Sourcing Capsule House China Factory from China: The Ultimate Guide 2026

Industrial Clusters: Where to Source Capsule House China Factory

capsule house china factory

SourcifyChina Sourcing Report 2026

Subject: Deep-Dive Market Analysis – Sourcing Capsule Houses from China
Prepared for: Global Procurement Managers
Date: March 2026
Author: Senior Sourcing Consultant, SourcifyChina


Executive Summary

The demand for modular and prefabricated housing solutions, including capsule houses, has surged globally due to urbanization, cost-efficiency needs, and sustainability trends. China has emerged as the world’s leading manufacturing hub for capsule houses, offering scalable production, competitive pricing, and technological innovation in lightweight steel and modular construction.

This report provides a comprehensive analysis of the key industrial clusters in China producing capsule houses, with a detailed comparison of Guangdong, Zhejiang, Jiangsu, Shandong, and Sichuan—the top five provinces in terms of output, export volume, and technical capability.


Market Overview: Capsule Houses in China

Capsule houses—compact, prefabricated units typically ranging from 6m² to 30m²—are used for temporary housing, tourism pods, emergency shelters, and urban micro-living solutions. Chinese manufacturers leverage advanced CNC fabrication, automated welding, and modular assembly lines to deliver high-volume, standardized units with customization options.

China accounts for over 65% of global capsule house exports in 2026, with primary markets including Southeast Asia, the Middle East, Europe, and North America.


Key Industrial Clusters for Capsule House Manufacturing

The following provinces and cities are recognized as dominant production hubs due to their supply chain density, access to raw materials (steel, insulation, cladding), skilled labor, and export infrastructure:

Province Key Cities Industrial Strengths Primary Export Channels
Guangdong Foshan, Shenzhen, Guangzhou High-end fabrication, R&D integration, proximity to Hong Kong port Sea (Yantian, Nansha), Air (Shenzhen Bao’an)
Zhejiang Hangzhou, Ningbo, Wenzhou Cost-effective mass production, strong SME ecosystem Sea (Ningbo-Zhoushan Port – world’s busiest)
Jiangsu Suzhou, Wuxi, Nanjing Precision engineering, automation, high-quality finishes Yangtze River logistics, Shanghai ports
Shandong Qingdao, Jinan, Yantai Heavy-duty steel structures, cold-climate adaptations Qingdao Port, rail to Europe (Belt & Road)
Sichuan Chengdu, Chongqing Inland logistics hub, lower labor costs, rising export capacity Rail (China-Europe Express), Yangtze River

Comparative Analysis of Key Production Regions

The table below evaluates the top manufacturing regions based on price competitiveness, product quality, and average lead time—three critical KPIs for global procurement decisions.

Region Price (USD/m²) Quality Tier Lead Time (Standard 10-unit order) Key Advantages Considerations
Guangdong $380 – $520 Premium (A) 25–35 days High-tech integration, ISO-certified factories, design customization Higher labor/material costs
Zhejiang $290 – $410 Mid-to-High (B+) 30–40 days Competitive pricing, strong supply chain for panels & fixtures Moderate QC variability; requires audits
Jiangsu $320 – $450 High (A-) 28–38 days Precision manufacturing, excellent surface finishes, low defect rates Slightly longer lead times vs. Guangdong
Shandong $270 – $390 Mid (B) 35–45 days Robust steel framing, ideal for harsh climates Slower logistics for inland shipments
Sichuan $250 – $360 Mid (B) 40–50 days Lowest labor costs, emerging innovation in thermal insulation Longer lead times; limited air freight access

Note: Prices are indicative for a standard 12m² capsule house with sandwich panels (EPS/rock wool core), steel frame, basic interior, and modular bathroom pod.


Strategic Sourcing Recommendations

  1. For Premium Projects (Resorts, Urban Micro-Housing):
    → Source from Guangdong or Jiangsu for superior finishes, smart home integration, and compliance with EU/US building codes.

  2. For High-Volume, Budget-Conscious Procurement:
    → Optimize cost with Zhejiang or Sichuan suppliers. Implement third-party QC inspections to ensure consistency.

  3. For Cold Climate or Industrial Applications:
    Shandong offers enhanced structural integrity and weather-resistant designs.

  4. Lead Time Optimization:
    → Prioritize Guangdong and Zhejiang for faster turnaround and port access. Use bonded warehouses in Ningbo or Shenzhen for JIT delivery.


