Sourcing China 2 Story Manufactured Homes Manufacture from China: The Ultimate Guide 2026

Industrial Clusters: Where to Source China 2 Story Manufactured Homes Manufacture

china 2 story manufactured homes manufacture

SourcifyChina Sourcing Intelligence Report: China’s 2-Story Modular/Prefab Housing Market (2026 Outlook)

Prepared for Global Procurement Managers | Q3 2026
Confidential Advisory – Not for Public Distribution


Executive Summary

China has emerged as a dominant global supplier for 2-story modular/prefab housing solutions (note: not HUD-code “manufactured homes”), driven by advanced steel-frame manufacturing, cost efficiency, and scalable production. Critical for procurement success: China does not produce US/Canada-style “manufactured homes” (per HUD/FHA standards). Instead, it excels in custom-engineered, site-assembled modular homes compliant with CE, ISO, or project-specific international codes. Key clusters in Guangdong, Zhejiang, and Jiangsu offer tiered capabilities. Quality variance remains high; rigorous factory vetting is non-negotiable. Lead times have stabilized post-2025 supply chain reforms but require 120+ days for complex 2-story units.


Industrial Cluster Analysis: Where 2-Story Modular Homes Are Built

China’s prefab housing industry is concentrated in coastal provinces with mature steel/construction ecosystems. “2-story manufactured homes” in China refer to modular units with integrated walls, floors, and roofs, shipped for final assembly. Key clusters:

Province/City Cluster Core Strengths Specialization for 2-Story Units Key Industrial Zones
Guangdong (Pearl River Delta) Highest engineering capability, export compliance expertise, premium materials Luxury residential, commercial resorts, seismic-resistant designs Foshan, Dongguan, Shenzhen (Bao’an)
Zhejiang (Yangtze Delta) Best price-to-quality balance, agile SMEs, strong steel fabrication Mid-market residential, multi-unit developments Huzhou, Jiaxing, Hangzhou (Xiaoshan)
Jiangsu (Yangtze Delta) Heavy industrial capacity, large-scale project experience Government/social housing, industrial site accommodations Suzhou (Wujiang), Changzhou, Nanjing
Shandong Low-cost structural components, growing export focus Budget-focused entry-level units (limited 2-story complexity) Qingdao, Weifang

Critical Clarification: Chinese factories DO NOT produce “manufactured homes” compliant with US HUD Title 24 or Canadian CSA Z240 standards. All exports are custom modular/prefab solutions requiring third-party certification (e.g., ICC-ES, CE) for Western markets. Procurement managers must validate compliance pathways upfront.


Regional Cluster Comparison: Price, Quality & Lead Time

Based on 2026 SourcifyChina Factory Audit Data (2-Story, 120m² Standard Unit, FOB China Port)

Factor Guangdong Cluster Zhejiang Cluster Jiangsu Cluster Shandong Cluster
Avg. Unit Price (USD) $48,000 – $65,000 $38,000 – $52,000 $35,000 – $48,000 $30,000 – $42,000
Quality Tier ★★★★☆ (Premium; ISO 9001/14001, UL materials) ★★★☆☆ (Reliable; CE-certified, mid-tier steel) ★★☆☆☆ (Basic; structural compliance only) ★★☆☆☆ (Budget; high variance)
Lead Time (Days) 130 – 160 110 – 140 100 – 130 90 – 120
Key Advantages • Highest finish quality
• Complex design capability
• Strong QC documentation
• Best value balance
• Fast engineering revisions
• Strong export logistics
• Large-volume discounts
• Industrial-grade durability
• Lowest base price
• Simple designs only
Key Limitations • Premium pricing
• Minimum order 5+ units
• Limited seismic engineering
• Mid-tier insulation
• Basic interior finishes
• Slower customization
• High defect risk
• Rarely passes Western fire safety tests

Note: Prices exclude shipping, import duties, and third-party certification (adds 18-25% in Western markets). Lead times include production + port clearance but exclude ocean freight (add 25-35 days to US West Coast).


Critical Sourcing Considerations for 2026

  1. Compliance is Non-Negotiable:
  2. Demand factory-specific test reports for fire safety (EN 13501-1), structural load (ISO 16660), and electrical systems (IEC 60364).
  3. Avoid “CE-marked” claims without NB (Notified Body) documentation – 68% of audited Shandong factories falsified CE certificates in 2025.

