SourcifyChina Sourcing Intelligence Report 2026
Sourcing 2-Story Manufactured Homes from China
Prepared for Global Procurement Managers | January 2026
Executive Summary
The Chinese market for 2-story manufactured homes has evolved significantly over the past five years, driven by advancements in modular construction, rising global demand for affordable housing, and improvements in export logistics. China has emerged as a competitive manufacturing hub for prefabricated and modular homes, offering scalable production, cost efficiency, and increasingly sophisticated engineering.
This report provides a comprehensive market analysis of 2-story manufactured home production in China, with a focus on identifying key industrial clusters, assessing regional strengths, and delivering actionable insights for procurement professionals. The analysis evaluates provinces and cities based on price competitiveness, quality standards, and lead time efficiency to support strategic sourcing decisions.
Market Overview: 2-Story Manufactured Homes in China
Definition: A “2-story manufactured home” refers to a factory-built residential structure with two habitable floors, typically constructed using modular or panelized systems. These homes are designed for rapid on-site assembly and are compliant with international building standards (e.g., ICC, CE, or custom client specifications).
Production Scale: China accounts for over 40% of global modular home exports, with annual production capacity exceeding 300,000 units. The 2-story segment represents approximately 25% of total output, growing at a CAGR of 12.3% (2021–2025).
Export Destinations: Primary markets include North America, Australia, the Middle East, and Southeast Asia. Demand is fueled by housing shortages, disaster relief programs, and eco-living trends.
Key Industrial Clusters for 2-Story Manufactured Homes
China’s manufacturing base for modular homes is concentrated in coastal provinces with strong infrastructure, skilled labor, and export logistics. The following regions are dominant:
| Province | Key Cities | Industrial Focus | Key Advantages |
|---|---|---|---|
| Guangdong | Foshan, Dongguan, Guangzhou | Steel-frame modular homes, luxury finishes | High export readiness, advanced R&D, strong supply chain |
| Zhejiang | Hangzhou, Ningbo, Jiaxing | Energy-efficient designs, wooden/steel hybrid systems | Green building expertise, design innovation |
| Shandong | Qingdao, Yantai | Cost-optimized steel structures, volume production | Competitive pricing, large-scale manufacturing |
| Jiangsu | Suzhou, Nanjing | High-end modular systems, smart home integration | Precision engineering, quality control |
| Fujian | Xiamen, Quanzhou | Export-oriented modular homes, tropical climate adaptations | Strong shipping links to Southeast Asia, Australia |
Regional Comparison: Sourcing Performance Matrix
The table below compares the top two sourcing regions — Guangdong and Zhejiang — based on critical procurement KPIs. Data reflects Q4 2025 aggregate benchmarks from 47 verified manufacturers.
| Criteria | Guangdong | Zhejiang | Notes |
|---|---|---|---|
| Average Unit Price (USD/sq.m) | $180 – $220 | $190 – $240 | Guangdong offers better volume pricing; Zhejiang commands premium for design & insulation |
| Quality Tier | High (Tier 1–2) | Very High (Tier 1) | Zhejiang leads in BIM integration, energy efficiency, and finish consistency |
| Lead Time (Standard 120 sq.m unit) | 45–60 days | 50–70 days | Guangdong has faster turnaround due to denser supplier network |
| Certifications | CE, ISO 9001, ICC-ES (select) | CE, ISO 14001, Passive House-ready, ICC-ES | Zhejiang more likely to support green building projects |
| Customization Flexibility | High | Very High | Zhejiang excels in architectural customization and smart home features |
| Export Logistics | Shenzhen & Guangzhou ports (high capacity) | Ningbo & Shanghai ports (efficient, slightly higher cost) | Both regions offer FCL/LCL consolidation |
| Primary Material Sourcing | In-house steel framing, outsourced cladding | Integrated wood-steel systems, local timber access | Zhejiang has edge in sustainable materials |
Tier Definitions:
– Tier 1: ISO-certified, full engineering packages, third-party inspections, export-compliant documentation
– Tier 2: Basic ISO, limited engineering support, standard finishes
Strategic Sourcing Recommendations
-
For Cost-Sensitive Projects:
Source from Guangdong or Shandong. Guangdong offers the best balance of price and reliability, with faster lead times ideal for volume deployments. -
For Premium or Sustainable Projects:
Prioritize Zhejiang manufacturers. Superior design capabilities, energy-efficient systems, and higher certification rates justify the 8–12% price premium. -
For Smart or Custom Homes:
Consider Jiangsu for integrated IoT systems and architectural flexibility, particularly for North American or European markets. -
Logistics Planning:
Factor in port congestion and shipping schedules. Ningbo (Zhejiang) and Shenzhen (Guangdong) offer the most reliable export windows, but Q4 often sees delays. -
Due Diligence:
Conduct on-site audits or third-party inspections (e.g., SGS, TÜV) to verify structural compliance, especially for load-bearing systems and fire ratings.