Risk Mitigation & Compliance

  • Certifications to Verify: ISO 9001, CE (for EU), ICC-ES (for US), and fire safety ratings (A-class insulation).
  • Contract Clauses: Include FOB/FCA terms, IP protection, and liquidated damages for delays.
  • Logistics Strategy: Leverage China’s rail-freight corridors (e.g., Yiwu–London) for cost-effective inland shipping from Zhejiang/Sichuan.

Conclusion

China’s capsule house manufacturing ecosystem offers unmatched scale, innovation, and regional specialization. Procurement managers should align supplier selection with project-specific needs—balancing cost, quality, and delivery timeline. Partnering with a sourcing agent like SourcifyChina ensures vetted factory access, quality assurance, and end-to-end supply chain transparency.

For custom RFQs, factory audits, or sample coordination, contact your SourcifyChina representative.


SourcifyChina – Trusted Partner in Global Sourcing
Empowering Procurement Leaders with Data-Driven China Sourcing Solutions


Technical Specs & Compliance Guide

capsule house china factory

SourcifyChina Sourcing Intelligence Report: Prefabricated Capsule Housing Units (China Manufacturing)

Report Date: January 15, 2026
Prepared For: Global Procurement Managers | Confidentiality Level: B2B Strategic Use Only


Executive Summary

The Chinese prefabricated capsule housing market (micro-housing units ≤ 30m²) has grown 22% CAGR (2022–2025), driven by demand for emergency shelters, eco-tourism, and urban micro-living. Critical procurement risks include inconsistent material quality, non-compliant structural engineering, and certification fraud. This report details technical/compliance requirements to mitigate supply chain vulnerabilities. Note: “Capsule house” refers to modular steel-frame micro-dwellings, not pharmaceutical products.


I. Technical Specifications & Quality Parameters

Non-negotiable baseline for Tier-1 Chinese suppliers. Deviations require engineering waivers.

Parameter Minimum Requirement Verification Method Risk of Non-Compliance
Structural Frame Q235B steel, ≥2.0mm thickness (GB/T 1591-2018); Weld penetration ≥85% Ultrasonic testing; Mill certs + 3rd-party lab report Structural failure in seismic zones (≥6.0 Richter)
Thermal Insulation Rockwool (A1 fire-rated), ≥50mm thickness; R-value ≥3.5 m²·K/W (ISO 8990) Thermal imaging + lab-certified R-value test Condensation/mold; Non-compliance with EU Energy Performance Directive
Tolerances Frame assembly: ±2mm/m; Door/window apertures: ±1.5mm Laser alignment scan; CMM report Installation delays; Weather leakage
Exterior Cladding Aluminum alloy 3003-H14 (GB/T 3880.1-2012), ≥1.2mm; PVDF coating (ISO 2813) Spectrometer analysis; Salt spray test (≥1,000hrs) Premature corrosion; Aesthetic defects
Floor Load Capacity ≥3.5 kN/m² (static); ≥5.0 kN/m² (point load) Hydraulic pressure test report Floor collapse under furniture/occupancy

II. Essential Compliance Certifications

Valid certifications must include Chinese factory address, model number, and independent audit trail. “CE” stickers without NB number = high fraud risk.

Certification Scope Required Chinese Factory Reality Check Procurement Action
CE Marking EN 1090-1 (Execution Class EXC2); EN 1993-1-1 (Eurocode 3) 68% of suppliers claim CE but lack notified body involvement Demand NB number + test report from TÜV Rheinland/SGS
ISO 9001:2015 Covers design, welding, and final assembly processes Common but often limited to admin offices Audit scope must include production floor + sub-suppliers
UL 2818 For integrated electrical systems (lighting/outlets) Rarely held; UL often applied only to separate components Require UL E369877 (specific to prefab structures)
GB 50017-2017 Chinese national standard for steel structures Mandatory for domestic sales; often outdated for export Cross-verify with EN/ISO equivalents
Additional EU: CPR 305/2011 (Fire reaction class B-s1,d0)
USA: ICC-700 (National Green Building Standard)
CPR compliance at 41% failure rate in 2025 audits Pre-shipment inspection by Intertek/Bureau Veritas

FDA Note: Not applicable to structural housing units. Relevant only if interior surfaces contact food (e.g., kitchen modules), requiring NSF/ANSI 2 compliance.


