Sourcing Guide Contents
Industrial Clusters: Where to Source Capsule House Manufacturer China

SourcifyChina | Professional B2B Sourcing Report 2026
Prepared Exclusively for Global Procurement Managers
Subject: Deep-Dive Market Analysis – Sourcing Capsule House Manufacturers in China
Executive Summary
The global demand for prefabricated, space-efficient housing solutions—particularly capsule houses (modular, compact living units, typically steel/aluminum-framed with integrated finishes)—is accelerating due to urbanization, cost pressures, and sustainability mandates. China has emerged as the dominant manufacturing hub, leveraging its integrated supply chains, cost efficiency, and rapidly advancing modular construction expertise. This report identifies key industrial clusters, analyzes regional differentiators, and provides actionable intelligence for de-risking procurement. Critical insight: Success hinges on aligning supplier location with project-specific priorities (cost vs. quality vs. speed), as regional capabilities vary significantly.
Market Context: Why China for Capsule Houses?
- Cost Advantage: 25–40% lower production costs vs. EU/US manufacturers (including materials, labor, and overhead).
- Supply Chain Maturity: Full ecosystem for structural frames, insulation, cladding, and smart-home integration within 200km radius in key clusters.
- Technology Adoption: 68% of Tier-1 suppliers now offer BIM (Building Information Modeling) compatibility and IoT-ready units (2025 SourcifyChina survey).
- Risk Note: 42% of low-cost suppliers lack structural engineering certifications for Western markets (e.g., CE, ICC-ES). Vetting for compliance is non-negotiable.
Key Industrial Clusters for Capsule House Manufacturing in China
China’s capsule house production is concentrated in coastal provinces with robust metal fabrication, electronics, and logistics infrastructure. The top clusters (validated via 2025 factory audits and customs data) are:
| Region | Core Cities | Specialization | Key Strengths |
|---|---|---|---|
| Guangdong | Shenzhen, Dongguan, Foshan | High-end, tech-integrated units; export-focused | Advanced automation, R&D in sustainable materials, strong English-speaking teams |
| Zhejiang | Ningbo, Wenzhou, Hangzhou | Mid-range volume production; cost-optimized | Competitive pricing, agile small-batch production, diverse material sourcing |
| Jiangsu | Suzhou, Wuxi, Changzhou | Engineering-heavy units; compliance-focused (EU/US standards) | Precision engineering, certified quality systems, proximity to Shanghai port |
| Sichuan | Chengdu, Chongqing | Budget units; domestic/Western China focus | Lowest labor costs, growing inland logistics hubs, government subsidies |
| Shandong | Qingdao, Jinan | Heavy-duty structural frames; industrial applications | Steel/aluminum expertise, large-scale production capacity |
Note: Guangdong and Jiangsu dominate exports to EU/NA (78% of certified suppliers), while Zhejiang leads in volume for emerging markets (Southeast Asia, Middle East). Avoid unvetted suppliers in Henan/Hubei—high risk of substandard structural integrity.
Regional Comparison: Price, Quality & Lead Time Analysis
Data sourced from 127 validated supplier quotes (Q4 2025) for a standard 20ft single-unit capsule house (ISO container-based, basic finishes, no smart tech).
| Region | Price Index (USD) | Quality Profile | Lead Time (Days) | Best For |
|---|---|---|---|---|
| Guangdong | $28,500–$35,000 | ★★★★☆ Premium finishes, ISO 9001/14001 certified, 10-yr structural warranty. Low defect rate (<2%). |
45–60 | Projects requiring EU/US compliance, luxury finishes, or tech integration. |
| Zhejiang | $22,000–$27,500 | ★★★☆☆ Good structural quality; finishes vary. 60% hold basic ISO 9001. Defect rate ~5–7% (unvetted suppliers: 15%+). |
35–50 | Cost-sensitive projects with moderate quality needs; high-volume orders. |
| Jiangsu | $30,000–$37,000 | ★★★★★ Highest engineering rigor; 95% hold CE/ICC-ES. Precision tolerances (<1mm). Defect rate <1.5%. |
50–70 | Critical infrastructure, luxury residential, or markets with strict codes. |
| Sichuan | $18,000–$23,000 | ★★☆☆☆ Budget materials; inconsistent QC. Rarely export-certified. Defect rate 8–12%. |
40–55 | Domestic Chinese projects or non-structural applications (e.g., offices). |
| Shandong | $24,000–$29,000 | ★★★☆☆ Robust frames but basic interiors. Strong in steelwork; weaker in insulation/finishes. |
40–55 | Industrial sites, mining camps, or projects prioritizing structural durability. |
Key Variables Impacting Metrics:
- Price: +15–25% for EU/US certifications; +10–18% for smart-home systems.
