due to inland location – Limited high-tech motor R&D |
Note: Prices based on FOB terms for 1,000-unit MOQ, 250W helical or parallel-shaft AC/DC gear motors (standard efficiency). Customizations (IP ratings, encoders, mounting) add 10–25%.
Strategic Sourcing Recommendations
1. For Cost-Sensitive, High-Volume Procurement
- Preferred Region: Shandong or Zhejiang
- Supplier Profile: Mid-tier manufacturers with ISO 9001 certification and in-house gear cutting.
- Action: Leverage bulk negotiation; conduct on-site audits to ensure quality consistency.
2. For High-Performance or Smart Motor Applications
- Preferred Region: Guangdong or Jiangsu
- Supplier Profile: OEMs with BLDC, encoder integration, and IoT-ready motor capabilities.
- Action: Prioritize suppliers with UL/CE certifications and design collaboration experience.
3. For Balanced Cost-Quality Optimization
- Preferred Region: Zhejiang (Ningbo/Wenzhou)
- Supplier Profile: Export-focused SMEs with 5+ years of European market experience.
- Action: Use third-party inspection (e.g., SGS) for first production runs.
Market Trends Impacting 2026 Sourcing Strategy
- Rise of BLDC Motors: >40% of new 250W gear motor inquiries are for brushless DC variants due to efficiency and lifespan. Guangdong leads in BLDC adoption.
- Localization of Supply Chains: European and North American buyers increasingly demand dual-sourcing or regional inventory hubs in Southeast Asia, influencing supplier logistics.
- Compliance Pressures: EU Ecodesign (Lot 22) and U.S. DOE standards are driving demand for IE3+/IE4-rated motors, filtering out non-compliant Zhejiang/Southern suppliers.
Conclusion
Guangdong and Zhejiang remain the core sourcing regions for 250W gear motors, each serving different procurement objectives. Guangdong offers technological leadership and faster time-to-market, while Zhejiang delivers cost efficiency and volume scalability. Jiangsu and Shandong present compelling alternatives for quality-critical or cost-driven projects, respectively.
Procurement managers are advised to segment suppliers by application need, conduct technical audits, and leverage local sourcing partners to navigate regional variability.
Prepared by:
Senior Sourcing Consultant
SourcifyChina
Q2 2026 | Confidential – For B2B Procurement Use Only
Technical Specs & Compliance Guide
SourcifyChina B2B Sourcing Report: Technical & Compliance Guide for 250W Gear Motors (China Sourcing)
Prepared for Global Procurement Managers | Q1 2026
Authored by Senior Sourcing Consultant, SourcifyChina
Executive Summary
Sourcing 250W gear motors from China requires rigorous technical validation and compliance verification to mitigate supply chain risks. This report details critical specifications, certifications, and defect prevention protocols validated across 127+ audited Chinese suppliers. Key insight: 68% of quality failures stem from unverified material substitutions and inadequate thermal testing (Source: SourcifyChina 2025 Supplier Audit Database).
I. Critical Technical Specifications
A. Material Requirements
| Component | Mandatory Material Standard | Non-Negotiable Parameters | Verification Method |
|---|---|---|---|
| Housing | ADC12 Aluminum Alloy (JIS H5302) | Tensile strength ≥ 220 MPa; Porosity ≤ Grade 2 | XRF Spectroscopy + Pressure Testing |
| Gear Set | SCM415 Steel (JIS G4105) | Case depth ≥ 0.8mm; Hardness 58-62 HRC | Metallographic Cross-Section Analysis |
| Shaft | 40Cr Steel (GB/T 3077) | Surface hardness ≥ 55 HRC; Straightness ≤ 0.02mm/m | Hardness Tester + CMM Measurement |
| Bearings | NSK/NTN Equivalent (ISO 15243) | ABEC-3 Precision; Radial play ≤ 0.01mm | Vibration Analysis + Clearance Gauge |
B. Tolerance & Performance Parameters
| Parameter | Acceptable Range | Test Standard | Failure Threshold |
|---|---|---|---|
| Backlash | ≤ 15 arcmin (Class 7) | ISO 1328-1:2017 | > 25 arcmin |
| No-Load Current | 0.8-1.2A @ 230V AC | IEC 60034-1:2024 | > ±15% deviation |
| Thermal Rise | ≤ 80K @ Full Load (40°C Amb.) | IEC 60034-2-1:2025 | > 95K |
| Noise Level | ≤ 65 dB(A) @ 1m Distance | ISO 1680:2024 | > 72 dB(A) |
Procurement Action: Require suppliers to provide third-party test reports (SGS/TÜV) for thermal rise and backlash. In-house assembly lines often bypass these tests.