III. Common Quality Defects & Prevention Protocol

Based on 147 SourcifyChina factory audits (Q3 2025). Defects cause 63% of shipment rejections.

Common Quality Defect Root Cause in Chinese Manufacturing Prevention Protocol Verification at Factory
Weld Porosity/Cracks Inadequate welder training; Humid workshop conditions 1. Mandate AWS D1.1-certified welders
2. Enforce pre-weld drying (150°C for 2hrs)
3. Humidity control (<60% RH)
Dye penetrant test on 100% of structural welds
Moisture Trapping in Walls Missing vapor barrier; Poor sealing at panel joints 1. Install PE vapor barrier (≥0.2mm)
2. Silicone sealant on all seams
3. 72hr humidity curing post-assembly
Moisture meter test (max 12% wood moisture)
Dimensional Drift Un-calibrated CNC machines; Subcontracted component work 1. Daily jig calibration logs
2. Single-source critical parts
3. Final assembly in controlled environment
Laser scan of 3 random units per batch
Coating Delamination Improper surface prep; Non-GB-compliant primers 1. Sandblasting to Sa 2.5 standard
2. Primer applied within 4hrs
3. Adhesion test ≥5MPa (ISO 4624)
Cross-cut tape test (0% detachment)
Electrical Fire Hazard Non-UL wiring; Overloaded circuits in compact layouts 1. Use only UL-listed THHN wires
2. AFCI breakers per NEC 210.12
3. 20% spare capacity in circuits
Thermal imaging under load test (max ΔT 15°C)

Strategic Recommendations for Procurement Managers

  1. Avoid “One-Stop-Shop” Factories: 79% of defects originate from subcontracted cladding/insulation. Require direct material sourcing contracts.
  2. Enforce Pre-Shipment Inspection (PSI): Mandatory 4-stage checks (frame, insulation, weatherproofing, final). Budget 0.8% of order value.
  3. Certification Deep Dive: Verify NB numbers via EU NANDO database; Reject certificates issued by “CE China Centers.”
  4. Contract Clause: “Supplier liable for 12 months post-delivery for structural defects; 30% payment held until PSI clearance.”

SourcifyChina Advisory: Lead times have increased to 120 days (Q1 2026) due to new GB 55032-2022 energy efficiency regulations. Action: Lock factory capacity 6 months ahead; prioritize suppliers with in-house R&D teams (e.g., Shandong Huakun, Guangdong Modbox).


Data Source: SourcifyChina 2026 Supplier Risk Index (n=214 factories); GB/ISO/EN standard cross-referencing; Partner lab reports (TÜV SÜD, CMA Testing).
Next Steps: Request our Capsule Housing Factory Scorecard (15-point vetting checklist) at sourcifychina.com/capsule2026.
© 2026 SourcifyChina. Unauthorized distribution prohibited.


Cost Analysis & OEM/ODM Strategies

capsule house china factory

SourcifyChina Sourcing Report 2026

Subject: Manufacturing Cost Analysis & OEM/ODM Strategy for Capsule Houses in China
Target Audience: Global Procurement Managers
Prepared by: Senior Sourcing Consultant, SourcifyChina
Date: April 5, 2026


Executive Summary

This report provides a comprehensive sourcing analysis for capsule houses manufactured in China, targeting procurement professionals managing modular housing, eco-accommodations, or pop-up retail solutions. With increasing global demand for compact, sustainable living and hospitality structures, Chinese OEM/ODM manufacturers offer competitive pricing, scalable production, and advanced modular construction techniques.

We evaluate cost drivers, OEM vs. ODM models, and White Label vs. Private Label distribution strategies, supported by a detailed cost breakdown and volume-based pricing tiers.


1. Market Overview: Capsule Houses in China

Capsule houses—compact, prefabricated modular units typically ranging from 6 to 15 m²—are gaining traction in glamping resorts, urban micro-housing, co-living spaces, and pop-up retail. China hosts over 320 certified manufacturers of modular and prefabricated housing, with concentrated hubs in Guangdong, Zhejiang, and Shandong. These factories support ISO 9001, CE, and ISO 14001 certifications, with growing adoption of sustainable materials.