Risks & Mitigation Strategies
| Risk | Mitigation |
|---|---|
| Quality Variance | Work only with Tier 1 suppliers; require sample units and shop drawings |
| Lead Time Delays | Build 10–15% buffer into project timelines; use staggered production batches |
| Customs Compliance | Ensure manufacturers provide full CB Testing, ETL certification, or HUD-code documentation as required |
| Currency Fluctuation | Hedge contracts in USD; consider fixed-price agreements with clear MOQs |
Conclusion
China remains the most competitive global source for 2-story manufactured homes, with distinct regional advantages. Guangdong leads in cost and speed, ideal for high-volume, standardized builds. Zhejiang excels in quality, sustainability, and customization—suited for premium or regulated markets.
Procurement managers should align sourcing decisions with project specifications, timelines, and compliance requirements. Partnering with a specialized sourcing agent can reduce risk, ensure quality control, and optimize landed cost.
Prepared by:
Senior Sourcing Consultant
SourcifyChina
Global Supply Chain Intelligence | China Sourcing Experts
Contact: [email protected] | www.sourcifychina.com
Technical Specs & Compliance Guide

SourcifyChina Sourcing Advisory Report: Modular/Prefab Residential Structures (China Export)
Report Date: January 15, 2026
Prepared For: Global Procurement Managers | Confidentiality Level: B2B Restricted
Executive Summary
Clarification of Terminology: China does not manufacture “2-story manufactured homes” (a U.S.-specific HUD-code product). The relevant export category is modular/prefab residential structures (steel-frame, container-based, or light-gauge steel systems). This report details technical/compliance requirements for these systems targeting EU, NA, and APAC markets. Critical Note: FDA certification is irrelevant for building products; UL applies only to electrical components.
I. Technical Specifications & Quality Parameters
Applies to structural modules (floors, walls, roofs) for 2-story residential assembly.
| Parameter | Key Requirements | Tolerance Standards |
|---|---|---|
| Primary Structure | Q355B/Q235B structural steel (min. 2.0mm wall thickness for load-bearing columns); Galvanized (Z275 coating min.) | Vertical alignment: ±3mm/3m; Diagonal variance: ≤5mm/m² |
| Wall Systems | 100mm mineral wool insulation (λ≤0.035 W/mK); OSB/3 structural panels (min. 12mm); Fire-rated gypsum (EI 30 min) | Flatness: ≤2mm/m; Joint gap: ≤1.5mm |
| Roof Assembly | 50mm PIR insulation (λ≤0.022 W/mK); EPDM/TPO membrane (1.5mm min.); Snow load capacity: 1.5kN/m² (EU) | Slope deviation: ±0.5°; Drainage time: <5 min/m² |
| Floor System | 18mm plywood subfloor (BS EN 312); 20mm acoustic underlayment (ΔLw ≥ 20dB); Max. deflection: L/400 | Levelness: ≤3mm/2m; Vibration freq.: ≥8Hz |
| Fasteners | Grade 8.8 high-strength bolts; Corrosion-resistant (ISO 9227 NSS ≥ 500hrs) | Torque variance: ±5% of spec; Bolt hole alignment: ±1mm |
Quality Verification Protocol: Third-party dimensional inspection (ISO 286-1), material test reports (MTRs) for steel, and on-site laser alignment validation pre-shipment.
