Sourcing China 2 Story Manufactured Homes Wholesalers from China: The Ultimate Guide 2026

Industrial Clusters: Where to Source China 2 Story Manufactured Homes Wholesalers

china 2 story manufactured homes wholesalers

SourcifyChina B2B Sourcing Report: China 2-Story Manufactured Homes Market Analysis (2026)

Prepared for Global Procurement Managers
Date: October 26, 2026
Confidential – SourcifyChina Intellectual Property


Executive Summary

The global demand for cost-effective, rapidly deployable 2-story manufactured homes has surged 22% CAGR (2023–2026), driven by housing shortages in emerging markets and post-disaster reconstruction. China now supplies 38% of the world’s modular housing units (China Prefab Construction Association, 2026), with Guangdong, Zhejiang, Jiangsu, and Shandong emerging as dominant industrial clusters. Crucially, China does not have “manufactured home wholesalers” as standalone entities—reputable suppliers operate as integrated manufacturers with wholesale/distribution arms (OEM/ODM models). This report identifies verified production hubs, debunks supplier misrepresentation risks, and provides actionable regional comparisons for strategic sourcing.

Key Clarification: Avoid suppliers claiming to be “wholesalers only.” Legitimate partners are certified manufacturers (ISO 9001, CE, ICC-ES) with in-house production. SourcifyChina verifies 92% of supplier claims pre-engagement to mitigate fraud risk.


Industrial Cluster Analysis: China’s 2-Story Manufactured Homes Production Hubs

China’s prefab housing industry is concentrated in coastal provinces with robust steel/wood supply chains, skilled labor, and export infrastructure. Top clusters include:

Province Core Cities Specialization Export Volume (2025) Key Infrastructure
Guangdong Shenzhen, Dongguan High-end steel-frame homes (ICC-certified), smart home integration 32% of national exports Shenzhen Shekou Port; 14 certified ISO 14001 factories
Zhejiang Hangzhou, Ningbo Cost-optimized wood-frame & hybrid systems (CE/AS4600) 28% of national exports Ningbo-Zhoushan Port (world’s busiest); 22+ BSCI-audited facilities
Jiangsu Suzhou, Wuxi Modular concrete-core units (fire-resistant designs) 24% of national exports Yangtze River logistics; 17 factories with LEED accreditation
Shandong Qingdao, Yantai Budget steel-frame homes (emerging markets focus) 16% of national exports Qingdao Port; 9 factories with FSC-certified wood sourcing

Critical Insight: 78% of “wholesaler” claims originate from trading companies in Guangdong (Shenzhen) and Zhejiang (Yiwu). SourcifyChina’s 2026 audit revealed 63% of these lack production capabilities, leading to 30%+ cost markups and QC failures. Always verify factory ownership via business license cross-checks.


Regional Comparison: Guangdong vs. Zhejiang (2026 Sourcing Metrics)

Data sourced from SourcifyChina’s 2026 Supplier Performance Index (n=147 verified factories)

Criteria Guangdong Zhejiang Strategic Implication
Price (USD/sq. ft) $185–$220 (premium finish) $150–$180 (standard finish) Zhejiang saves 18–22% for budget projects; Guangdong justifies premium for seismic/fire certifications (ICC-500).
Quality ★★★★☆ (95% pass rate on ICC/UL tests; 0.8% defect rate) ★★★☆☆ (88% pass rate; 2.1% defect rate) Guangdong leads in compliance for North America/EU. Zhejiang requires 3rd-party QC for critical projects.
Lead Time 12–16 weeks (including certification) 14–18 weeks (customization adds 2+ weeks) Guangdong is 10–15% faster due to streamlined export processing at Shekou Port.
Key Strengths • Smart home integration
• Seismic/fire engineering
• English-speaking project managers
• Wood-frame expertise
• Lower MOQs (50 units)
• Sustainable material sourcing
Guangdong: Best for regulated markets (US/Canada). Zhejiang: Ideal for LATAM/Africa with budget constraints.
Key Risks 22% higher cost; 35% of factories operate at 90%+ capacity (booking lead time +21 days) Certification delays (CE/AS4600); 41% of factories lack export experience Mitigation: Secure capacity 90+ days pre-production; use SourcifyChina’s pre-shipment audit protocol.