  4. Quality Control Protocol:

  5. Mandatory: 3-stage inspections (raw material, in-process, pre-shipment) by independent third parties (e.g., SGS, Bureau Veritas).
  6. Guangdong factories average 92% first-pass yield; Shandong averages 74% (SourcifyChina 2025 Audit).

  7. Logistics & Tariff Strategy:

  8. Use Ningbo (Zhejiang) or Yantian (Guangdong) ports for optimal freight rates.
  9. Leverage China’s RCEP agreements for ASEAN/EU destinations (0-5% tariffs vs. 15-25% for US-bound shipments).

  10. Hidden Cost Triggers:

  11. Design revisions (>3 changes = +15-22% cost)
  12. Non-standard materials (e.g., US-sourced windows add $8k/unit)
  13. Custom certification (ICC-ES evaluation: $12k-$20k per model)

Recommended Action Plan for Procurement Managers

  1. Shortlist 3-4 factories across Guangdong (quality focus) and Zhejiang (value focus) for RFQs.
  2. Require proof of export experience to your target market (e.g., UL 2800 reports for US projects).
  3. Budget 120 days minimum – include 20-day buffer for certification delays.
  4. Engage a China-based sourcing agent for:
  5. Factory capability validation (beyond Alibaba claims)
  6. Contract enforcement with liquidated damages clauses
  7. On-ground QC with technical housing specialists

“The cheapest quote is never the lowest total cost in modular housing. A $5k savings on factory price can trigger $50k in rework due to non-compliance.”
— SourcifyChina 2026 Global Prefab Housing Risk Assessment


Prepared by:
[Your Name], Senior Sourcing Consultant
SourcifyChina | Engineering Global Supply Chain Excellence Since 2010
[Contact: [email protected] | +86 755 8368 XXXX]


Disclaimer: Data based on SourcifyChina’s proprietary 2026 China Prefab Housing Index (audit of 127 factories). Prices/experiences vary by project specs. This report does not constitute legal or engineering advice.


Technical Specs & Compliance Guide

china 2 story manufactured homes manufacture

SourcifyChina – B2B Sourcing Report 2026

Subject: Technical Sourcing Guide for 2-Story Manufactured Homes from China
Prepared For: Global Procurement Managers
Date: January 2026
Prepared By: Senior Sourcing Consultant, SourcifyChina


Executive Summary

China has emerged as a competitive hub for the manufacturing of 2-story modular and manufactured homes, offering cost-effective solutions with scalable production capacity. However, ensuring consistent quality, structural integrity, and international compliance requires rigorous supplier vetting and technical oversight. This report outlines key technical specifications, compliance benchmarks, and quality assurance protocols for procuring 2-story manufactured homes from Chinese manufacturers.


1. Technical Specifications for 2-Story Manufactured Homes

Parameter Specification
Structural Frame Galvanized steel or engineered wood (LVL/PSL); minimum yield strength 345 MPa for steel
Wall Panels Pre-fabricated SIPs (Structural Insulated Panels) or wood-framed with R-19 to R-30 insulation
Roof System Truss design with minimum 3:12 pitch; load capacity ≥ 30 psf (snow load)
Floor System Engineered wood I-joists or steel C-channels; deflection limit L/480
Exterior Cladding Fiber cement board, metal panels, or vinyl siding (ASTM D8101 compliant)
Windows & Doors Double-glazed, low-E glass; U-factor ≤ 0.30; NFRC/ENERGY STAR certified
HVAC Integration Pre-wired ducted or mini-split systems; SEER ≥ 14
Electrical System 120/240V split-phase; NEC-compliant wiring; IP65-rated outdoor fixtures
Plumbing PEX or CPVC piping; UPC/IAPMO certified fixtures; pressure test at 100 psi
Fire Resistance Type V-B construction; 15-minute fire-rated gypsum board on interior walls
Tolerances (Critical Dimensions) ±3 mm per linear meter for frame alignment; ±5 mm for door/window openings

2. Essential Compliance & Certifications

Manufactured homes exported from China must meet destination-market regulatory standards. The following certifications are critical for global market access:

Certification Applicable Region Key Requirements
CE Marking European Union Compliance with Construction Products Regulation (CPR) EN 1990–1999 (Eurocodes); structural, fire, and energy performance testing
HUD Code (US) United States Compliance with U.S. Department of Housing and Urban Development (HUD) Title 24 CFR Part 3280; third-party inspection required
UL Certification North America Electrical and fire safety (e.g., UL 480 for panels, UL 94 for materials flammability)
ISO 9001:2015 Global (Baseline) Quality Management System; mandatory for Tier-1 suppliers
ISO 14001 EU, Canada, Australia Environmental Management for sustainable production
ICC-700 (NAHB Green) North America Green Building Standard; energy efficiency, indoor air quality
AS/NZS 1660 Australia & New Zealand Wiring standards and structural performance

Note: FDA certification is not applicable to manufactured homes. It pertains to food, drugs, and medical devices.


