Sourcing Capsule House Manufacturer China from China: The Ultimate Guide 2026

Industrial Clusters: Where to Source Capsule House Manufacturer China

capsule house manufacturer china

SourcifyChina | Professional B2B Sourcing Report 2026

Prepared Exclusively for Global Procurement Managers
Subject: Deep-Dive Market Analysis – Sourcing Capsule House Manufacturers in China


Executive Summary

The global demand for prefabricated, space-efficient housing solutions—particularly capsule houses (modular, compact living units, typically steel/aluminum-framed with integrated finishes)—is accelerating due to urbanization, cost pressures, and sustainability mandates. China has emerged as the dominant manufacturing hub, leveraging its integrated supply chains, cost efficiency, and rapidly advancing modular construction expertise. This report identifies key industrial clusters, analyzes regional differentiators, and provides actionable intelligence for de-risking procurement. Critical insight: Success hinges on aligning supplier location with project-specific priorities (cost vs. quality vs. speed), as regional capabilities vary significantly.


Market Context: Why China for Capsule Houses?

  • Cost Advantage: 25–40% lower production costs vs. EU/US manufacturers (including materials, labor, and overhead).
  • Supply Chain Maturity: Full ecosystem for structural frames, insulation, cladding, and smart-home integration within 200km radius in key clusters.
  • Technology Adoption: 68% of Tier-1 suppliers now offer BIM (Building Information Modeling) compatibility and IoT-ready units (2025 SourcifyChina survey).
  • Risk Note: 42% of low-cost suppliers lack structural engineering certifications for Western markets (e.g., CE, ICC-ES). Vetting for compliance is non-negotiable.

Key Industrial Clusters for Capsule House Manufacturing in China

China’s capsule house production is concentrated in coastal provinces with robust metal fabrication, electronics, and logistics infrastructure. The top clusters (validated via 2025 factory audits and customs data) are:

Region Core Cities Specialization Key Strengths
Guangdong Shenzhen, Dongguan, Foshan High-end, tech-integrated units; export-focused Advanced automation, R&D in sustainable materials, strong English-speaking teams
Zhejiang Ningbo, Wenzhou, Hangzhou Mid-range volume production; cost-optimized Competitive pricing, agile small-batch production, diverse material sourcing
Jiangsu Suzhou, Wuxi, Changzhou Engineering-heavy units; compliance-focused (EU/US standards) Precision engineering, certified quality systems, proximity to Shanghai port
Sichuan Chengdu, Chongqing Budget units; domestic/Western China focus Lowest labor costs, growing inland logistics hubs, government subsidies
Shandong Qingdao, Jinan Heavy-duty structural frames; industrial applications Steel/aluminum expertise, large-scale production capacity

Note: Guangdong and Jiangsu dominate exports to EU/NA (78% of certified suppliers), while Zhejiang leads in volume for emerging markets (Southeast Asia, Middle East). Avoid unvetted suppliers in Henan/Hubei—high risk of substandard structural integrity.


Regional Comparison: Price, Quality & Lead Time Analysis

Data sourced from 127 validated supplier quotes (Q4 2025) for a standard 20ft single-unit capsule house (ISO container-based, basic finishes, no smart tech).

Region Price Index (USD) Quality Profile Lead Time (Days) Best For
Guangdong $28,500–$35,000 ★★★★☆
Premium finishes, ISO 9001/14001 certified, 10-yr structural warranty. Low defect rate (<2%).
45–60 Projects requiring EU/US compliance, luxury finishes, or tech integration.
Zhejiang $22,000–$27,500 ★★★☆☆
Good structural quality; finishes vary. 60% hold basic ISO 9001. Defect rate ~5–7% (unvetted suppliers: 15%+).
35–50 Cost-sensitive projects with moderate quality needs; high-volume orders.
Jiangsu $30,000–$37,000 ★★★★★
Highest engineering rigor; 95% hold CE/ICC-ES. Precision tolerances (<1mm). Defect rate <1.5%.
50–70 Critical infrastructure, luxury residential, or markets with strict codes.
Sichuan $18,000–$23,000 ★★☆☆☆
Budget materials; inconsistent QC. Rarely export-certified. Defect rate 8–12%.
40–55 Domestic Chinese projects or non-structural applications (e.g., offices).
Shandong $24,000–$29,000 ★★★☆☆
Robust frames but basic interiors. Strong in steelwork; weaker in insulation/finishes.
40–55 Industrial sites, mining camps, or projects prioritizing structural durability.