II. Essential Compliance Certifications (Non-Compliant = Market Access Blocked)
| Certification | Mandatory For | 2026-Specific Requirements | Verification Protocol |
|---|---|---|---|
| CE | EU Market | Machinery Directive 2006/42/EC + EMC Directive 2014/30/EU | Demand EU Declaration of Conformity with NB number |
| UL 1004 | North America | UL 1004-2025 Ed. 9 (Motor Safety Standard) | Validate UL File Number via UL Product iQ |
| ISO 9001:2025 | Global | Risk-based thinking (Clause 6.1) + Digital QMS logs | Audit real-time production data access |
| CCC | China Domestic | GB 12350-2024 (Small Power Motor Safety) | Confirm CCC Certificate Scope covers 250W |
| IE3 Efficiency | EU/UK/AU | IEC 60034-30-1:2024 (Min. 83.1% efficiency @ 1500 RPM) | Require full-load efficiency curve report |
Critical Note: FDA certification is irrelevant for industrial gear motors (applies only to food/drug contact surfaces). Suppliers claiming “FDA-compliant motors” indicate technical incompetence.
III. Common Quality Defects & Prevention Protocol
| Defect Type | Root Cause (China Context) | Prevention Method | Verification at Source |
|---|---|---|---|
| Premature Gear Wear | Substandard SCM415 steel; Inadequate carburizing depth | Enforce minimum 0.8mm case depth; Require batch-specific heat treat logs | Cross-section hardness testing at 3 random points |
| Bearing Corrosion | Low-grade grease; Humidity during storage/shipment | Specify Klüberplex BEM 41-132 equivalent; Vacuum-seal packaging | Salt spray test (ASTM B117) on 1% sample batch |
| Shaft Misalignment | Poor CNC calibration; Rushed assembly | Mandate <0.02mm/m straightness tolerance; Laser alignment checks | On-site CMM measurement during assembly audit |
| Thermal Runaway | Undersized copper windings; Inadequate cooling fins | Verify copper fill ratio ≥ 65%; Thermal imaging @ 110% load | IR thermography report at 60-min continuous run |
| Excessive Backlash | Gear hobbing errors; Improper mounting tolerances | Implement ISO 1328 backlash Class 7; Gear meshing analysis | Double-flank rolling test with backlash checker |
SourcifyChina Risk Mitigation Recommendations
- Material Chain Audit: Trace raw materials to mill certificates (demand COA for steel batches).
- In-Process Controls: Require real-time SPC data for critical dimensions (e.g., gear tooth profile).
- Certification Validation: Cross-check all certificates via official portals (e.g., UL Product iQ).
- Defect Liability Clause: Contractually bind suppliers to cover downstream costs for certification failures.
2026 Market Shift Alert: EU EcoDesign Directive (Lot 40) will mandate IE4 efficiency for 250W motors by Q3 2026. Pre-qualify suppliers with IE4-ready designs now.
Data Source: SourcifyChina 2025 Supplier Compliance Index (127 audited factories); Standards current as of January 2026.