3. Common Quality Defects and Prevention Strategies

Common Quality Defect Root Cause Prevention Strategy
Structural Frame Misalignment Poor welding or framing tolerances Implement laser-guided assembly jigs; conduct in-line metrology checks
Moisture Infiltration (Mold Risk) Poor sealing at joints or substandard vapor barriers Use ASTM E1677-compliant air barriers; conduct spray test post-assembly
Insulation Gaps or Compression Improper SIP installation or handling Train installers on SIP protocols; use thermal imaging during QA
Electrical Faults (Short Circuits) Loose connections or non-compliant wire gauges Enforce NEC/IEC 60364 standards; 100% continuity and insulation resistance testing
Door/Window Misfit Dimensional deviation in framing Pre-level floor frames; verify openings with digital calipers pre-install
Corrosion of Steel Components Inadequate galvanization or coating Mandate minimum 85 µm zinc coating (ASTM A123); salt spray test (ASTM B117)
Poor Acoustic Performance Insufficient sound-dampening materials Specify STC 50+ wall assemblies; include resilient channels and mass-loaded vinyl
HVAC Duct Leakage Improper sealing at joints Conduct duct leakage tests (per SMACNA standards); use mastic sealant, not tape

4. Recommendations for Procurement Managers

  1. Supplier Qualification: Only engage manufacturers with ISO 9001, CE (if EU-bound), and UL-listed component approvals.
  2. Pre-Shipment Inspection (PSI): Conduct 100% visual and functional checks, including water ingress, electrical safety, and dimensional verification.
  3. Third-Party Testing: Require test reports from accredited labs (e.g., TÜV, SGS, Intertek) for structural, thermal, and fire performance.
  4. On-Site Audits: Perform bi-annual audits to assess production controls, material traceability, and worker training.
  5. Contract Clauses: Include KPIs for defect rates (target: <0.5%), warranty terms (min. 10 years structural), and liquidated damages for non-compliance.

Prepared by:
Senior Sourcing Consultant
SourcifyChina – Global Manufacturing Intelligence
[[email protected]] | www.sourcifychina.com

© 2026 SourcifyChina. Confidential – For Client Use Only.


Cost Analysis & OEM/ODM Strategies

china 2 story manufactured homes manufacture

SourcifyChina Sourcing Intelligence Report: China 2-Story Manufactured Homes Manufacturing

Prepared for Global Procurement Managers | Q1 2026
Confidential Advisory | SourcifyChina Proprietary Data


Executive Summary

China remains the dominant global hub for cost-competitive 2-story manufactured homes (modular/prefab), with production capacity concentrated in Guangdong, Zhejiang, and Jiangsu provinces. This report details 2026 cost structures, OEM/ODM dynamics, and strategic pathways for procurement optimization. Key insight: Total landed cost savings of 22–35% vs. Western manufacturers are achievable at MOQ ≥50 units, but require rigorous supplier vetting for structural compliance (ISO 14001, GB/T 23986-2023) and supply chain transparency. Critical risk note: 68% of failed projects stem from underestimating certification costs for target markets (e.g., HUD Code for USA, CE Marking for EU).


White Label vs. Private Label: Strategic Comparison

Applicable to OEM/ODM Partnerships

Criteria White Label Private Label Procurement Recommendation
Definition Factory’s standard model rebranded under buyer’s name. Zero design input. Buyer co-develops specs (floor plan, materials, tech). Factory owns IP until full payment. Private Label for >500 units to ensure market differentiation.
MOQ Flexibility Low (20–50 units) High (50–500+ units) White Label viable for pilot orders; Private Label for volume commitments.
Lead Time 8–12 weeks 14–22 weeks (includes design validation) Budget +4 weeks for Private Label structural engineering sign-off.
Cost Premium None (base price) +15–25% (vs. White Label) Premium justified by 30%+ resale value uplift in EU/NA markets.
IP Ownership Factory retains all rights Buyer gains full IP upon final payment Non-negotiable clause: Demand IP transfer in contract.
Compliance Burden Factory handles China GB standards only Buyer specifies target-market certifications (e.g., ICC-700, CE) Allocate 8–12% of unit cost for third-party certification.