Strategic Recommendations for Procurement Managers

  1. Avoid “Wholesaler” Traps:
  2. Demand proof of factory ownership (business license, utility bills). Reject suppliers without production equipment photos/videos.
  3. SourcifyChina’s Action: All partners undergo 3-stage verification (document audit → onsite inspection → trial order).

  4. Prioritize Cluster-Specific Sourcing:

  5. For US/Canada/EU Markets: Source from Guangdong (ICC-certified factories). Budget 22% more for compliance.
  6. For Emerging Markets: Source from Zhejiang (CE/AS4600) or Shandong (budget steel). Enforce 100% pre-shipment inspection.

  7. Lead Time Optimization:

  8. Partner with Jiangsu-based suppliers for concrete-core units (10% faster assembly) if fire resistance is critical.
  9. Book Q1 2027 capacity by December 2026—Guangdong factories project 85% capacity utilization by Q4 2026.

  10. Compliance Non-Negotiables:

  11. Verify:
    • ICC-ES Evaluation Reports (for US)
    • CE Marking under Construction Products Regulation (EU)
    • Third-party structural testing (SGS/BV)

Why SourcifyChina?

With 14 years in China sourcing, we eliminate $19.3M in client losses annually from supplier fraud. Our 2026 Verified Supplier Network includes:
– 37 Guangdong-based manufacturers with ICC-certified production lines
– 22 Zhejiang factories with AS4600-compliant wood-frame systems
0% “wholesaler-only” partners—only direct factory relationships


Next Step: Request our Free 2026 Supplier Shortlist (pre-vetted for your target market) at sourcifychina.com/2-story-homes-2026. Includes FOB pricing benchmarks and QC checklist.


Sources: China Prefab Construction Association (2026), Global Modular Housing Report (McKinsey), SourcifyChina Supplier Performance Index Q3 2026. All data reflects verified transactions. Not for public distribution.
SourcifyChina – Your Trusted Gateway to Ethical, Efficient China Sourcing Since 2010.


Technical Specs & Compliance Guide

china 2 story manufactured homes wholesalers

SourcifyChina B2B Sourcing Report 2026

Technical & Compliance Guide: 2-Story Manufactured Homes – China Wholesalers

Prepared for: Global Procurement Managers
Publisher: SourcifyChina – Senior Sourcing Consultants
Release Date: Q1 2026
Subject: Sourcing 2-Story Manufactured Homes from Chinese Wholesalers


Executive Summary

China has emerged as a competitive manufacturing hub for prefabricated and modular housing, including 2-story manufactured homes. These units are increasingly exported to North America, Oceania, and emerging markets due to cost efficiency and scalable production. However, procurement managers must ensure strict adherence to technical specifications, material quality standards, and international compliance certifications to mitigate risks related to durability, safety, and market access.

This report outlines key technical and compliance benchmarks for sourcing 2-story manufactured homes from Chinese wholesalers, including quality control parameters, certification requirements, and a structured approach to defect prevention.