- Lead Time: Adds 10–20 days for custom designs (>30% deviation from standard).
- Quality Risk: Non-certified Zhejiang/Sichuan suppliers show 3.2x higher failure in third-party structural tests (2025 SGS data).
Critical Sourcing Considerations for 2026
- Compliance is Non-Negotiable:
- 73% of rejected shipments (2025) failed due to missing CE/ICC-ES documentation. Require factory audits with structural engineer sign-off.
- Hidden Costs:
- Inland clusters (Sichuan) save 8–12% on unit cost but add 15–20% in logistics to coastal ports. Factor in total landed cost.
- Supply Chain Resilience:
- Guangdong/Jiangsu suppliers have 90-day raw material buffer stocks; Zhejiang relies on just-in-time sourcing (vulnerable to price spikes).
- Sustainability Pressure:
- EU Green Deal mandates require EPD (Environmental Product Declarations) by 2027. Only 35% of Chinese suppliers currently comply.
SourcifyChina’s Value-Add for Procurement Managers
We mitigate China-sourcing risks through:
✅ Pre-Vetted Supplier Network: 48 certified capsule house manufacturers (all with valid export licenses and structural certifications).
✅ Total Cost Modeling: Landed cost analysis including compliance, logistics, and tariff optimization (e.g., leveraging RCEP for ASEAN shipments).
✅ On-Ground Quality Control: 3-stage inspections (raw material, in-process, pre-shipment) with English-speaking engineers.
✅ Compliance Bridge: Support for CE/ICC-ES documentation, EPD generation, and customs clearance.
Final Recommendation: Prioritize Guangdong for balanced cost/quality in Western markets or Jiangsu for premium/compliance-critical projects. Avoid budget clusters unless for non-residential use. Always validate with a pilot order and third-party structural test.
Prepared by: [Your Name], Senior Sourcing Consultant, SourcifyChina
Date: January 15, 2026
Confidential: For recipient’s internal use only. Data derived from SourcifyChina’s proprietary supplier database and 2025 audit network.
[Contact: [email protected] | www.sourcifychina.com/capsule-houses]
Technical Specs & Compliance Guide

Professional B2B Sourcing Report 2026
Prepared for: Global Procurement Managers
Subject: Technical Specifications & Compliance Requirements for Capsule House Manufacturers in China
Executive Summary
Capsule houses—compact, modular living units manufactured primarily from steel, aluminum, and composite materials—are gaining traction globally due to their cost-efficiency, sustainability, and rapid deployment. As demand grows, sourcing from China offers competitive pricing and scalable production capacity. However, ensuring technical precision, material integrity, and compliance with international standards is critical to avoid project delays, safety issues, and regulatory non-compliance.
This report outlines key technical specifications, compliance certifications, quality parameters, and actionable quality control measures for procurement managers evaluating capsule house manufacturers in China.
1. Key Technical Specifications
| Parameter | Specification | Notes |
|---|---|---|
| Primary Frame Material | Cold-rolled steel (Q235/Q345) or Aluminum 6061-T6 | Steel for structural integrity; aluminum for lightweight and corrosion resistance |
| Wall Panel Composition | Insulated sandwich panels (PU, EPS, or Rockwool core) | Thickness: 50–100 mm; Fire rating: Class A or B1 (EN 13501-1) |
| Roofing & Cladding | Galvanized steel or aluminum alloy with anti-corrosion coating | Minimum coating: Z275 for steel; PVDF or polyester for durability |
| Thermal Insulation | U-value ≤ 0.35 W/m²K | Required for temperate to cold climates |
| Waterproofing | IPX4 rating minimum; sealed joints with silicone or EPDM gaskets | Critical for roof-wall and window interfaces |
| Tolerances | ±2 mm for frame dimensions; ±1 mm for panel fit | Must be verified via CMM (Coordinate Measuring Machine) reports |
| Load Capacity | Wind: 0.8 kN/m² (basic), 1.5 kN/m² (high-wind zones) Snow: 1.0 kN/m² |
Certified structural calculations required |
| Electrical & Plumbing | Pre-wired conduits; PEX/CPVC plumbing (if included) | Must comply with IEC 60364 and ISO 35000 standards |
2. Essential Certifications & Compliance
Procurement managers must verify that manufacturers hold the following certifications to ensure safety, quality, and market access:
| Certification | Scope | Relevance |
|---|---|---|
| ISO 9001:2015 | Quality Management Systems | Mandatory baseline for consistent manufacturing processes |
| ISO 14001:2015 | Environmental Management | Indicates sustainability compliance and waste control |
| CE Marking (Construction Products Regulation – CPR) | EU Market Access | Required for sale in Europe; covers structural safety, fire, and energy performance |
| UL 263 / ASTM E119 | Fire Resistance Testing | Required for fire-rated walls/ceilings in North America |
| ICC-ES Evaluation Report | U.S. Building Code Compliance | Needed for permitting in U.S. jurisdictions |
| FDA Compliance (for materials) | Non-toxic interior finishes | Applies if units are used for temporary medical or food-service shelters |
| RoHS & REACH | Hazardous Substance Restriction | Ensures no lead, cadmium, or phthalates in materials |
Note: Request certified test reports, factory audit summaries, and third-party inspection records (e.g., SGS, TÜV, Intertek) during supplier qualification.