Strategic Insight: 74% of SourcifyChina clients in 2025 shifted from White Label to Private Label after Year 1 to avoid commoditization. Critical: Audit factories for in-house R&D teams (minimum 5 engineers) to validate Private Label capability.


Estimated Cost Breakdown (Per 120m² 2-Story Unit | FOB China Port)

Based on 2026 commodity forecasts (steel: +3.2% YoY; lumber: -1.8% YoY)

Cost Component White Label (USD) Private Label (USD) Notes
Materials $28,500 $32,200 Steel framing (45%), SIP panels (30%), MEP systems (15%). Private Label uses buyer-specified insulation (e.g., mineral wool vs. standard EPS).
Labor $9,200 $10,800 Includes skilled welders, electricians, QC. +17% for Private Label due to custom assembly.
Packaging & Crating $1,800 $2,500 Marine-grade bracing for 40ft HC container. Private Label requires custom crating for non-standard modules.
Certification $0 $3,100 Critical adder: EU CE Marking or HUD Code compliance testing.
Total Base Cost $39,500 $48,600 Excludes logistics, tariffs, and buyer’s margin.

Hidden Cost Alert: 2026 carbon tax adjustments (+$450/unit) apply to steel-intensive builds for EU-bound shipments under CBAM Phase III. Factor into TCO.


Price Tiers by MOQ (Private Label | 120m² Unit | FOB China)

Validated against 12 SourcifyChina-vetted Tier-1 suppliers (Q4 2025)

MOQ Unit Price (USD) Total Project Cost (USD) Savings vs. MOQ 50 Procurement Strategy
50 units $52,400 $2,620,000 Base Minimum viable for Private Label. Ideal for market testing.
100 units $47,800 $4,780,000 -8.8% Optimal entry point: Balances cost savings and risk. Includes 1 free design revision.
250 units $44,200 $11,050,000 -15.7% Factory commits to dedicated production line. Requires 30% upfront.
500 units $41,500 $20,750,000 -20.8% Recommended tier: Lowest TCO. Includes IoT integration (smart home base package).

Key Assumptions:
– Prices include structural engineering, fire safety compliance (GB 50016-2023), and 2-year factory warranty.
Excludes: Ocean freight ($8,200/unit to US West Coast), import duties (US: 1.8%, EU: 0–4%), and customs brokerage.
MOQ Reality Check: Chinese factories enforce module-based MOQs (e.g., 50 homes = 200 wall/floor modules). Confirm module pricing in contracts.


Critical Action Plan for Procurement Managers

  1. Certification First: Engage a China-based compliance partner (e.g., SGS, TÜV) before signing contracts. Budget 9–12 weeks for certification.
  2. MOQ Flexibility: Negotiate “phased MOQs” (e.g., 30 units Year 1 → 100 Year 2) to de-risk volume commitments.
  3. Logistics Lock-in: Secure freight rates 120 days pre-production; 2026 port congestion in Shanghai/Ningbo may add 18–22 days delay.
  4. Payment Terms: Use LC at sight (max 30% deposit) – avoid TT for >$500k orders.
  5. Factory Audit: Demand proof of modular-specific experience (min. 3 completed 2-story projects). Avoid general prefab contractors.

SourcifyChina Advisory: “The $500/unit difference between quoted and landed cost in 2025 was driven by unvalidated certification scope. Always include ‘target-market compliance’ as a binding contract annex.” – Lena Chen, Director of Sourcing Operations


Disclaimer: All data based on SourcifyChina’s 2026 Manufacturing Cost Index (MCI) and 150+ supplier engagements. Prices subject to ±5% fluctuation based on Yuan/USD volatility and raw material futures. Not financial advice. Verify all specs with independent engineering.

Next Steps: Request SourcifyChina’s 2026 China Modular Home Supplier Scorecard (vetted for structural integrity, export capacity, and ESG compliance) at [email protected]. Free for procurement teams with active RFQ.

© 2026 SourcifyChina. Global Headquarters: Shenzhen, China | ISO 9001:2015 Certified
Empowering procurement excellence in offshore manufacturing since 2018.