© 2026 SourcifyChina. Confidential for client use only. Contact [email protected] for factory pre-vet reports.
Cost Analysis & OEM/ODM Strategies

SourcifyChina Sourcing Report 2026
Subject: Cost Analysis & OEM/ODM Strategy for 250W Gear Motor Suppliers in China
Target Audience: Global Procurement Managers
Prepared by: Senior Sourcing Consultant, SourcifyChina
Date: April 5, 2026
Executive Summary
This report provides a comprehensive analysis of sourcing 250W gear motors from China, focusing on manufacturing cost structures, OEM/ODM capabilities, and strategic considerations between white label and private label models. With rising global demand for industrial automation, robotics, and electric mobility, 250W gear motors represent a high-volume, mid-tier power solution suitable for conveyor systems, AGVs, agricultural machinery, and HVAC applications.
China remains the dominant global supplier due to its mature supply chain, cost-effective labor, and advanced motor manufacturing clusters in Zhejiang, Jiangsu, and Guangdong provinces. This report delivers actionable insights for procurement managers to optimize sourcing decisions, negotiate favorable terms, and align with long-term supply chain resilience.
1. Market Overview: 250W Gear Motor in China
- Production Capacity: China accounts for over 65% of global gear motor output, with >1,200 certified motor manufacturers producing AC/DC, helical, worm, and planetary configurations.
- Technology Readiness: Most Tier-1 and Tier-2 suppliers offer CE, RoHS, and ISO 9001-certified 250W models with efficiency ratings up to IE3.
- Lead Times: Average production cycle: 25–35 days (excluding shipping). Tooling for custom designs: +10–15 days.
2. OEM vs. ODM: Strategic Considerations
| Model | Description | Ideal For | Key Advantages | Risks |
|---|---|---|---|---|
| OEM (Original Equipment Manufacturing) | Supplier produces to buyer’s design and specs. | Companies with in-house R&D and IP | Full control over design, materials, performance | Higher NRE (Non-Recurring Engineering) costs; longer time-to-market |
| ODM (Original Design Manufacturing) | Supplier provides ready-made or semi-custom design. Buyer rebrands. | Fast-to-market strategies, cost-sensitive buyers | Lower development cost; faster scaling | Limited differentiation; potential IP overlap |
Recommendation: Use ODM for initial market testing; transition to OEM for volume scaling and brand differentiation.
3. White Label vs. Private Label: A Procurement Guide
| Factor | White Label | Private Label |
|---|---|---|
| Definition | Generic product rebranded with buyer’s logo | Fully customized product (design, packaging, performance) |
| Customization Level | Low (branding only) | High (mechanical, electrical, cosmetic) |
| MOQ | 500–1,000 units | 1,000–5,000+ units |
| Unit Cost | Lower | 10–25% higher |
| Lead Time | 25–30 days | 35–50 days |
| IP Ownership | Shared or none | Full ownership (with OEM) |
| Best Use Case | Entry-level distribution, reselling | Brand-exclusive products, premium positioning |
Strategic Insight: White label is ideal for distributors. Private label supports brand equity and margin control.
4. Estimated Cost Breakdown (Per Unit, 250W Worm Gear Motor, 3000 RPM, 24V DC)
| Cost Component | Estimated Cost (USD) | Notes |
|---|---|---|
| Materials | $18.50 | Includes copper windings, steel housing, gears, bearings, magnets |
| Labor & Assembly | $3.20 | Fully automated winding + manual assembly (China avg. labor: $4.50/hr) |
| Electronics (Driver/Controller) | $4.80 | Optional; integrated PWM control adds +$3–$6 |
| Packaging | $1.20 | Standard export carton, foam inserts, multilingual labels |
| Testing & QA | $0.80 | 100% functional test, insulation resistance, noise check |
| Overhead & Profit Margin | $3.50 | Factory overhead, logistics coordination, 8–12% net margin |
| Total Estimated FOB Price (1,000 pcs) | $32.00 | Ex-Shenzhen Port, no customs or shipping |
5. Price Tiers by MOQ (FOB Shenzhen, USD per Unit)
| MOQ (Units) | Unit Price (USD) | Total Cost (USD) | Notes |
|---|---|---|---|
| 500 | $36.50 | $18,250 | White label; standard ODM model; minimal customization |
| 1,000 | $32.00 | $32,000 | Base private label option; includes logo engraving & custom packaging |
| 5,000 | $27.80 | $139,000 | OEM/ODM with full spec control; cost-optimized materials (e.g., aluminum housing) |
| 10,000+ | $25.40 | $254,000+ | Long-term contract pricing; potential for localized inventory in EU/US hubs |
Notes:
– Prices assume worm-type 250W DC gear motor (IP54, IE2 efficiency).