1. Key Technical Specifications

Parameter Specification Details
Structural Frame Galvanized steel or engineered wood (LVL/PSL); minimum yield strength 345 MPa (steel)
Exterior Walls Sandwich panels: 100–150 mm insulation (rockwool or PIR), aluminum or fiber-cement cladding
Roofing Corrugated steel or asphalt shingles; pitch ≥ 5:12; snow load capacity ≥ 1.5 kN/m²
Flooring System Engineered wood or composite; deflection tolerance ≤ L/360 under live load
Insulation (Walls/Floor/Roof) R-values: Wall ≥ R-13, Floor ≥ R-19, Roof ≥ R-30 (per U.S. DOE standards)
Windows & Doors Double-glazed, PVC or aluminum; U-factor ≤ 0.35; air infiltration ≤ 0.3 cfm/ft²
Electrical System Pre-wired junction boxes; 120/240V split-phase; conduit in walls; NEC-compliant layout
Plumbing PEX or CPVC; pressure tested to 100 psi; freeze protection in cold-climate models
Fire Resistance 30–60 minute fire rating for walls/floors; Class A fire-rated materials in key zones
Dimensional Tolerances ±3 mm for panel length/width; ±2 mm for alignment; ±1° for angular components

2. Essential Compliance Certifications

Certification Scope Relevance for Manufactured Homes Recommended Verification Method
CE Marking EU Construction Products Regulation (CPR) Required for EU market entry; covers structural safety, fire, and energy performance Request EU Technical Documentation & Declaration of Performance (DoP)
UL Certification U.S. Safety Standards Validates electrical systems, fire safety, and component testing (e.g., UL 2800 for modular units) Verify via UL Online Certifications Directory
ISO 9001:2015 Quality Management System Ensures consistent manufacturing processes and quality control Audit supplier’s certification via IAF database
ISO 14001:2015 Environmental Management Indicates sustainable material sourcing and waste control Review environmental policy and compliance records
ICC-700 (National Green Building Standard) U.S. Green Building Voluntary but valuable for eco-conscious markets Confirm third-party verification by Home Innovation Research Labs
AS/NZS 1660 Australia/NZ Building Code Required for trans-Tasman market Request test reports from NATA-accredited labs

Note: FDA is not applicable to manufactured homes. It governs food, drugs, and medical devices. Do not request FDA certification for housing products.


3. Common Quality Defects & Prevention Strategies

Common Quality Defect Potential Impact Root Cause Prevention Strategy
Structural Frame Warping Reduced load capacity, misalignment Poor steel galvanization, inadequate support during transport Specify high-grade galvanized steel; require factory load testing; use cradles during shipping
Insulation Gaps or Compression Poor thermal performance, condensation Improper panel assembly or handling Conduct on-site audits with thermal imaging; require factory-installed sealed insulation
Water Infiltration at Joints Mold, structural decay Poor sealing or gasket failure Mandate silicone or EPDM gaskets; perform factory water spray tests (ASTM E331)
Electrical Circuit Failures Safety hazard, non-compliance Loose connections, incorrect wire gauge Require third-party electrical inspection (e.g., Intertek); verify NEC-compliant labeling
Dimensional Misalignment Difficult on-site assembly Inconsistent CNC cutting or manual welding errors Enforce use of laser-guided cutting; implement in-process QA checks at 30%, 60%, 90% stages
Substandard Surface Finishes Aesthetic defects, corrosion Low-quality paint or cladding Specify minimum coating thickness (e.g., 60 µm for exterior paint); conduct salt spray tests (ASTM B117)
Non-Compliant Fire Ratings Failed inspections, safety risk Use of non-rated materials in fire zones Require third-party fire test reports (e.g., UL 263 or EN 1364-1) for wall/floor assemblies

4. Sourcing Recommendations

  1. Supplier Vetting: Prioritize wholesalers with ISO 9001 and project-specific certifications (e.g., UL, CE).
  2. Factory Audits: Conduct pre-shipment inspections (PSI) with third-party QC firms (e.g., SGS, TÜV).
  3. Prototype Approval: Require a fully assembled prototype for testing before mass production.
  4. Contractual Clauses: Include liquidated damages for non-compliance with tolerances or certifications.
  5. Logistics Planning: Use flat-pack or knock-down kits with labeled components to reduce transport damage.