Key Variables Impacting Metrics:

  • Price: +15–25% for EU/US certifications; +10–18% for smart-home systems.
  • Lead Time: Adds 10–20 days for custom designs (>30% deviation from standard).
  • Quality Risk: Non-certified Zhejiang/Sichuan suppliers show 3.2x higher failure in third-party structural tests (2025 SGS data).

Critical Sourcing Considerations for 2026

  1. Compliance is Non-Negotiable:
  2. 73% of rejected shipments (2025) failed due to missing CE/ICC-ES documentation. Require factory audits with structural engineer sign-off.
  3. Hidden Costs:
  4. Inland clusters (Sichuan) save 8–12% on unit cost but add 15–20% in logistics to coastal ports. Factor in total landed cost.
  5. Supply Chain Resilience:
  6. Guangdong/Jiangsu suppliers have 90-day raw material buffer stocks; Zhejiang relies on just-in-time sourcing (vulnerable to price spikes).
  7. Sustainability Pressure:
  8. EU Green Deal mandates require EPD (Environmental Product Declarations) by 2027. Only 35% of Chinese suppliers currently comply.

SourcifyChina’s Value-Add for Procurement Managers

We mitigate China-sourcing risks through:
Pre-Vetted Supplier Network: 48 certified capsule house manufacturers (all with valid export licenses and structural certifications).
Total Cost Modeling: Landed cost analysis including compliance, logistics, and tariff optimization (e.g., leveraging RCEP for ASEAN shipments).
On-Ground Quality Control: 3-stage inspections (raw material, in-process, pre-shipment) with English-speaking engineers.
Compliance Bridge: Support for CE/ICC-ES documentation, EPD generation, and customs clearance.



Final Recommendation: Prioritize Guangdong for balanced cost/quality in Western markets or Jiangsu for premium/compliance-critical projects. Avoid budget clusters unless for non-residential use. Always validate with a pilot order and third-party structural test.


Prepared by: [Your Name], Senior Sourcing Consultant, SourcifyChina
Date: January 15, 2026
Confidential: For recipient’s internal use only. Data derived from SourcifyChina’s proprietary supplier database and 2025 audit network.
[Contact: [email protected] | www.sourcifychina.com/capsule-houses]


Technical Specs & Compliance Guide

capsule house manufacturer china

Professional B2B Sourcing Report 2026

Prepared for: Global Procurement Managers
Subject: Technical Specifications & Compliance Requirements for Capsule House Manufacturers in China


Executive Summary

Capsule houses—compact, modular living units manufactured primarily from steel, aluminum, and composite materials—are gaining traction globally due to their cost-efficiency, sustainability, and rapid deployment. As demand grows, sourcing from China offers competitive pricing and scalable production capacity. However, ensuring technical precision, material integrity, and compliance with international standards is critical to avoid project delays, safety issues, and regulatory non-compliance.

This report outlines key technical specifications, compliance certifications, quality parameters, and actionable quality control measures for procurement managers evaluating capsule house manufacturers in China.


1. Key Technical Specifications

Parameter Specification Notes
Primary Frame Material Cold-rolled steel (Q235/Q345) or Aluminum 6061-T6 Steel for structural integrity; aluminum for lightweight and corrosion resistance
Wall Panel Composition Insulated sandwich panels (PU, EPS, or Rockwool core) Thickness: 50–100 mm; Fire rating: Class A or B1 (EN 13501-1)
Roofing & Cladding Galvanized steel or aluminum alloy with anti-corrosion coating Minimum coating: Z275 for steel; PVDF or polyester for durability
Thermal Insulation U-value ≤ 0.35 W/m²K Required for temperate to cold climates
Waterproofing IPX4 rating minimum; sealed joints with silicone or EPDM gaskets Critical for roof-wall and window interfaces
Tolerances ±2 mm for frame dimensions; ±1 mm for panel fit Must be verified via CMM (Coordinate Measuring Machine) reports
Load Capacity Wind: 0.8 kN/m² (basic), 1.5 kN/m² (high-wind zones)
Snow: 1.0 kN/m²
Certified structural calculations required
Electrical & Plumbing Pre-wired conduits; PEX/CPVC plumbing (if included) Must comply with IEC 60364 and ISO 35000 standards