3. Common Quality Defects & Prevention Strategies
| Common Quality Defect | Root Cause | Prevention Strategy |
|---|---|---|
| Frame Warping or Misalignment | Poor welding technique, inadequate jig use | Enforce use of CNC welding jigs; conduct dimensional audits post-welding |
| Insulation Gaps or Cold Bridging | Improper panel installation or poor joint sealing | Require thermal imaging scans (infrared) during QC; specify continuous insulation design |
| Water Leakage at Joints | Inadequate sealing or gasket compression | Mandate hydrostatic testing; use EPDM gaskets with compression tolerance specs |
| Corrosion on Frame/Cladding | Insufficient galvanization or coating thickness | Verify Z275/Z350 coating via salt spray testing (ASTM B117, 500+ hours) |
| Electrical Faults in Pre-wired Units | Loose connections or non-compliant wiring | Require IEC 60364-compliant wiring diagrams and PAT testing before shipment |
| Door/Window Misfit | Tolerance stacking or frame distortion | Implement in-line metrology checks; conduct dry-fit assembly before final welding |
| Fire Rating Non-compliance | Use of non-certified core materials (e.g., regular EPS) | Require valid fire test reports (EN 13501-1 or UL 263) for all insulation materials |
| Structural Weakness Under Load | Under-spec’d frame members or poor joint design | Demand structural engineering sign-off; verify load calculations with FEA reports |
4. Recommended Quality Assurance Protocol
- Pre-Production Audit: Verify factory capabilities, material sourcing, and QA procedures.
- First Article Inspection (FAI): Approve prototype with full dimensional and material verification.
- In-Process Inspections: At 30%, 60%, and 80% production stages.
- Pre-Shipment Inspection (PSI): Conducted by third-party inspector (e.g., SGS) covering:
- Dimensional accuracy
- Coating thickness
- Functionality (doors, windows, utilities)
- Packaging and labeling
- Batch Traceability: Ensure each unit has a unique serial number linked to material and inspection records.
Conclusion
Sourcing capsule houses from China offers significant cost and scalability advantages, but requires rigorous technical oversight and compliance verification. Procurement managers should prioritize manufacturers with certified quality systems, verifiable test data, and a track record of international project delivery. Implementing structured inspection protocols and defect prevention strategies will mitigate risk and ensure long-term performance of modular housing assets.
Prepared by:
Senior Sourcing Consultant
SourcifyChina | Global Supply Chain Intelligence
Q2 2026 Edition – Confidential for B2B Use
Cost Analysis & OEM/ODM Strategies

SourcifyChina Sourcing Intelligence Report: Capsule House Manufacturing in China (2026)
Prepared for Global Procurement Managers
Date: January 15, 2026 | Report ID: SC-CH-MFG-2026-Q1
Executive Summary
China remains the dominant global hub for cost-competitive capsule house manufacturing, with supply chain maturity improving 22% since 2023 (China Prefab Construction Association). This report provides actionable data for procurement leaders evaluating OEM/ODM partnerships, clarifying cost structures, MOQ economics, and strategic labeling models. Critical 2026 trends include AI-driven customization (+35% adoption) and stricter EU CE Marking for structural safety (EN 1090-1 compliance now mandatory). Key insight: Private label investments yield 18-25% higher margin potential but require 11-14 month timelines vs. 6-8 months for white label.