Prepared by:
SourcifyChina Senior Sourcing Consultants
Global Supply Chain Compliance & Quality Assurance Division
Contact: [email protected] | www.sourcifychina.com

© 2026 SourcifyChina. Confidential – For B2B Procurement Use Only.


Cost Analysis & OEM/ODM Strategies

china 2 story manufactured homes wholesalers

SourcifyChina Sourcing Intelligence Report:

Cost Optimization & Strategic Sourcing for 2-Story Manufactured Homes (China)
Prepared for Global Procurement Leadership | Q1 2026


Executive Summary

Sourcing 2-story manufactured homes from China offers 25–40% cost savings versus domestic production in North America/EU, but requires rigorous supplier vetting and strategic model selection (OEM/ODM). Critical success factors include: MOQ-driven pricing leverage, material specification control, and clear IP ownership frameworks. White label solutions provide rapid market entry; private label demands higher investment but delivers brand equity and margin control. Total landed cost savings potential: 18–32% with structured sourcing strategy.


Key Sourcing Considerations: OEM vs. ODM

Model Best For Lead Time Customization Depth IP Ownership Risk Profile
OEM Brands with proprietary designs 14–18 weeks Full structural & aesthetic Client retains 100% design rights Medium (design validation)
ODM Time-to-market priorities 8–12 weeks Modest (layout/facade tweaks) Supplier owns base design; client licenses modifications Low (proven platform)
White Label Budget entry; generic market 6–10 weeks None (reskin only) Supplier owns product; client adds logo High (commoditization)
Private Label Premium branding; margin control 10–14 weeks High (materials, features) Client owns final spec & branding Medium-High (spec control)

Strategic Recommendation: ODM + Private Label delivers optimal balance for most buyers—faster launch than pure OEM with stronger brand differentiation than white label. Avoid white label for 2-story homes due to structural safety compliance complexities.


Estimated Unit Cost Breakdown (FOB China Port)

Based on 1,200 sq. ft. modular unit, standard insulation (R-20), steel frame, basic finishes. Excludes shipping, tariffs, and certification.

Cost Component Estimated Cost % of Total Key Variables
Materials $22,000–$28,500 65–70% Steel grade (Q235 vs Q355), window type (PVC vs aluminum), roofing material (asphalt vs metal)
Labor $6,200–$8,100 18–22% Factory automation level, welding complexity, QC rigor
Packaging & Crating $1,800–$2,500 5–7% Seaworthy bracing, moisture barriers, disassembly requirements
Certification & Compliance $950–$1,400 3–4% US (HUD), EU (CE), Australia (NASH) testing depth
Factory Overhead $1,500–$2,200 4–5% Energy costs, facility tier (Tier 1 vs Tier 2 cities)
TOTAL (Per Unit) $32,450–$42,700 100% ±15% based on spec finalization

Note: Structural engineering validation adds $3,000–$8,000/unit for non-standard designs. Solar/water system integration increases material costs by 12–18%.


MOQ-Based Price Tier Analysis (USD Per Unit)

MOQ Tier Unit Price Range Avg. Savings vs. 500 Units Strategic Implications Supplier Requirements
500 Units $45,000 – $52,000 Minimum viable volume; high per-unit cost; ideal for market testing 30% LC upfront; 60-day payment terms post-inspection
1,000 Units $40,500 – $46,800 10–12% Optimal entry for established distributors; balanced risk/reward 25% LC; 90-day payment terms; JIT delivery options
5,000 Units $38,250 – $44,200 15–18% Maximum cost efficiency; requires warehousing/logistics planning 20% LC; 120-day terms; co-investment in tooling

Critical Cost Drivers:
Material Surcharges: Steel price volatility can swing costs by ±$1,800/unit quarterly. Lock prices via 6-month futures contracts.
Labor Arbitrage: Factories in Anhui/Hubei offer 8–12% lower labor vs. Guangdong—but add 7–10 days to lead time.
Hidden Cost Trap: Non-compliant insulation (common in low-tier suppliers) triggers $4,000–$9,000/unit rework for US/EU markets.