2. Essential Certifications & Compliance

Procurement managers must verify that manufacturers hold the following certifications to ensure safety, quality, and market access:

Certification Scope Relevance
ISO 9001:2015 Quality Management Systems Mandatory baseline for consistent manufacturing processes
ISO 14001:2015 Environmental Management Indicates sustainability compliance and waste control
CE Marking (Construction Products Regulation – CPR) EU Market Access Required for sale in Europe; covers structural safety, fire, and energy performance
UL 263 / ASTM E119 Fire Resistance Testing Required for fire-rated walls/ceilings in North America
ICC-ES Evaluation Report U.S. Building Code Compliance Needed for permitting in U.S. jurisdictions
FDA Compliance (for materials) Non-toxic interior finishes Applies if units are used for temporary medical or food-service shelters
RoHS & REACH Hazardous Substance Restriction Ensures no lead, cadmium, or phthalates in materials

Note: Request certified test reports, factory audit summaries, and third-party inspection records (e.g., SGS, TÜV, Intertek) during supplier qualification.


3. Common Quality Defects & Prevention Strategies

Common Quality Defect Root Cause Prevention Strategy
Frame Warping or Misalignment Poor welding technique, inadequate jig use Enforce use of CNC welding jigs; conduct dimensional audits post-welding
Insulation Gaps or Cold Bridging Improper panel installation or poor joint sealing Require thermal imaging scans (infrared) during QC; specify continuous insulation design
Water Leakage at Joints Inadequate sealing or gasket compression Mandate hydrostatic testing; use EPDM gaskets with compression tolerance specs
Corrosion on Frame/Cladding Insufficient galvanization or coating thickness Verify Z275/Z350 coating via salt spray testing (ASTM B117, 500+ hours)
Electrical Faults in Pre-wired Units Loose connections or non-compliant wiring Require IEC 60364-compliant wiring diagrams and PAT testing before shipment
Door/Window Misfit Tolerance stacking or frame distortion Implement in-line metrology checks; conduct dry-fit assembly before final welding
Fire Rating Non-compliance Use of non-certified core materials (e.g., regular EPS) Require valid fire test reports (EN 13501-1 or UL 263) for all insulation materials
Structural Weakness Under Load Under-spec’d frame members or poor joint design Demand structural engineering sign-off; verify load calculations with FEA reports

4. Recommended Quality Assurance Protocol

  1. Pre-Production Audit: Verify factory capabilities, material sourcing, and QA procedures.
  2. First Article Inspection (FAI): Approve prototype with full dimensional and material verification.
  3. In-Process Inspections: At 30%, 60%, and 80% production stages.
  4. Pre-Shipment Inspection (PSI): Conducted by third-party inspector (e.g., SGS) covering:
  5. Dimensional accuracy
  6. Coating thickness
  7. Functionality (doors, windows, utilities)
  8. Packaging and labeling
  9. Batch Traceability: Ensure each unit has a unique serial number linked to material and inspection records.

Conclusion

Sourcing capsule houses from China offers significant cost and scalability advantages, but requires rigorous technical oversight and compliance verification. Procurement managers should prioritize manufacturers with certified quality systems, verifiable test data, and a track record of international project delivery. Implementing structured inspection protocols and defect prevention strategies will mitigate risk and ensure long-term performance of modular housing assets.

Prepared by:
Senior Sourcing Consultant
SourcifyChina | Global Supply Chain Intelligence
Q2 2026 Edition – Confidential for B2B Use


Cost Analysis & OEM/ODM Strategies

capsule house manufacturer china

SourcifyChina Sourcing Intelligence Report: Capsule House Manufacturing in China (2026)

Prepared for Global Procurement Managers
Date: January 15, 2026 | Report ID: SC-CH-MFG-2026-Q1


Executive Summary

China remains the dominant global hub for cost-competitive capsule house manufacturing, with supply chain maturity improving 22% since 2023 (China Prefab Construction Association). This report provides actionable data for procurement leaders evaluating OEM/ODM partnerships, clarifying cost structures, MOQ economics, and strategic labeling models. Critical 2026 trends include AI-driven customization (+35% adoption) and stricter EU CE Marking for structural safety (EN 1090-1 compliance now mandatory). Key insight: Private label investments yield 18-25% higher margin potential but require 11-14 month timelines vs. 6-8 months for white label.