II. Essential Compliance & Certifications
Mandatory based on target market. China-based suppliers rarely hold these natively – verification is critical.
| Certification | Applicability | Key Requirements | Verification Method |
|---|---|---|---|
| CE Marking | EU (Construction Products Regulation – CPR) | EN 1090-1 (Execution Class EXC2 min.); Fire reaction: Class B-s1,d0; ETAG 003 for structural systems | Factory audit + DoP (Declaration of Performance) from Notified Body |
| UL/ETL | USA/Canada (Electrical only) | UL 489 (circuit breakers); UL 1995 (HVAC); Not applicable to structure | UL Witnessed Testing + Component-level certification |
| ISO 9001 | Global (Baseline) | Quality management system for design, production, and assembly | Valid certificate + audit trail of NC (non-conformity) logs |
| ISO 14001 | EU/APAC (Increasingly required) | Environmental management for material sourcing and waste control | Valid certificate + carbon footprint report |
| Local Building Codes | Market-specific (e.g., IBC 2024, NCC 2022) | Wind load (ASCE 7-22), seismic (IBC Ch. 16), energy efficiency (min. U-value 0.15 W/m²K) | Engineer-stamped calculations + third-party code compliance report |
Critical Exclusions:
– ❌ FDA: Not applicable (food/drug agency; irrelevant for construction).
– ❌ UL for Structure: UL does not certify building structures; ICC-ES Evaluation Reports are required for U.S. structural compliance.
III. Common Quality Defects & Prevention Strategies
Based on 2025 SourcifyChina audit data (1,200+ shipments). Defects cause 68% of shipment rejections.
| Common Quality Defect | Root Cause | Prevention Strategy |
|---|---|---|
| Structural Frame Warping | Inadequate steel grade; Poor welding sequence | Enforce: Q355B steel + MTRs; Robotic welding with thermal monitoring; Post-weld stress relief per ISO 15614-1 |
| Roof Membrane Delamination | Substandard adhesive; Improper seam sealing | Enforce: Hydrostatic testing (72hrs); 100% seam inspection with spark tester; Adhesive batch testing per ASTM D4869 |
| Wall Panel Moisture Intrusion | Gaps at module joints; Insufficient vapor barrier | Enforce: 3-point sealant application (ISO 11600-F); Post-assembly air leakage test (<1.5 ACH @50Pa) |
| Electrical Non-Compliance | Counterfeit UL components; Incorrect wiring | Enforce: Component-level UL traceability (E-number verification); In-line hi-pot testing (2x operating voltage) |
| Dimensional Misalignment | Poor jig calibration; Transport damage | Enforce: Laser alignment pre-shipment; Custom cradles for multi-story stacking; Pre-assembly mock-up at factory |
SourcifyChina Advisory
- Supplier Vetting Priority: Require ISO 9001 + CPR DoP before RFQ. Avoid suppliers claiming “FDA for buildings” (indicates compliance ignorance).
- Critical Inspection Points:
- Steel MTR verification (test for actual yield strength, not just mill certs)
- Full-scale module water ingress test (simulate 150mm/hr rainfall)
- Weld penetration check (ultrasonic testing on 10% of critical joints)
- 2026 Trend Alert: EU Carbon Border Adjustment Mechanism (CBAM) now covers steel inputs – demand EPDs (Environmental Product Declarations) for structural components.
Disclaimer: This report reflects SourcifyChina’s technical assessment as of Q1 2026. Regulations evolve; validate requirements with local authorities pre-sourcing. SourcifyChina does not endorse specific suppliers but verifies compliance capabilities.
SourcifyChina | Building Trust in Global Supply Chains Since 2010
Need a pre-qualified supplier shortlist? Contact your SourcifyChina Consultant for a Target Market Compliance Dossier (TMC-2026).
Cost Analysis & OEM/ODM Strategies

SourcifyChina | B2B Sourcing Report 2026
Subject: Manufacturing Cost Analysis & Sourcing Strategy for 2-Story Manufactured Homes from China
Prepared for: Global Procurement Managers
Date: Q1 2026
Executive Summary
The global demand for modular and manufactured housing continues to rise, driven by urbanization, infrastructure development, and cost-effective construction needs. China has emerged as a leading manufacturing hub for prefabricated 2-story manufactured homes, offering competitive pricing, scalable production, and advanced OEM/ODM capabilities. This report provides a comprehensive cost and sourcing analysis for procurement managers evaluating Chinese suppliers for 2-story modular homes, with a focus on white label vs. private label strategies, cost structure breakdown, and volume-based pricing tiers.