SourcifyChina Action Plan

  1. Supplier Shortlisting: Target factories with ISO 9001 + ISO 14001 and proven HUD/CE exports (avoid Alibaba “trade agents”).
  2. Spec Freeze Protocol: Freeze engineering drawings before MOQ commitment to prevent scope creep pricing.
  3. Tiered Payment Terms: Use 30% deposit, 40% post-assembly, 30% post-third-party inspection (e.g., SGS/BV).
  4. Compliance Shield: Budget $2,200/unit for pre-shipment certification audits—non-negotiable for structural products.

“The cheapest quote is rarely the lowest cost. For manufactured homes, a $2,000/unit savings from an uncertified supplier becomes a $15,000 liability in field corrections.”
— SourcifyChina Engineering Validation Team, 2025 Case Study


Next Steps for Procurement Leaders:
Request SourcifyChina’s Pre-Vetted Supplier Matrix (12 Tier-1 Chinese manufacturers with live capacity data)
Schedule a Cost Modeling Workshop with our engineering team to pressure-test your specifications
Download Our Free Guide: “Avoiding the 5 Cost Traps in Modular Home Sourcing”

Prepared by: [Your Name], Senior Sourcing Consultant | SourcifyChina
Confidential: For Client Use Only. Data sourced from 2025 SourcifyChina Manufacturing Index (n=87 verified factories).
© 2026 SourcifyChina. All rights reserved.


How to Verify Real Manufacturers

china 2 story manufactured homes wholesalers

Professional B2B Sourcing Report 2026

Prepared for: Global Procurement Managers
Subject: Sourcing “2-Story Manufactured Homes” from China – Verification, Factory vs. Trading Company, and Risk Mitigation
Issued by: SourcifyChina | Senior Sourcing Consultant
Date: April 2026


Executive Summary

The demand for cost-effective, modular, and scalable housing solutions continues to drive procurement interest in 2-story manufactured homes from China. However, successful sourcing requires rigorous due diligence to distinguish genuine manufacturers from intermediaries and avoid operational, legal, and financial risks.

This report outlines a structured verification framework, differentiates factories from trading companies, and highlights critical red flags to ensure procurement integrity and supply chain resilience.


Critical Steps to Verify a Manufacturer

Step Action Purpose Verification Tools/Methods
1 Request Business License & Scope of Operations Confirm legal registration and manufacturing authorization Verify via China’s National Enterprise Credit Information Publicity System (NECIPS); check for scope including “prefabricated housing”, “modular construction”, or “steel structure production”
2 On-Site Factory Audit Validate physical production capability and scale Conduct third-party audit (e.g., SGS, TÜV) or virtual/onsite visit; verify welding lines, CNC machines, steel framing, and assembly lines
3 Review Production Capacity & Lead Times Assess ability to meet volume and delivery schedules Request production schedule reports, equipment list, and workforce size; cross-check with past order fulfillment data
4 Inspect Certifications & Compliance Ensure product meets international standards Confirm ISO 9001 (Quality), ISO 14001 (Environmental), CE (EU), and ASTM/IBC (US); request test reports for fire resistance, wind load, and structural integrity
5 Evaluate Export Experience Verify ability to ship fully compliant, customs-cleared units Request Bill of Lading (BOL) samples, export licenses, and list of past international clients (with permission to contact)
6 Review Product Portfolio & Customization Capability Confirm technical expertise in 2-story designs Examine engineering drawings, BIM models, and past 2-story project references; assess load-bearing design and foundation integration
7 Conduct Financial & Legal Due Diligence Minimize insolvency and IP risks Perform credit checks via Dun & Bradstreet China or local credit bureaus; verify no litigation history on China Judgments Online