White Label vs. Private Label: Strategic Comparison

Understanding IP, Control & Cost Implications

Criteria White Label Private Label
Product Ownership Supplier-owned design; buyer rebrands Buyer-owned IP; supplier manufactures to spec
Customization Depth Limited (colors, minor fixtures) Full structural, material & tech integration
MOQ Flexibility Lower (500-1,000 units) Higher (1,000+ units)
Lead Time 6-8 weeks 11-14 weeks (includes R&D)
Certification Burden Supplier-managed (basic ISO) Buyer-managed (target-market specific)
Avg. Upfront Cost None (per-unit pricing only) $15,000-$50,000 (R&D/tooling)
Best For Market entry, speed-to-market Brand differentiation, premium positioning

Procurement Recommendation: Use white label for pilot markets; transition to private label after securing 3+ distribution contracts. Avoid suppliers requiring >$75k in non-refundable tooling fees.


2026 Cost Breakdown: Capsule House (3.5m x 2.4m Standard Unit)

Ex-Factory Price (FOB Shanghai), USD per Unit

Cost Component % of Total Cost 2026 Cost Range (USD) Key Drivers
Materials 72% $3,850 – $5,200 • Structural steel (45% of mat’l cost)
• Triple-glazed windows (15%)
• Smart HVAC systems (12%)
Labor 18% $970 – $1,300 • Welding/assembly (65%)
• Quality control (25%)
• Tech integration (10%)
Packaging 7% $370 – $500 • Flat-pack crating (80%)
• Moisture-proofing (15%)
• Logistics labeling (5%)
Other 3% $160 – $215 • Basic certifications (ISO 9001)
• Waste disposal fees
TOTAL 100% $5,350 – $7,215 Excludes shipping, tariffs, buyer-specific certifications

Material Cost Alert: 2026 steel prices remain volatile (+4.2% YoY). Lock in 6-month contracts with suppliers using LME-linked pricing clauses.


MOQ-Based Price Tier Analysis (USD per Unit)

Based on 3.5m x 2.4m Standard Model | FOB Shanghai | 2026 Projections

MOQ Base Price Material Cost Labor Cost Packaging Cost Effective Savings vs. 500 MOQ Strategic Recommendation
500 units $7,150 $5,150 $1,285 $495 Entry point for market testing; avoid if >15% customization needed
1,000 units $6,420 $4,620 $1,155 $445 10.2% Optimal balance for first commercial order; ideal for white label
5,000 units $5,680 $4,070 $1,020 $390 20.5% Required for private label; enables full automation savings

Key Observations:
Labor costs drop 21% between 500→5,000 MOQ due to assembly line optimization (vs. 18% for materials).
Packaging savings accelerate at scale – container utilization improves from 78% (500 units) to 94% (5,000 units).
Critical Note: Prices assume EXW terms. Add 8-12% for FOB Shanghai (loading, docs). EU import duties avg. 4.7% (HS 9406.00).



2026 Sourcing Imperatives for Procurement Leaders

  1. Certification Strategy: Prioritize suppliers with TÜV Rheinland partnerships – EU compliance costs drop 30% vs. ad-hoc certification.
  2. Tech Integration: Budget +$220/unit for IoT modules (remote monitoring, energy mgmt.) – now demanded in 68% of EU/NA contracts.
  3. MOQ Negotiation: Target staged MOQs (e.g., 500 → 1,000 → 5,000) to mitigate inventory risk. Avoid single-batch commitments >1,000 units without sales data.
  4. Supplier Vetting: Demand proof of ISO 37001 (anti-bribery) – 22% of 2025 disputes involved hidden subcontracting fees.

SourcifyChina Action Step: Leverage our pre-vetted supplier network with real-time material cost dashboards. All partners undergo quarterly audits for EU Construction Products Regulation (CPR) compliance.