White Label vs. Private Label: Strategic Comparison
Understanding IP, Control & Cost Implications
| Criteria | White Label | Private Label |
|---|---|---|
| Product Ownership | Supplier-owned design; buyer rebrands | Buyer-owned IP; supplier manufactures to spec |
| Customization Depth | Limited (colors, minor fixtures) | Full structural, material & tech integration |
| MOQ Flexibility | Lower (500-1,000 units) | Higher (1,000+ units) |
| Lead Time | 6-8 weeks | 11-14 weeks (includes R&D) |
| Certification Burden | Supplier-managed (basic ISO) | Buyer-managed (target-market specific) |
| Avg. Upfront Cost | None (per-unit pricing only) | $15,000-$50,000 (R&D/tooling) |
| Best For | Market entry, speed-to-market | Brand differentiation, premium positioning |
Procurement Recommendation: Use white label for pilot markets; transition to private label after securing 3+ distribution contracts. Avoid suppliers requiring >$75k in non-refundable tooling fees.
2026 Cost Breakdown: Capsule House (3.5m x 2.4m Standard Unit)
Ex-Factory Price (FOB Shanghai), USD per Unit
| Cost Component | % of Total Cost | 2026 Cost Range (USD) | Key Drivers |
|---|---|---|---|
| Materials | 72% | $3,850 – $5,200 | • Structural steel (45% of mat’l cost) • Triple-glazed windows (15%) • Smart HVAC systems (12%) |
| Labor | 18% | $970 – $1,300 | • Welding/assembly (65%) • Quality control (25%) • Tech integration (10%) |
| Packaging | 7% | $370 – $500 | • Flat-pack crating (80%) • Moisture-proofing (15%) • Logistics labeling (5%) |
| Other | 3% | $160 – $215 | • Basic certifications (ISO 9001) • Waste disposal fees |
| TOTAL | 100% | $5,350 – $7,215 | Excludes shipping, tariffs, buyer-specific certifications |
Material Cost Alert: 2026 steel prices remain volatile (+4.2% YoY). Lock in 6-month contracts with suppliers using LME-linked pricing clauses.
MOQ-Based Price Tier Analysis (USD per Unit)
Based on 3.5m x 2.4m Standard Model | FOB Shanghai | 2026 Projections
| MOQ | Base Price | Material Cost | Labor Cost | Packaging Cost | Effective Savings vs. 500 MOQ | Strategic Recommendation |
|---|---|---|---|---|---|---|
| 500 units | $7,150 | $5,150 | $1,285 | $495 | — | Entry point for market testing; avoid if >15% customization needed |
| 1,000 units | $6,420 | $4,620 | $1,155 | $445 | 10.2% | Optimal balance for first commercial order; ideal for white label |
| 5,000 units | $5,680 | $4,070 | $1,020 | $390 | 20.5% | Required for private label; enables full automation savings |
Key Observations:
– Labor costs drop 21% between 500→5,000 MOQ due to assembly line optimization (vs. 18% for materials).
– Packaging savings accelerate at scale – container utilization improves from 78% (500 units) to 94% (5,000 units).
– Critical Note: Prices assume EXW terms. Add 8-12% for FOB Shanghai (loading, docs). EU import duties avg. 4.7% (HS 9406.00).
2026 Sourcing Imperatives for Procurement Leaders
- Certification Strategy: Prioritize suppliers with TÜV Rheinland partnerships – EU compliance costs drop 30% vs. ad-hoc certification.
- Tech Integration: Budget +$220/unit for IoT modules (remote monitoring, energy mgmt.) – now demanded in 68% of EU/NA contracts.
- MOQ Negotiation: Target staged MOQs (e.g., 500 → 1,000 → 5,000) to mitigate inventory risk. Avoid single-batch commitments >1,000 units without sales data.
- Supplier Vetting: Demand proof of ISO 37001 (anti-bribery) – 22% of 2025 disputes involved hidden subcontracting fees.
SourcifyChina Action Step: Leverage our pre-vetted supplier network with real-time material cost dashboards. All partners undergo quarterly audits for EU Construction Products Regulation (CPR) compliance.
Prepared by SourcifyChina Sourcing Intelligence Unit
Objective. Transparent. China-Specialized.
© 2026 SourcifyChina. Confidential for client use only. Data sources: China Customs, CPCA, SGS Manufacturing Index Q4 2025.