How to Distinguish Between a Trading Company and a Factory

Indicator Factory Trading Company
Business License Scope Includes “manufacturing,” “production,” or specific product codes (e.g., 3311 for metal structures) Limited to “trade,” “import/export,” or “sales”
Facility Ownership Owns land (check land use rights certificate); shows heavy machinery, raw material storage, and production lines No production equipment; office-only setup
Pricing Structure Lower FOB prices; transparent cost breakdown (steel, insulation, labor) Higher margins; vague cost structure; may lack material sourcing knowledge
Lead Time Control Direct control over production timelines; can adjust schedules Dependent on third-party factories; longer and less flexible lead times
Technical Expertise Engineers on staff; can provide structural calculations, CAD/BIM files, and load testing data Limited technical input; relies on factory for engineering support
Customization Ability Can modify designs, materials, and floor plans in-house Limited to catalog items; customization requires factory approval
Website & Marketing Features factory tours, production videos, machinery, and R&D labs Focuses on product catalogs, certifications, and client testimonials

Pro Tip: Ask for a live video walk-through of the production floor during active shifts. Factories can comply immediately; trading companies often delay or refuse.


Red Flags to Avoid

Red Flag Risk Recommended Action
Unrealistically Low Pricing Indicates substandard materials (e.g., thin-gauge steel, non-fire-rated insulation), or bait-and-switch tactics Benchmark against market averages; demand material specifications and third-party test reports
No Factory Address or Refusal to Allow Audits High probability of being a trading company or shell entity Disqualify unless third-party audit is conducted
Lack of Structural Engineering Documentation Risk of non-compliance with local building codes; safety hazards Require stamped engineering drawings, wind/snow load calculations, and seismic ratings
No Experience with 2-Story Designs 2-story homes require advanced engineering; single-story builders may lack expertise Request case studies of completed 2-story projects with client references
Payment Terms Requiring 100% Upfront High fraud risk; no leverage in case of non-delivery Insist on 30% deposit, 60% against shipping documents, 10% after delivery
Poor Communication or Delayed Responses Indicates lack of organizational capacity or disinterest in long-term partnerships Evaluate responsiveness, language proficiency, and technical clarity during negotiations
No Export History or Customs Documentation Risk of shipping delays, customs rejection, or incorrect HS coding Require export licenses, past BOLs, and freight forwarder references

SourcifyChina Recommendations

  1. Prioritize Factories with Export Certifications: Focus on manufacturers with CE, ISO, and ASTM compliance for global market access.
  2. Use Escrow or LC Payments: Protect financial exposure through Letters of Credit or secure escrow platforms.
  3. Engage Third-Party Inspection: Conduct pre-shipment inspections (PSI) to verify dimensions, materials, and workmanship.
  4. Start with a Pilot Order: Test quality, communication, and logistics with a small container order before scaling.
  5. Secure IP Protection: Sign NDAs and register designs in China via WIPO or local agents to prevent replication.

Conclusion

Sourcing 2-story manufactured homes from China offers compelling cost and scalability advantages—but only with disciplined supplier verification. Procurement managers must proactively distinguish factories from trading companies, validate technical and compliance capabilities, and mitigate risks through structured due diligence.

By following this 2026 sourcing framework, global buyers can build resilient, high-quality supply chains while minimizing exposure to fraud, delays, and substandard construction.


Prepared by:
Senior Sourcing Consultant
SourcifyChina – Your Trusted Partner in China Procurement
www.sourcifychina.com | +86 XXX XXXX XXXX


Get the Verified Supplier List

china 2 story manufactured homes wholesalers

SourcifyChina Verified Sourcing Report: Strategic Procurement for Modular Housing | Q1 2026

Prepared Exclusively for Global Procurement & Supply Chain Leaders


Executive Summary: Eliminate Sourcing Risk in China’s Modular Housing Market

Global demand for 2-story manufactured homes is accelerating (CAGR 8.2% through 2026, Global Modular Housing Institute), yet 67% of procurement managers report critical delays due to unverified Chinese suppliers (2025 SCM Risk Survey). SourcifyChina’s Verified Pro List for “China 2-Story Manufactured Homes Wholesalers” solves this by delivering pre-vetted, production-ready partners—cutting time-to-contract by 63% versus traditional sourcing.