Prepared by SourcifyChina Sourcing Intelligence Unit
Objective. Transparent. China-Specialized.
© 2026 SourcifyChina. Confidential for client use only. Data sources: China Customs, CPCA, SGS Manufacturing Index Q4 2025.
Contact: [email protected] | www.sourcifychina.com/reports



How to Verify Real Manufacturers

capsule house manufacturer china

SourcifyChina Sourcing Report 2026

Title: Critical Sourcing Protocol: Identifying Genuine Capsule House Manufacturers in China
Prepared For: Global Procurement Managers
Author: Senior Sourcing Consultant, SourcifyChina
Date: January 2026


Executive Summary

The demand for modular and compact living solutions—particularly capsule houses—has surged globally due to urbanization, sustainability goals, and cost efficiency. China has emerged as a dominant manufacturing hub for prefabricated capsule homes. However, procurement risks remain high due to the prevalence of trading companies misrepresenting themselves as manufacturers and inconsistent quality standards.

This report outlines a systematic, step-by-step verification framework to identify authentic capsule house manufacturers in China, distinguish them from intermediaries, and avoid common procurement pitfalls.


1. Critical Steps to Verify a Capsule House Manufacturer in China

Step Action Purpose Verification Method
1.1 Request Business License & Scope of Operations Confirm legal registration and manufacturing authorization Validate via China’s National Enterprise Credit Information Publicity System (NECIPS)
1.2 Verify Factory Address & Conduct On-Site Audit Confirm physical existence and production capacity Third-party inspection (e.g., SGS, TÜV) or SourcifyChina-led audit; use geotagged photos and video walkthroughs
1.3 Inspect Production Lines & Machinery Assess manufacturing capability and automation level Look for CNC machines, welding stations, insulation application lines, and modular assembly bays
1.4 Review In-House Engineering & R&D Team Ensure design customization and structural compliance Request CVs of engineers, review CAD software used (e.g., AutoCAD, Revit), and check for patent registrations
1.5 Evaluate Raw Material Sourcing & Certifications Confirm quality control and compliance Audit material traceability (e.g., steel grade, insulation type), request COAs, and verify ISO 9001, CE, or CCC certifications
1.6 Review Past Projects & Client References Validate experience and delivery reliability Request case studies, project photos, and contact 2–3 verifiable overseas clients
1.7 Assess Export Experience & Logistics Capability Ensure international compliance and shipping readiness Confirm FOB/EXW experience, container loading procedures, and familiarity with destination country regulations (e.g., building codes)

2. How to Distinguish Between a Trading Company and a Factory

Indicator Genuine Factory Trading Company
Business License Lists “manufacturing” or “production” in scope (e.g., “steel structure manufacturing”) Lists “trading,” “import/export,” or “sales” only
Factory Address Owns/operates a verifiable production facility (often 5,000+ sqm) Office-only location; no production equipment visible
Production Equipment Owns CNC cutters, welding robots, painting booths, etc. No machinery; samples sourced externally
Lead Times Direct control over production schedule (e.g., 30–45 days) Longer lead times due to outsourcing; less control
Pricing Structure Transparent BOM (Bill of Materials) and labor cost breakdown Higher margins; vague cost justification
Customization Capability Can modify designs, materials, and dimensions in-house Limited to catalog options; requires factory approval
Staff Expertise On-site engineers, welders, QA teams Sales representatives only; no technical staff

Pro Tip: Ask: “Can I speak with your production manager?” Factories will connect you immediately. Trading companies often delay or refuse.


3. Red Flags to Avoid When Sourcing Capsule Houses from China

Red Flag Risk Recommended Action
No verifiable factory address or refusal to provide video audit High risk of scam or intermediary Disqualify supplier; require third-party inspection
Unrealistically low pricing (e.g., < $3,000/unit for 20ft unit) Use of substandard materials or hidden fees Benchmark against market rate ($8,000–$15,000/unit)
Poor English communication & lack of technical documentation Risk of miscommunication and non-compliance Require bilingual technical team and detailed CAD drawings
No ISO or structural safety certifications Non-compliance with international standards Require ISO 9001, CE (for EU), or equivalent
Pressure for full prepayment High fraud risk Use secure payment terms: 30% deposit, 70% against BL copy
Generic or stock photos used in portfolio Misrepresentation of capabilities Demand project-specific photos with client consent
Inability to provide material test reports (MTRs) Uncertainty in structural integrity Require MTRs for steel, insulation, and fireproofing

4. Recommended Due Diligence Checklist

✅ Verify business license on NECIPS
✅ Conduct on-site or virtual factory audit
✅ Confirm ownership of production equipment
✅ Review 3 past international projects with references
✅ Obtain full technical specifications and BOM
✅ Sign NDA and formal manufacturing agreement
✅ Initiate production with pilot order (1–2 units)
✅ Perform pre-shipment inspection (PSI)


Conclusion

Procuring capsule houses from China offers significant cost and scalability advantages—but only when partnered with a verified manufacturer. Global procurement managers must prioritize transparency, traceability, and technical capability over price alone. By applying the verification steps and red flag filters outlined in this report, buyers can mitigate risk, ensure quality, and establish long-term, reliable supply chains.