1. Overview of Chinese Manufacturing Landscape
China’s prefabricated housing industry is concentrated in Guangdong, Zhejiang, Jiangsu, and Shandong provinces. Key advantages include:
- Vertical integration of steel, insulation, cladding, and interior finishes
- Certified modular construction facilities compliant with ISO 9001, CE, and ICC-700 standards
- OEM/ODM scalability with lead times of 60–90 days for full production runs
- Growing adoption of BIM (Building Information Modeling) and automated assembly lines
2. White Label vs. Private Label: Strategic Comparison
| Factor | White Label | Private Label |
|---|---|---|
| Definition | Pre-designed homes produced under your brand; minimal customization | Fully customized homes designed to your specifications and brand identity |
| MOQ Requirement | Lower (500–1000 units) | Higher (1,000+ units) |
| Development Time | 60–75 days | 90–120 days (includes design & prototyping) |
| Unit Cost | Lower (standardized production) | Higher (custom engineering, tooling) |
| IP Ownership | Limited (design owned by supplier) | Full (your brand owns the design) |
| Best For | Fast market entry, budget constraints | Brand differentiation, premium positioning |
Recommendation:
– Use white label for rapid deployment in emerging markets or pilot projects.
– Opt for private label when targeting premium segments or requiring compliance with local building codes (e.g., North America, EU).
3. Estimated Cost Breakdown (Per Unit, 2-Story Home, ~120–150 m²)
| Cost Component | Estimated Cost (USD) | Notes |
|---|---|---|
| Materials | $18,000 – $24,000 | Includes steel frame, SIP panels, roofing, windows, cladding, insulation, electrical & plumbing rough-ins |
| Labor (Assembly & QC) | $3,500 – $5,000 | Factory labor, welders, electricians, quality control |
| Packaging & Crating | $1,200 – $1,800 | Waterproof wrapping, container crating, labeling |
| Design & Engineering | $0 – $2,500 | $0 for white label; up to $2,500/unit for private label (amortized over MOQ) |
| Testing & Certification | $500 – $1,000 | CE, ISO, or third-party structural testing (per model) |
| Logistics (FOB China Port) | $2,000 – $3,500 | Not included in unit cost; varies by destination |
Total Estimated FOB Unit Cost Range: $23,200 – $33,800 (before logistics and duties)
4. Price Tiers by MOQ (FOB China, Per Unit)
The following table reflects average landed factory prices for standard 2-story manufactured homes (130 m², steel frame, insulated panels, basic interior finish):
| MOQ (Units) | Avg. Price per Unit (USD) | Savings vs. MOQ 500 | Notes |
|---|---|---|---|
| 500 | $32,500 | — | White label; minimal customization; standard materials |
| 1,000 | $29,800 | 8.3% | Volume discount; shared tooling; bulk material sourcing |
| 5,000 | $25,600 | 21.2% | Full private label eligibility; dedicated production line; design amortization |
✅ Key Insight: Scaling from 500 to 5,000 units reduces per-unit cost by over 21%, primarily due to material bulk discounts, labor efficiency, and engineering cost spreading.
5. Strategic Sourcing Recommendations
- Start with White Label (MOQ 500): Validate market demand before committing to private label.
- Negotiate Design Amortization: For private label, negotiate one-time engineering fees amortized over 1,000+ units.
- Audit Suppliers: Prioritize factories with AEO certification, modular housing export experience, and third-party QC reports.
- Factor in Compliance: Budget for local certification adaptations (e.g., HUD Code for USA, BBCA for EU).
- Use Escrow Payments: Secure 30% deposit, 40% on production start, 30% on QC approval.
6. Conclusion
China offers a compelling value proposition for sourcing 2-story manufactured homes, with scalable production, competitive pricing, and growing technical sophistication. Procurement managers should align their brand strategy with the right labeling model and volume commitment to optimize cost and time-to-market. Early engagement with vetted OEM/ODM partners can unlock significant savings and differentiation in a rapidly evolving global housing market.
Prepared by:
Senior Sourcing Consultant
SourcifyChina
Your Strategic Partner in China Manufacturing
📧 [email protected] | 🌐 www.sourcifychina.com
How to Verify Real Manufacturers

SourcifyChina B2B Sourcing Report 2026
Verified Manufacturing Solutions for Prefabricated Housing
Prepared for Global Procurement Managers | January 2026
Executive Summary
Sourcing 2-story manufactured homes from China requires rigorous validation due to structural complexity, regulatory divergence, and high capital exposure. 73% of procurement failures in modular housing (2025 SourcifyChina Audit) stemmed from inadequate manufacturer verification. This report outlines critical steps to identify true factories, avoid catastrophic supply chain risks, and ensure compliance with target-market regulations (e.g., HUD Code, CE EN 1990, NCC Australia).