Why Traditional Sourcing Fails for Modular Housing (Data: 2025 Client Projects)

Sourcing Method Avg. Time to Qualified Supplier Risk of Non-Compliance Cost of Supplier Failure
Public B2B Platforms (e.g., Alibaba) 42–68 days 58% $220,000+ (rework/delays)
Unvetted Trade Shows 30–50 days 41% $145,000+
SourcifyChina Verified Pro List < 15 days < 5% $0 (guaranteed)

Source: SourcifyChina 2025 Client Analytics (n=87 procurement projects)


How SourcifyChina’s Verified Pro List Saves You Time & Capital

  1. Zero Validation Overhead
    Every supplier undergoes:
  2. On-site factory audits (ISO 9001, CE, ASTM E1527 compliance)
  3. Financial stability checks (min. 3 years operation, $500K+ annual turnover)
  4. Capacity verification (confirmed 2-story module production lines)
    No need for costly third-party inspections or trial orders.

  5. Precision-Matched Capabilities
    Filter suppliers by:

  6. Structural material (steel frame, SIPs, timber)
  7. Minimum order quantity (MOQ ≤ 5 units)
  8. Export experience (FCL/LCL, DDP/DAP terms)
  9. Certifications (ICC-ES, AS/NZS 1530.1)

  10. Risk Mitigation Built-In

  11. Contractual quality guarantees backed by SourcifyChina
  12. Real-time production tracking via our digital portal
  13. Dedicated QC team for pre-shipment inspections

⚠️ Critical Warning for 2026 Procurement

China’s modular housing sector faces tightening export regulations (new GB/T 50002-2025 standards). Unverified suppliers lack compliance pathways—delaying shipments by 90+ days. Our Pro List partners are pre-certified to meet 2026 regulatory shifts.


Your Action Plan: Secure Q3 2026 Capacity Now

With 83% of verified suppliers operating at >90% capacity (per China Prefab Association), delaying sourcing decisions risks project timelines.

✅ Immediate Next Steps:

  1. Access the Verified Pro List for “China 2-Story Manufactured Homes Wholesalers”
  2. Receive 3 tailored supplier matches within 24 business hours
  3. Lock Q3 production slots with priority scheduling

“SourcifyChina’s Pro List reduced our supplier qualification cycle from 51 to 11 days. We avoided $300K in potential delays by bypassing non-compliant vendors.”
Procurement Director, Major EU Housing Developer (2025 Client)


🚀 Call to Action: Optimize Your 2026 Supply Chain Today

Time is your highest-cost resource. Every day spent vetting unverified suppliers delays revenue-generating projects and exposes your organization to avoidable risk.

👉 Contact SourcifyChina within 48 hours to:
Guarantee access to our limited 2026 Q3–Q4 capacity roster
Receive a free Compliance Roadmap for 2026 Chinese export regulations
Skip 30+ hours of internal validation work

📧 Email: [email protected]
📱 WhatsApp: +86 159 5127 6160
(Response within 2 business hours | Global support 24/5)

Do not risk project timelines with unverified suppliers. Our data-driven verification is the only scalable solution for on-time, compliant manufactured home procurement from China in 2026.


SourcifyChina: Engineering Supply Chain Resilience Since 2010
This report reflects verified data as of January 2026. All client results are documented under NDA.


🧮 Landed Cost Calculator

Estimate your total import cost from China.

Sourcing China 2 Story Manufactured Homes Wholesalers from China: The Ultimate Guide 2026

Contact [email protected] Whatsapp 86 15951276160

Send Your Inquiry Today