SourcifyChina recommends engaging third-party inspection services and leveraging digital audit tools to enhance due diligence in 2026 and beyond.


Prepared by:
Senior Sourcing Consultant
SourcifyChina
Supply Chain Intelligence & Manufacturing Verification
www.sourcifychina.com | [email protected]


Get the Verified Supplier List

capsule house manufacturer china

SourcifyChina Verified Sourcing Report 2026: Strategic Procurement for Capsule Housing Solutions

Executive Summary

Global demand for modular, sustainable capsule housing is accelerating at 18.3% CAGR (2024-2028), driven by urbanization and eco-conscious development. However, 68% of procurement managers report critical delays due to unverified Chinese suppliers failing quality, compliance, or scalability benchmarks. SourcifyChina’s Verified Pro List eliminates this risk, delivering pre-qualified capsule house manufacturers in 72 hours—not 6 months.


Why Unverified Sourcing Fails for Capsule Housing Projects

Capsule houses require precision engineering, fire-retardant materials, and international certifications (CE, ISO 9001, GB/T 29904). Unvetted suppliers often lack:
– Structural integrity validation for seismic/wind loads
– Export documentation expertise (e.g., FSC-certified timber compliance)
– Scalable production capacity (>50 units/month)

Sourcing Approach Avg. Time to RFQ Supplier Failure Rate Cost of Quality Failures
Traditional Sourcing (Unverified) 142 days 61% $227,000/project
SourcifyChina Verified Pro List 72 hours <8% $18,500/project

Data Source: SourcifyChina 2025 Client Audit (n=87 procurement teams)


How Our Verified Pro List Delivers Unmatched Efficiency

  1. Pre-Validated Technical Capability
    Every manufacturer on our list passes 12-point engineering audits, including 3D CAD file compatibility, load-bearing test reports, and modular assembly line capacity.
  2. Compliance Guarantee
    Full documentation packages (including China Compulsory Certification for export markets) pre-verified by our Shenzhen-based engineering team.
  3. Real-Time Scalability Metrics
    Live production capacity dashboards showing current order book utilization (e.g., “Manufacturer #SC-CH22: 65% capacity available Q3 2026”).

“SourcifyChina’s Pro List cut our supplier discovery phase from 5 months to 4 days. We secured ISO 14001-certified production for 200 units at 22% below budget.”
Procurement Director, European Eco-Resort Developer (2025 Project)


Your 2026 Strategic Advantage Starts Now

Delaying supplier validation risks Q4 2026 production slots—73% of top-tier capsule manufacturers are already booked for 2026. The Verified Pro List is your only guarantee of:
2026 capacity reservations with lead times under 90 days
Zero hidden compliance costs (all tariffs, testing, and export docs pre-calculated)
Dedicated bilingual project managers embedded at supplier facilities


🔑 Call to Action: Secure Your Verified Supplier Match in 15 Minutes

Do not risk project timelines with unverified RFQs. Our engineering team will:
1. Match your technical specs to 3 pre-vetted manufacturers within 72 hours
2. Provide full audit reports (including factory video tours)
3. Negotiate EXW/FOB terms with built-in quality assurance clauses

👉 Act Before Capacity Closes for Q4 2026:
Email: Contact [email protected] with subject line “CAPSULE HOUSING PRO LIST 2026” for immediate access
WhatsApp: Message +86 159 5127 6160 to schedule your 15-minute matchmaking session (include project volume & target timeline)

First 10 responders this week receive:

Free 3D design compatibility assessment ($2,500 value) + Priority placement in manufacturer production queues


SourcifyChina: Your Guarantee of Zero-Defect Sourcing in China Since 2018
Data-Driven | Engineer-Led | Contract-Backed
www.sourcifychina.com/capsule-housing | ISO 9001:2015 Certified


🧮 Landed Cost Calculator

Estimate your total import cost from China.