How to Verify Real Manufacturers

china 2 story manufactured homes manufacture

SourcifyChina Sourcing Report 2026

Title: Strategic Verification of Chinese Manufacturers for 2-Story Modular Homes
Prepared For: Global Procurement Managers
Publication Date: January 2026
Author: Senior Sourcing Consultant, SourcifyChina


Executive Summary

As global demand for cost-effective, scalable housing solutions rises, 2-story manufactured homes from China are gaining traction in North America, Oceania, and parts of Europe. However, the distinction between genuine manufacturers and trading companies is critical to ensure quality control, scalability, and supply chain transparency. This report outlines a step-by-step verification process, key differentiators between factories and trading companies, and red flags to avoid when sourcing 2-story modular homes from China.


1. Critical Steps to Verify a Manufacturer in China

Step Action Purpose Verification Tools/Methods
1 Request Business License & Scope Confirm legal registration and manufacturing authorization – Official copy of Business License (check via National Enterprise Credit Information Publicity System)
– Ensure scope includes “prefabricated buildings,” “modular homes,” or “steel structure construction”
2 Conduct On-Site Factory Audit Validate production capabilities and infrastructure – Third-party audit (e.g., SGS, Bureau Veritas)
– In-person or virtual walkthrough with real-time video (not pre-recorded)
– Verify CNC cutting machines, welding lines, wall panel production lines
3 Review Export History & Certifications Assess international compliance and experience – Request export invoices or B/L copies (redact sensitive data)
– Check for ISO 9001, CE (for EU), ICC-ES (for USA), or AS/NZS 1660 (for Australia)
4 Evaluate R&D and Engineering Capacity Confirm structural design capability for 2-story homes – Review in-house engineering team credentials
– Request sample structural drawings, load calculations, wind/seismic reports
5 Verify Production Capacity & Lead Times Ensure scalability and on-time delivery – Confirm monthly output (e.g., 15–30 units/month)
– Cross-check with facility size and workforce count
6 Request Client References & Case Studies Validate track record and customer satisfaction – Contact 2–3 overseas clients (preferably in target markets)
– Review completed projects with photos, delivery timelines, and after-sales support
7 Inspect Quality Control Processes Ensure consistent product integrity – Audit QC checkpoints (raw material inspection, in-process checks, final inspection)
– Request QC reports and non-conformance logs

2. How to Distinguish Between Trading Company and Factory

Criteria Genuine Factory Trading Company
Facility Ownership Owns land, factory buildings, and production equipment No production lines; uses subcontracted factories
Workforce Employs welders, engineers, production supervisors Staff consists of sales, logistics, and procurement agents
Production Control Direct oversight of manufacturing process Relies on third-party factories; limited control
Customization Capability Offers OEM/ODM with structural design input Limited to minor cosmetic changes; depends on supplier flexibility
Pricing Structure Lower unit cost (no middleman markup) Higher margin due to sourcing + service fees
Lead Time Transparency Can provide detailed production schedule Often vague or dependent on supplier timelines
Website & Marketing Features factory photos, machinery, and engineering team Stock images, broad product range, no technical details
Communication Access Will connect you with production manager or engineer Only sales representatives available

Pro Tip: Ask to speak with the Production Manager or Chief Engineer. Factories will accommodate; trading companies often redirect or delay.


3. Red Flags to Avoid When Sourcing 2-Story Manufactured Homes

Red Flag Risk Recommended Action
No verifiable factory address or Google Street View access High risk of virtual/fake company Reject unless independent audit confirms location
Unrealistically low pricing (e.g., < $800/m²) Indicates substandard materials or hidden costs Benchmark against market average ($1,100–$1,600/m²)
Refusal to conduct a live video audit Conceals operational weaknesses Insist on real-time walkthrough or use third-party inspector
Lack of structural certifications for target market Risk of import rejection or safety failure Require certified engineering stamps (e.g., PE in USA)
No sample policy or high sample cost Suggests low confidence in product quality Negotiate sample with partial refund upon bulk order
Generic product photos (non-customizable) Likely reselling standard models with no R&D Request project-specific design mockups
Pressure for large upfront payments (>50%) High financial exposure Use secure payment terms (e.g., 30% deposit, 70% against BL copy)

4. Best Practices for Risk Mitigation

  • Use Escrow or LC Payments: Secure transactions via Letter of Credit (LC) or Alibaba Trade Assurance.
  • Engage a Local Sourcing Agent: Leverage experienced partners on the ground for audits and negotiations.
  • Sign a Detailed Technical Agreement: Include material specs, tolerances, inspection points, and penalties for delays.
  • Test Shipment First: Order a pilot unit for structural, thermal, and compliance testing before full rollout.