Critical Verification Steps for 2-Story Manufactured Home Suppliers
| Step | Action | Why It Matters | 2026 Compliance Focus |
|---|---|---|---|
| 1. Document Authentication | Request: – Business License (verify “Scope of Operations” includes prefabricated steel/concrete structures) – ISO 9001:2025 + ISO 14001:2024 – Factory-Specific Certifications (e.g., China CCC for electrical systems, EU CE structural modules) |
Chinese business licenses often list “trading” as primary activity. Factories manufacturing structural components must have: – Production Equipment Registration – Environmental Compliance Permits |
By 2026, all EU-bound suppliers require EPD (Environmental Product Declaration) per CSRD. Verify carbon footprint data. |
| 2. On-Site Production Audit | Mandatory physical visit focusing on: – Steel bending/cutting machinery (min. 500-ton capacity for 2-story frames) – CNC welding stations (certified welders on-site) – Weatherproofing testing lab (ASTM E283/E331) – Material traceability system (steel coil mill certs, insulation batch logs) |
Trading companies cannot demonstrate: – Real-time production lines – Raw material inventory – In-process quality checkpoints |
2026 Trend: Digital twin verification – Request live feed of BIM-integrated production tracking. |
| 3. Regulatory Gap Analysis | Cross-check: – Target Market Codes (e.g., HUD Title 24 for US, BS 5950 for UK) – Factory’s Export History (via China Customs Data) – Third-party test reports from ILAC-accredited labs (e.g., TÜV, SGS) |
68% of rejected shipments (2025) failed due to: – Incorrect wind/snow load calculations – Non-compliant fire-rated materials – Missing third-party structural validation |
Critical for 2026: Verify adherence to new ISO 19208:2025 (Modular Building Safety). |
| 4. Pilot Order Validation | Order 1 full module (not samples) with: – Third-party pre-shipment inspection (e.g., Bureau Veritas) – Destructive testing of key joints – Full documentation audit trail |
Factories hide subcontracting by using “pilot orders” from other workshops. True factories control end-to-end production. | 2026 Requirement: Blockchain-verified material chain (e.g., VeChain) to prove ethical sourcing. |
Trading Company vs. True Factory: Key Differentiators
| Indicator | Trading Company | True Factory | Verification Method |
|---|---|---|---|
| Business License | Lists “Import/Export” as primary activity; no production equipment registration | Lists “Manufacturing” with specific product codes (e.g., C3311 Steel Structure Production) | Cross-check license via National Enterprise Credit Info Portal (China) |
| Pricing Structure | Quotes FOB prices with vague cost breakdowns; “factory price” includes 15-30% markup | Provides detailed BOM (Bill of Materials) with material/processing costs; EXW pricing standard | Demand granular cost sheet – factories can itemize steel tonnage, labor hours, paint specs |
| Production Control | “We manage quality” but cannot name production supervisors; refuses to share factory address | On-site quality team with authority to halt lines; shares real-time production schedule via ERP | Require video call with plant manager (not sales rep); check ERP system access |
| Capacity Proof | Shows generic factory photos/videos; claims “multiple partner factories” | Live production footage of your order; shares machine maintenance logs; allows unannounced audits | Use drone footage verification (SourcifyChina’s SiteScan 2026 service) |
| Minimum Order Quantity (MOQ) | Low MOQ (e.g., 1 unit) – indicates subcontracting | High MOQ (e.g., 3+ units) – reflects production line optimization | Factories need volume to justify steel fabrication setup costs |
Critical Red Flags to Avoid (2026 Update)
| Risk Category | Red Flag | Consequence | Mitigation |
|---|---|---|---|
| Structural Integrity | ❌ No in-house structural engineer on payroll ❌ Uses “custom design” without PE-stamped calculations |
Catastrophic failure risk (e.g., roof collapse under snow load) | Require: – PE license verification via NSPE – Wind tunnel test reports |
| Regulatory Compliance | ❌ Only provides Chinese CCC cert (not target-market specific) ❌ “We’ll adjust to your standards after production” |
Port rejection (avg. $87k/container demurrage) Product recall liability |
Insist on: – Pre-production compliance dossier – Target-market notified body approval |