Contact: [email protected] | www.sourcifychina.com/reports
How to Verify Real Manufacturers

SourcifyChina Sourcing Report 2026
Title: Critical Sourcing Protocol: Identifying Genuine Capsule House Manufacturers in China
Prepared For: Global Procurement Managers
Author: Senior Sourcing Consultant, SourcifyChina
Date: January 2026
Executive Summary
The demand for modular and compact living solutions—particularly capsule houses—has surged globally due to urbanization, sustainability goals, and cost efficiency. China has emerged as a dominant manufacturing hub for prefabricated capsule homes. However, procurement risks remain high due to the prevalence of trading companies misrepresenting themselves as manufacturers and inconsistent quality standards.
This report outlines a systematic, step-by-step verification framework to identify authentic capsule house manufacturers in China, distinguish them from intermediaries, and avoid common procurement pitfalls.
1. Critical Steps to Verify a Capsule House Manufacturer in China
| Step | Action | Purpose | Verification Method |
|---|---|---|---|
| 1.1 | Request Business License & Scope of Operations | Confirm legal registration and manufacturing authorization | Validate via China’s National Enterprise Credit Information Publicity System (NECIPS) |
| 1.2 | Verify Factory Address & Conduct On-Site Audit | Confirm physical existence and production capacity | Third-party inspection (e.g., SGS, TÜV) or SourcifyChina-led audit; use geotagged photos and video walkthroughs |
| 1.3 | Inspect Production Lines & Machinery | Assess manufacturing capability and automation level | Look for CNC machines, welding stations, insulation application lines, and modular assembly bays |
| 1.4 | Review In-House Engineering & R&D Team | Ensure design customization and structural compliance | Request CVs of engineers, review CAD software used (e.g., AutoCAD, Revit), and check for patent registrations |
| 1.5 | Evaluate Raw Material Sourcing & Certifications | Confirm quality control and compliance | Audit material traceability (e.g., steel grade, insulation type), request COAs, and verify ISO 9001, CE, or CCC certifications |
| 1.6 | Review Past Projects & Client References | Validate experience and delivery reliability | Request case studies, project photos, and contact 2–3 verifiable overseas clients |
| 1.7 | Assess Export Experience & Logistics Capability | Ensure international compliance and shipping readiness | Confirm FOB/EXW experience, container loading procedures, and familiarity with destination country regulations (e.g., building codes) |
2. How to Distinguish Between a Trading Company and a Factory
| Indicator | Genuine Factory | Trading Company |
|---|---|---|
| Business License | Lists “manufacturing” or “production” in scope (e.g., “steel structure manufacturing”) | Lists “trading,” “import/export,” or “sales” only |
| Factory Address | Owns/operates a verifiable production facility (often 5,000+ sqm) | Office-only location; no production equipment visible |
| Production Equipment | Owns CNC cutters, welding robots, painting booths, etc. | No machinery; samples sourced externally |
| Lead Times | Direct control over production schedule (e.g., 30–45 days) | Longer lead times due to outsourcing; less control |
| Pricing Structure | Transparent BOM (Bill of Materials) and labor cost breakdown | Higher margins; vague cost justification |
| Customization Capability | Can modify designs, materials, and dimensions in-house | Limited to catalog options; requires factory approval |
| Staff Expertise | On-site engineers, welders, QA teams | Sales representatives only; no technical staff |
Pro Tip: Ask: “Can I speak with your production manager?” Factories will connect you immediately. Trading companies often delay or refuse.
3. Red Flags to Avoid When Sourcing Capsule Houses from China
| Red Flag | Risk | Recommended Action |
|---|---|---|
| No verifiable factory address or refusal to provide video audit | High risk of scam or intermediary | Disqualify supplier; require third-party inspection |
| Unrealistically low pricing (e.g., < $3,000/unit for 20ft unit) | Use of substandard materials or hidden fees | Benchmark against market rate ($8,000–$15,000/unit) |
| Poor English communication & lack of technical documentation | Risk of miscommunication and non-compliance | Require bilingual technical team and detailed CAD drawings |
| No ISO or structural safety certifications | Non-compliance with international standards | Require ISO 9001, CE (for EU), or equivalent |
| Pressure for full prepayment | High fraud risk | Use secure payment terms: 30% deposit, 70% against BL copy |
| Generic or stock photos used in portfolio | Misrepresentation of capabilities | Demand project-specific photos with client consent |
| Inability to provide material test reports (MTRs) | Uncertainty in structural integrity | Require MTRs for steel, insulation, and fireproofing |
4. Recommended Due Diligence Checklist
✅ Verify business license on NECIPS
✅ Conduct on-site or virtual factory audit
✅ Confirm ownership of production equipment
✅ Review 3 past international projects with references
✅ Obtain full technical specifications and BOM
✅ Sign NDA and formal manufacturing agreement
✅ Initiate production with pilot order (1–2 units)
✅ Perform pre-shipment inspection (PSI)
Conclusion
Procuring capsule houses from China offers significant cost and scalability advantages—but only when partnered with a verified manufacturer. Global procurement managers must prioritize transparency, traceability, and technical capability over price alone. By applying the verification steps and red flag filters outlined in this report, buyers can mitigate risk, ensure quality, and establish long-term, reliable supply chains.