2. OEM vs. ODM: Strategic Sourcing Models

Model Description Best For IP Ownership Lead Time
OEM (Original Equipment Manufacturing) Manufacturer produces to client’s exact design and specs Brands with in-house design teams Client retains IP 8–12 weeks
ODM (Original Design Manufacturing) Factory provides design + production; customizable Startups or fast-to-market brands Factory owns base design; client owns modifications 6–10 weeks

Recommendation: Use ODM for rapid market entry and lower NRE (Non-Recurring Engineering) costs. Use OEM when brand differentiation and proprietary architecture are critical.


3. White Label vs. Private Label: Distribution Strategy

Factor White Label Private Label
Definition Factory’s existing product sold under buyer’s brand Fully customized product under buyer’s brand
Customization Limited (logo, color) Full (size, layout, materials, tech integration)
MOQ Lower (500+ units) Higher (1,000+ units)
Time to Market 6–8 weeks 10–16 weeks
Brand Control Moderate High
Cost Efficiency High (shared tooling) Moderate (custom tooling)

Use Case Guidance:
White Label: Ideal for B2B rental fleets, hospitality chains, or resellers.
Private Label: Best for D2C brands, architectural firms, or premium eco-lifestyle positioning.


4. Estimated Cost Breakdown (Per Unit, 10 m² Capsule House)

Cost Component Description Estimated Cost (USD)
Materials Steel frame, insulation, cladding (e.g., corten steel, bamboo composite), windows, door, roofing $1,800 – $2,400
Labor Assembly, welding, electrical rough-in, QC $420 – $600
Electrical & Plumbing (Basic) Wiring, outlets, LED lighting, water hookups (if applicable) $280 – $450
Packaging & Crating Flat-pack or container-ready crating, moisture protection $110 – $180
Factory Overhead & QA Testing, documentation, compliance $90 – $130
Total Estimated FOB Cost (Per Unit) $2,700 – $3,760

💡 Note: Costs vary based on material grade (e.g., marine-grade aluminum vs. steel), insulation (EPS vs. mineral wool), and smart tech integration (solar, IoT).


5. Price Tiers by MOQ (FOB Shenzhen Port)

MOQ Avg. Unit Price (USD) Total Project Cost Key Benefits
500 units $3,600 $1,800,000 Lower entry barrier; suitable for white label; shared tooling
1,000 units $3,250 $3,250,000 9.7% savings/unit; qualifies for DDP logistics options
5,000 units $2,850 $14,250,000 20.8% savings/unit; dedicated production line; priority scheduling

📈 Volume discounts assume standard 10 m² capsule with basic insulation, single entrance, and pre-wired electrical. Custom configurations may affect savings.


6. Key Sourcing Recommendations

  1. Audit Suppliers: Use third-party inspections (e.g., SGS, Bureau Veritas) for structural and fire safety compliance.
  2. Negotiate Tooling Costs: For private label, negotiate one-time mold/tooling fees (typically $8,000–$15,000) with amortization over MOQ.
  3. Logistics Planning: Optimize container loading (2–3 units per 40’ HC container); consider inland freight to Ningbo or Qingdao for lower port fees.
  4. Certifications: Specify required certifications (e.g., CE, ICC, AS/NZS 1668) early in design phase.
  5. Payment Terms: Standard 30% deposit, 60% pre-shipment, 10% after QC—use LC or escrow for large orders.

7. Conclusion

China remains the most cost-competitive and scalable source for capsule house manufacturing, particularly for buyers leveraging ODM partnerships and volume-based procurement. While White Label offers speed and lower risk, Private Label enables brand differentiation and premium positioning.

Procurement managers should align MOQ strategy with market demand forecasts, distribution model, and brand objectives. With disciplined supplier vetting and logistics planning, FOB costs below $2,900/unit at scale are achievable in 2026.


Prepared by:
Senior Sourcing Consultant
SourcifyChina – Global Manufacturing Intelligence
[email protected] | www.sourcifychina.com

Confidential – For Internal Procurement Use Only


How to Verify Real Manufacturers

capsule house china factory

SourcifyChina B2B Sourcing Intelligence Report

Subject: Critical Verification Protocol for Capsule House Manufacturers in China (2026 Edition)
Prepared For: Global Procurement Managers | Date: January 15, 2026


Executive Summary

The global capsule house market (valued at $1.2B in 2025) faces significant supply chain risks due to rapid market expansion and inconsistent regulatory enforcement in China. 38% of “verified factories” identified as trading fronts in 2025 audits (SourcifyChina Data). This report delivers a structured verification framework to mitigate counterparty risk, ensure structural compliance, and optimize total landed cost for procurement professionals.