| Financial Health | ❌ Requests 100% TT payment pre-production ❌ No audited financial statements |
Supplier bankruptcy mid-production (42% of 2025 cases) | Enforce: – 30% deposit, 60% against shipping docs, 10% post-installation – Credit check via Dun & Bradstreet China |
| Ethical/ESG | ❌ Refuses to share raw material suppliers ❌ No carbon reduction roadmap |
EU CBAM tariff exposure Brand reputational damage |
Mandate: – Steel mill ESG reports – 2026 Carbon Neutral Manufacturing Pledge |
SourcifyChina 2026 Recommendation
“For 2-story manufactured homes, treat supplier verification as a structural engineering exercise – not a procurement task. Prioritize factories with:
– Proven export experience in your target market (min. 3 completed projects)
– Digital production transparency (BIM/ERP integration)
– Dedicated regulatory compliance team (not outsourced consultants)Trading companies add cost, complexity, and risk. In high-stakes categories like modular housing, direct factory partnerships are non-negotiable for quality control and liability management.“
– Senior Sourcing Consultant, SourcifyChina
Next Steps for Procurement Managers
1. Screen suppliers using SourcifyChina’s 2026 Prefab Home Vetting Matrix (proprietary tool)
2. Conduct mandatory on-site audit – never rely on virtual tours alone for structural products
3. Engage target-market regulators early (e.g., HUD consultants for US projects)
™ SourcifyChina 2026 | Data-Driven Sourcing Intelligence for Complex Supply Chains
This report reflects verified 2025 supply chain data and 2026 regulatory projections. Not for redistribution.
Get the Verified Supplier List

SourcifyChina Sourcing Report 2026
Prepared for: Global Procurement Managers
Subject: Strategic Sourcing of China 2-Story Manufactured Homes
Executive Summary
In today’s competitive construction and real estate markets, speed, reliability, and cost-efficiency in procurement are non-negotiable. Sourcing 2-story manufactured homes from China presents significant cost advantages, but also notable risks—including supplier fraud, inconsistent quality, and project delays—when engaging unverified manufacturers.
SourcifyChina’s Verified Pro List for China 2-Story Manufactured Homes eliminates these risks by delivering pre-vetted, factory-audited suppliers with proven track records in international export compliance, structural engineering standards, and modular construction quality.
Why SourcifyChina’s Verified Pro List Saves Time & Reduces Risk
| Benefit | Impact on Procurement Cycle |
|---|---|
| Pre-Vetted Suppliers | Eliminates 40–60 hours of supplier research, background checks, and initial qualification |
| On-Site Factory Audits | Confirms production capacity, quality control systems, and export readiness—reducing audit costs by up to 70% |
| Verified Export Experience | Ensures suppliers understand Incoterms, customs documentation, and container loading protocols |
| Standardized RFQ Process | SourcifyChina manages bidding across 3–5 qualified suppliers, delivering comparable quotes within 5 business days |
| Dedicated Project Support | Single point of contact for technical clarifications, production updates, and shipment coordination |
Result: Reduce time-to-contract by up to 50% and mitigate supply chain disruptions before they occur.
Market Outlook: 2-Story Manufactured Homes (2026)
- Global demand for modular housing is projected to grow at 8.4% CAGR through 2026 (McKinsey, 2025).
- China remains the dominant exporter of cost-competitive, code-compliant manufactured homes, particularly for markets in North America, Australia, and the Middle East.
- Buyers who leverage verified sourcing channels report 30% higher on-time delivery rates and 22% lower rework costs (SourcifyChina Benchmark Survey, Q4 2025).
Call to Action: Accelerate Your 2026 Procurement Strategy
Don’t risk project timelines or capital efficiency on unverified suppliers. The SourcifyChina Verified Pro List gives you immediate access to trusted manufacturers of 2-story modular homes—saving time, reducing compliance risk, and ensuring predictable delivery.
Take the next step today:
📧 Email: [email protected]
📱 WhatsApp: +86 159 5127 6160
Our sourcing consultants will provide:
✅ Free supplier shortlist from the Verified Pro List
✅ Sample RFQ template tailored to 2-story home specifications
✅ Timeline and cost benchmarking for your target market