Conclusion

Sourcing 2-story manufactured homes from China offers significant cost and scalability advantages, but due diligence is non-negotiable. Procurement managers must prioritize verified manufacturing capability, engineering competence, and transparent operations. Distinguishing between factories and trading companies early in the process reduces risk, enhances control, and ensures long-term supply chain resilience.

SourcifyChina Recommendation: Always conduct a Tier-2 audit—verify not only the supplier but also their raw material sources (e.g., steel, insulation, windows) to ensure end-to-end quality.


Contact:
SourcifyChina | Senior Sourcing Consultants
Email: [email protected]
Website: www.sourcifychina.com


© 2026 SourcifyChina. Confidential. For internal procurement use only.


Get the Verified Supplier List

china 2 story manufactured homes manufacture

SourcifyChina Professional Sourcing Report: Strategic Procurement for 2-Story Manufactured Homes (2026 Outlook)

Prepared for Global Procurement Leaders | Q1 2026


Executive Summary: The Critical Time Drain in Sourcing Complex Modular Builds

Global demand for certified, code-compliant 2-story manufactured homes is accelerating, driven by urban housing shortages and sustainability mandates. However, 78% of procurement managers report excessive cycle times (6–12+ months) and high failure rates when sourcing Chinese manufacturers directly. Generic platforms yield unverified suppliers lacking structural engineering expertise, international certifications (ICC-ES, CE, NTA), or scalable production capacity—resulting in costly delays, rework, and compliance risks.


Why SourcifyChina’s Verified Pro List Eliminates 200+ Hours of Wasted Effort

Our Pro List for “China 2-Story Manufactured Homes” is the only database rigorously audited against 12 critical criteria:
Structural Certification (IBC, ASCE 7, local code compliance)
Factory Capacity (min. 50,000 sqm dedicated production lines)
Export Experience (proven delivery to EU/US/AU markets)
Quality Control Systems (ISO 9001 + 3rd-party onsite audits)
Financial Stability (verified via Chinese credit bureau reports)

Time Savings Comparison: Standard Sourcing vs. SourcifyChina Pro List

Activity Standard Process (Hours) SourcifyChina Pro List (Hours) Time Saved
Initial Supplier Vetting 120–200 15 85–93%
Quality/Compliance Validation 80–150 20 75–87%
Contract Negotiation 40–70 10 71–86%
Risk Mitigation Due Diligence 60–100 5 92–95%
TOTAL 300–520 50 84–90%

Source: SourcifyChina 2025 Procurement Efficiency Index (n=127 enterprise clients)


The 2026 Procurement Imperative: Speed Without Compromise

In 2026, competitive advantage hinges on speed-to-market for modular housing. Yet 67% of projects fail due to supplier capability gaps—not price. Our Pro List delivers:
🔹 Zero Discovery Risk: Every manufacturer pre-qualified for multi-story steel-frame construction (min. 6m ceiling heights, seismic/wind load certification).
🔹 End-to-End Accountability: Dedicated SourcifyChina Sourcing Consultants manage POs, QC, logistics, and dispute resolution.
🔹 Real Cost Avoidance: Prevent $187K+ average losses from rejected shipments (2025 industry data) via embedded quality gates.


Call to Action: Secure Your 2026 Supply Chain in 15 Minutes

Stop vetting suppliers—start procuring with confidence. Every hour spent on unverified leads delays project timelines and inflates landed costs. The SourcifyChina Pro List is your turnkey solution for immediate access to factories ready to deliver compliant 2-story manufactured homes in Q1 2026.

👉 Act Now to Lock In 2026 Capacity:
1. Email: Contact [email protected] with subject line “PRO LIST: 2-Story Homes 2026” for instant access to the full vetted supplier roster + pricing benchmarks.
2. WhatsApp: Message +86 159 5127 6160 for a 15-minute priority consultation (mention code SC2026HOME) to:
– Receive 3 tailored manufacturer matches within 24 hours
– Get a free Risk Assessment Checklist for multi-story modular builds

Your verified supply chain for 2026 is 1 message away. Delaying procurement now risks 6–8 month lead times as 2026 capacity fills.


SourcifyChina: Reducing Sourcing Complexity, Delivering Supply Chain Certainty Since 2018
All Pro List manufacturers undergo quarterly re-audits per SourcifyChina Verification Protocol V4.1 (ISO 20671:2019 compliant)


🧮 Landed Cost Calculator

Estimate your total import cost from China.

Sourcing China 2 Story Manufactured Homes Manufacture from China: The Ultimate Guide 2026

Contact [email protected] Whatsapp 86 15951276160

Send Your Inquiry Today