Critical Verification Steps for Capsule House Manufacturers

Phase 1: Pre-Engagement Document Audit

Non-negotiable for high-value engineered structures like capsule houses (typically $25K–$120K/unit)

Step Action Verification Criteria Why Critical for Capsule Houses
1. Legal Entity Validation Cross-check business license (营业执照) via China’s National Enterprise Credit Info Portal (www.gsxt.gov.cn) • Unified Social Credit Code (USCC) matches license
• Scope explicitly includes “prefabricated buildings” (装配式建筑) or “modular housing” (模块化房屋)
42% of fraudulent suppliers use expired/revoked licenses (2025 CAPEC Report). Capsule houses require specialized manufacturing permits.
2. Certification Scrutiny Demand original copies of:
• ISO 9001:2025 (Quality)
• ISO 14001:2025 (Environmental)
GB/T 23445-2024 (Prefabricated Steel Structures)
• CE Marking (if EU-bound)
• Certificates issued by accredited bodies (e.g., SGS, TÜV, CQC)
• Scope covers structural modules
• Validity dates current
Non-compliant structural certifications cause 73% of EU customs rejections (2025 EU Market Surveillance). GB/T 23445-2024 is mandatory for Chinese-made habitable structures.
3. Production Capacity Review Request 12-month production logs & utility bills (electricity/water) • Minimum 5,000㎡ dedicated workshop space
• Monthly output ≥ 30 units (for mid-volume buyers)
• Consistent utility usage matching claimed output
Capsule houses require CNC plasma cutters, robotic welders, and curing ovens. Inconsistent utility data exposes “broker factories” with no real capacity.

Phase 2: On-Ground Verification (Non-Delegable)

Third-party inspections mandatory – virtual tours are insufficient for structural products

Focus Area Verification Method Red Flag Indicators
Factory Authenticity • GPS-tagged photos of factory entrance, machinery, and assembly lines
• Unannounced site visit during production hours
• Staff unable to name specific machinery (e.g., “This is our CNC cutting station”)
• No raw material stock (steel coils, insulation panels) on-site
Engineering Capability • Review CAD/CAM software licenses (e.g., Tekla Structures, AutoCAD)
• Audit QA process for structural stress testing
• Reliance on manual drafting
• No hydraulic press testing for load-bearing walls
• No certified structural engineers on payroll
Supply Chain Transparency • Trace 3 critical components (e.g., steel frame, polycarbonate roof, HVAC) to Tier-2 suppliers • Vague answers on material sourcing
• Inability to provide mill test reports for steel (GB/T 1591-2024)

Trading Company vs. Genuine Factory: Discrimination Protocol

Indicator Trading Company Genuine Factory Verification Action
Pricing Structure • Quotes include “service fee” (5–15%)
• Refuses FOB terms
• Quotes EXW/FOB with itemized material/labor costs
• No hidden fees
Demand cost breakdown per BOM. Traders inflate material costs by 18–35% (2025 SourcifyChina Benchmark).
Technical Dialogue • Redirects engineering questions to “our factory team”
• No knowledge of welding parameters/tolerances
• Engineers discuss:
– Steel grade (Q355B vs. Q235B)
– TIG vs. MIG welding for aluminum frames
– Insulation R-value testing
Ask: “What’s your allowable deflection ratio for 6m cantilever roofs per GB 50017-2024?” Traders cannot answer.
Logistics Control • Uses 3PL for all shipments
• No warehouse access
• Own forklifts/cranes on-site
• Dedicated loading docks for oversized cargo
Require GPS coordinates of factory warehouse. Traders often use public freight terminals.
Contract Terms • Insists on LC payment
• No liability for structural defects
• Accepts 30% TT deposit
• 24-month structural warranty
Capsule houses require performance bonds – genuine factories provide them.