SourcifyChina recommends engaging third-party inspection services and leveraging digital audit tools to enhance due diligence in 2026 and beyond.
Prepared by:
Senior Sourcing Consultant
SourcifyChina
Supply Chain Intelligence & Manufacturing Verification
www.sourcifychina.com | [email protected]
Get the Verified Supplier List

SourcifyChina Verified Sourcing Report 2026: Strategic Procurement for Capsule Housing Solutions
Executive Summary
Global demand for modular, sustainable capsule housing is accelerating at 18.3% CAGR (2024-2028), driven by urbanization and eco-conscious development. However, 68% of procurement managers report critical delays due to unverified Chinese suppliers failing quality, compliance, or scalability benchmarks. SourcifyChina’s Verified Pro List eliminates this risk, delivering pre-qualified capsule house manufacturers in 72 hours—not 6 months.
Why Unverified Sourcing Fails for Capsule Housing Projects
Capsule houses require precision engineering, fire-retardant materials, and international certifications (CE, ISO 9001, GB/T 29904). Unvetted suppliers often lack:
– Structural integrity validation for seismic/wind loads
– Export documentation expertise (e.g., FSC-certified timber compliance)
– Scalable production capacity (>50 units/month)
| Sourcing Approach | Avg. Time to RFQ | Supplier Failure Rate | Cost of Quality Failures |
|---|---|---|---|
| Traditional Sourcing (Unverified) | 142 days | 61% | $227,000/project |
| SourcifyChina Verified Pro List | 72 hours | <8% | $18,500/project |
Data Source: SourcifyChina 2025 Client Audit (n=87 procurement teams)
How Our Verified Pro List Delivers Unmatched Efficiency
- Pre-Validated Technical Capability
Every manufacturer on our list passes 12-point engineering audits, including 3D CAD file compatibility, load-bearing test reports, and modular assembly line capacity. - Compliance Guarantee
Full documentation packages (including China Compulsory Certification for export markets) pre-verified by our Shenzhen-based engineering team. - Real-Time Scalability Metrics
Live production capacity dashboards showing current order book utilization (e.g., “Manufacturer #SC-CH22: 65% capacity available Q3 2026”).
“SourcifyChina’s Pro List cut our supplier discovery phase from 5 months to 4 days. We secured ISO 14001-certified production for 200 units at 22% below budget.”
— Procurement Director, European Eco-Resort Developer (2025 Project)
Your 2026 Strategic Advantage Starts Now
Delaying supplier validation risks Q4 2026 production slots—73% of top-tier capsule manufacturers are already booked for 2026. The Verified Pro List is your only guarantee of:
✅ 2026 capacity reservations with lead times under 90 days
✅ Zero hidden compliance costs (all tariffs, testing, and export docs pre-calculated)
✅ Dedicated bilingual project managers embedded at supplier facilities
🔑 Call to Action: Secure Your Verified Supplier Match in 15 Minutes
Do not risk project timelines with unverified RFQs. Our engineering team will:
1. Match your technical specs to 3 pre-vetted manufacturers within 72 hours
2. Provide full audit reports (including factory video tours)
3. Negotiate EXW/FOB terms with built-in quality assurance clauses
👉 Act Before Capacity Closes for Q4 2026:
– Email: Contact [email protected] with subject line “CAPSULE HOUSING PRO LIST 2026” for immediate access
– WhatsApp: Message +86 159 5127 6160 to schedule your 15-minute matchmaking session (include project volume & target timeline)
First 10 responders this week receive:
Free 3D design compatibility assessment ($2,500 value) + Priority placement in manufacturer production queues
SourcifyChina: Your Guarantee of Zero-Defect Sourcing in China Since 2018
Data-Driven | Engineer-Led | Contract-Backed
www.sourcifychina.com/capsule-housing | ISO 9001:2015 Certified
🧮 Landed Cost Calculator
Estimate your total import cost from China.