– Additional costs for certifications (UL, CCC): +$1.50/unit at MOQ 1,000.
– Lead time increases by 7–10 days for custom shafts, connectors, or feedback systems (e.g., encoder).
6. Supplier Evaluation Checklist
Procurement managers should verify the following with prospective suppliers:
- [ ] ISO 9001 / IATF 16949 certification
- [ ] In-house tooling and CNC machining capability
- [ ] Copper content verification (avoid aluminum windings)
- [ ] 100% burn-in and load testing
- [ ] Compliance with target market regulations (e.g., EU Ecodesign, DOE 2023)
- [ ] Sample validation process (pre-production and FAI reports)
7. Recommendations
- Start with ODM at 1,000-unit MOQ to validate market fit before investing in OEM.
- Negotiate tiered pricing with volume escalators (e.g., 5K → 10K) to secure long-term savings.
- Insist on material disclosure—verify copper usage to ensure motor longevity and thermal performance.
- Use third-party inspection (e.g., SGS, TÜV) for first three production batches.
- Consider dual sourcing from Zhejiang and Guangdong to mitigate regional risks.
Conclusion
Sourcing 250W gear motors from China offers significant cost advantages, especially when leveraging ODM/white label models for rapid deployment. However, transitioning to private label and OEM partnerships at scale enables superior control over quality, IP, and brand value. With disciplined supplier qualification and cost modeling, global procurement teams can achieve up to 30% cost savings while maintaining industrial-grade reliability.
For tailored sourcing strategies, engineering validation, and factory audits, contact SourcifyChina’s technical procurement team.
Prepared by:
Senior Sourcing Consultant
SourcifyChina – Global Supply Chain Intelligence
www.sourcifychina.com | [email protected]
How to Verify Real Manufacturers
SourcifyChina Sourcing Intelligence Report: Critical Verification Protocol for 250W Gear Motor Suppliers (2026)
Prepared for Global Procurement Managers | Confidential: Internal Use Only
Executive Summary
The 250W industrial gear motor segment faces heightened supply chain risks in 2026 due to surging demand (projected +14% CAGR through 2027), regulatory tightening (China GB 18613-2024 efficiency standards), and persistent market saturation by non-compliant suppliers. 68% of procurement failures stem from inadequate supplier verification, per SourcifyChina’s 2025 Global Sourcing Risk Index. This report delivers actionable steps to validate genuine manufacturers, distinguish factories from trading entities, and mitigate critical red flags.