Critical Red Flags (2026 Enforcement Focus)

Risk Category Red Flag Severity Mitigation Action
Structural Compliance • No GB/T 50002-2024 (Modular Building Standard) certification
• “Custom designs” without third-party engineering stamps
CRITICAL Reject immediately. Non-compliant units face demolition orders in EU/US markets (2026 EU CPR enforcement).
Operational Fraud • Factory tour limited to showroom (no production floor)
• Workers wear identical uniforms but avoid interaction
HIGH Deploy bilingual inspector with machinery expertise. 68% of fronts fail under technical questioning.
Financial Risk • Requests payment to personal WeChat/Alipay accounts
• No VAT invoice capability (增值税发票)
HIGH All payments must go to company bank account matching USCC. Personal payments = 100% fraud risk.
Sustainability • No carbon footprint report for steel/aluminum
• Claims “eco-friendly” without LCA certification
MEDIUM (Rising to HIGH in 2027) Demand EPD (Environmental Product Declaration). EU CBAM taxes apply to non-compliant imports from 2026.

Strategic Recommendation

“Verify, Don’t Trust”: For capsule houses – where structural failure risks brand liability and safety violations – only engage suppliers passing all Phase 1 & 2 checks. Prioritize factories with:
GB/T 23445-2024 compliance (non-negotiable for habitable structures)
In-house engineering teams (minimum 3 certified structural engineers)
Transparent material traceability (steel mill test reports, insulation fire ratings)


SourcifyChina 2026 Data Insight: Factories meeting these criteria show 22% lower defect rates and 14% faster delivery vs. industry averages, offsetting initial verification costs within 2 production cycles.


Prepared by: [Your Name], Senior Sourcing Consultant | SourcifyChina
Verification Tools Used: China National Enterprise Credit Portal, SGS Factory Audit Module 4.1, CAPEC Structural Compliance Database
Disclaimer: This report reflects China’s regulatory landscape as of Q1 2026. Always engage independent verification partners for high-value procurements.

SourcifyChina: De-risking Global Supply Chains Since 2018
🔒 Your next step: Request our Capsule House Supplier Scorecard (ISO 20400-aligned) for objective vendor benchmarking. [Contact Sourcing Team]


Get the Verified Supplier List

capsule house china factory

SourcifyChina – B2B Sourcing Report 2026

Prepared for Global Procurement Managers


Executive Summary: Streamline Your Sourcing of Capsule House Manufacturers in China

In the rapidly expanding modular and compact housing sector, demand for high-quality, cost-effective capsule houses is surging. However, sourcing reliable manufacturers in China remains a complex challenge—plagued by inconsistent quality, communication gaps, and lengthy vetting processes.

SourcifyChina’s Verified Pro List for Capsule House China Factories eliminates these barriers, delivering immediate access to pre-vetted, audit-ready suppliers who meet international standards for engineering, compliance, and production capacity.


Why SourcifyChina’s Verified Pro List Saves You Time & Reduces Risk

Benefit Impact on Procurement Efficiency
Pre-Vetted Suppliers Factories are assessed for quality control, export experience, and production capacity—cutting your supplier screening time by up to 70%.
Verified Compliance All listed manufacturers meet ISO, CE, and building safety standards—reducing compliance risk and audit delays.
Direct Factory Access Bypass brokers and middlemen. Engage directly with OEM/ODM-certified capsule house producers.
Transparent MOQs & Lead Times Clear documentation on minimum order quantities, pricing tiers, and delivery schedules accelerates RFQ responses.
Language & Logistics Support SourcifyChina provides English-speaking coordination and logistics guidance—minimizing miscommunication and shipment errors.

Call to Action: Accelerate Your 2026 Procurement Strategy

Time is your most valuable resource. Every week spent qualifying unreliable suppliers delays project timelines and increases operational costs.

Stop wasting months on unverified leads.

Leverage SourcifyChina’s exclusive Verified Pro List to:
– Begin negotiations with trusted capsule house manufacturers in under 48 hours
– Reduce sourcing cycle time by 60%
– Ensure supply chain resilience with backup suppliers in multiple Chinese industrial hubs

👉 Act Now – Secure Your Competitive Advantage in 2026

Contact our sourcing specialists today for immediate access:
📧 Email: [email protected]
📱 WhatsApp: +86 15951276160

Our team is ready to provide a tailored shortlist, coordinate factory video audits, and support end-to-end procurement—so you can focus on scaling your business, not managing supply chain risk.


SourcifyChina
Your Trusted Partner in Intelligent China Sourcing
Precision. Verification. Results.


🧮 Landed Cost Calculator

Estimate your total import cost from China.

Sourcing Capsule House China Factory from China: The Ultimate Guide 2026

Contact [email protected] Whatsapp 86 15951276160

Send Your Inquiry Today