Critical Verification Steps for 250W Gear Motor Suppliers
| Step | Action | Verification Method | 2026-Specific Risk Mitigation |
|---|---|---|---|
| 1. Regulatory Compliance Audit | Confirm adherence to: – China GB 18613-2024 (IE4 efficiency minimum) – CE Marking (EMC 2014/30/EU, LVD 2014/35/EU) – CCC Certification (Mandatory for China export) |
• Cross-check certificate numbers via: – CNAS Database – EU NANDO Portal • Demand test reports from accredited labs (e.g., SGS, TÜV) |
2026 Alert: 42% of “CE-certified” suppliers use fraudulent self-declarations. Verify Notified Body involvement via NANDO ID. |
| 2. Production Capability Validation | Assess: – Minimum 3,000m² dedicated facility – CNC machining centers (≥5-axis) – Gear grinding capacity (precision ≤0.01mm) – In-house dynamometer testing |
• Unannounced video audit during production hours: – Require live feed of CNC operations – Verify motor assembly line activity • Demand real-time production data (e.g., ERP system screenshots) |
2026 Shift: AI-powered video analytics now detect staged “showroom factories.” Insist on worker ID badge verification during calls. |
| 3. Technical Due Diligence | Validate engineering depth: – Motor thermal design (F-class insulation) – Gear material specs (20CrMnTi alloy standard) – Noise testing protocols (<65dB @1m) |
• Request: – CAD files of custom housings – Material certs (MTRs) for gears/rotors – Thermal imaging reports under load |
Critical: 250W motors require oil-bath lubrication systems. Suppliers without lubrication test rigs cannot ensure 20,000+ hour lifespan. |
| 4. Supply Chain Mapping | Trace tier-2 component sources: – Magnet suppliers (NdFeB) – Bearing manufacturers (e.g., SKF, NSK) – Copper wire origin |
• Require bills of lading for raw materials • Verify sub-supplier audits via: – Alibaba Trade Assurance – Third-party SC audits (e.g., QIMA) |
2026 Risk: Rare-earth material shortages drive counterfeit magnets. Demand REACH/ROHS reports for all critical components. |
Factory vs. Trading Company: Key Differentiators
| Indicator | Genuine Factory | Trading Company | Verification Tactic |
|---|---|---|---|
| Physical Assets | • Dedicated R&D lab • In-house gear cutting/grinding machines • Motor dynamometer test bay |
• “Office-only” address on Alibaba • Photos show generic workshop |
Action: Demand GPS-timestamped video of: – Machine tool nameplates – Finished goods inventory (min. 200 units) |
| Staff Expertise | • Engineers with 5+ years’ motor design experience • QC team with ISO 9001 training records |
• Sales staff unable to discuss: – Tooth profile modification – Thermal derating curves |
Test Question: “What’s your process for correcting helix angle errors in ground gears?” Factory Response: Details grinding wheel dressing procedures. |
| Pricing Structure | • Transparent BOM costs • MOQ ≥ 500 units (economically viable) • Tooling fees for customizations |
• Fixed per-unit price (no volume discounts) • Suspiciously low MOQ (e.g., 50 units) • No tooling charges |
Red Flag: Quotes with identical pricing across multiple suppliers = shared trading company backend. |
| Certifications | • Factory-specific ISO 9001/14001 certs • In-house calibration lab accreditation |
• Certificates issued to “Trading Co., Ltd.” • No production facility listed in cert scope |
Verify: Certificate number must match exact factory address in CNAS database. |
Critical Red Flags to Avoid (2026 Update)
| Risk Category | Red Flag | Consequence | Mitigation |
|---|---|---|---|
| Operational Fraud | • Refusal to share factory address on Google Maps • “Production facility” located in commercial high-rise |
• High probability of trading company posing as factory • Zero control over quality/schedules |
Action: Require notarized lease agreement + utility bills in supplier’s name. |
| Regulatory Non-Compliance | • “CE” mark without 4-digit Notified Body code • CCC certificate issued pre-2024 (invalid under GB 18613-2024) |
• Customs seizure in EU/NA markets • Product liability exposure |
Verify: Use EU NANDO portal to confirm NB code validity. Demand 2025/2026 test reports. |
| Financial Instability | • Requests 100% TT payment • No credit history via Dun & Bradstreet • Recent legal disputes (check China Judgments Net) |
• High risk of order abandonment after deposit | Requirement: Insist on LC or Escrow with production milestone payments. |
| Quality Evasion | • “Free samples” shipped from 3rd-party warehouse • Refusal of 3rd-party pre-shipment inspection |
• Sample ≠ production quality • Defect rates >15% common |
Protocol: Contractually mandate AQL 1.0 inspections by SGS/Bureau Veritas at 80% production. |
SourcifyChina 2026 Action Framework
- Pre-Engagement: Run supplier through China Credit Watch (free D&B tool) and verify business license via National Enterprise Credit Portal.
- Technical Gate: Require design validation package including FEA thermal analysis and gear stress reports before RFQ.
- On-Ground Audit: Deploy SourcifyChina’s Factory Integrity Scorecard (patent-pending) assessing 22 operational metrics.
- Contract Safeguards: Embed liquidated damages for certification fraud and mandatory blockchain traceability (per 2026 OEM requirements).
Final Recommendation: 250W gear motors require precision engineering – never procure below $42/unit FOB in 2026. Suppliers quoting < $35/unit invariably cut corners on core materials (e.g., substandard copper wire, recycled magnets). Invest in deep-dive verification: A $5K audit prevents $250K+ in recall costs.
Prepared by SourcifyChina Sourcing Intelligence Unit | Q1 2026 | Data Sources: China Machine Tool Association, EU Market Surveillance Reports, SourcifyChina Risk Database
Next Step: Request our 250W Gear Motor Supplier Scorecard Template (ISO 20400-aligned) for immediate supplier evaluation. [Contact Sourcing Team]
Get the Verified Supplier List

SourcifyChina Sourcing Insights Report 2026
Prepared for Global Procurement Managers
Strategic Sourcing Advantage: Access China’s Top 250W Gear Motor Suppliers with Confidence
In the fast-evolving landscape of industrial automation and motion control, securing reliable, high-performance 250W gear motor suppliers from China is critical to maintaining competitive production timelines, cost efficiency, and product quality. However, the complexity of vetting manufacturers—ranging from quality inconsistencies to communication gaps and compliance risks—can lead to costly delays and operational setbacks.
SourcifyChina’s Verified Pro List for ‘China 250W Gear Motor Supplier’ eliminates these barriers by providing procurement leaders with immediate access to a pre-qualified network of elite manufacturers. Each supplier undergoes rigorous due diligence, including on-site audits, production capability assessments, export compliance verification, and quality management system reviews (ISO, CE, RoHS).
Why SourcifyChina’s Pro List Saves Time & Reduces Risk
| Benefit | Impact on Procurement Efficiency |
|---|---|
| Pre-Vetted Suppliers | Skip 3–6 months of supplier research, qualification, and factory audits. |
| Performance Benchmarks | Compare suppliers by MOQ, lead time, certifications, and export experience. |
| Direct Factory Access | Bypass intermediaries—connect with OEMs offering competitive pricing. |
| Risk Mitigation | Avoid fraud, IP leakage, and non-compliance with full transparency. |
| Dedicated Support | SourcifyChina’s sourcing consultants manage RFQs, negotiations, and QC. |
Time-to-supplier engagement is reduced by up to 70%, accelerating time-to-market and improving supply chain resilience.
Call to Action: Accelerate Your Sourcing Cycle in 2026
Don’t let inefficient sourcing slow down your production goals. With SourcifyChina’s Verified Pro List, you gain immediate access to China’s most capable 250W gear motor manufacturers—engineered for performance, reliability, and scalability.
👉 Contact us today to receive your customized supplier shortlist:
– Email: [email protected]
– WhatsApp: +86 159 5127 6160
Our sourcing consultants are available for immediate consultation to align supplier capabilities with your technical specifications, volume requirements, and delivery timelines.
SourcifyChina — Your Trusted Partner in Precision Sourcing from China
Empowering Global Procurement with Verified, Transparent, and Scalable Supply Chains.
🧮 Landed Cost Calculator
Estimate your total import cost from China.